Search Documents

  • AUSIMM
    Cuprous Hydrometallurgy. Part V. Leaching of Copper-Lead Matte with Copper(II) Sulphate in Aqueous Acetonitrile

    By Parker A. J, Giles D. E

    Solutions of copper(II) sulphate in acidified aqueous acetonitrile leach copper from copper-lead matte derived from the drossing of lead with sulphur to produce solutions of copper(I) sulphate. The re

    Jan 1, 1979

  • DFI
    Deep Foundations On Deer Island

    By Michael W. Oakland

    Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.

    Jan 1, 1994

  • SME
    McAlpine Mill and Haileybury School of Mines: A Co-op That Works

    By Kevin Beirne

    Most people involved in the mining industry are familiar with student-industry co-op work-study programs. Many colleges and universities have used them for years. Northern College’s Haileybury Schoo

    Jan 1, 1999

  • NIOSH
    IC 8584 Mechanical Properties And Cutting Characteristics Of Coal

    By Parviz F. Rad

    This Bureau of Mines report reviews laboratory and in-mine techniques for determining mechanical properties of coals, with special emphasis on the relationship between these properties and the minabil

    Jan 1, 1973

  • DFI
    Army Corps of Engineers Seepage Control Cutoffs for Dam and Levees Engineering Manual (EM)

    By David B. Paul

    "ABSTRACTThe US Army Corps of Engineers (USACE) has 704 dams in their inventory and over 100,000 miles of levees with a capital value of over $150 billion. Currently, there are 319 dams that are class

    Jan 1, 2014

  • DFI
    Design And Performance Evaluation Of Bored Piles In Sand

    By Ashutosh S. Dhar

    Cast-in-place piles were examined in this paper from the viewpoints of construction quality, axial capacity, and load-displacement responses. The results of ten 450 mm diameter (18? f) bored piles, in

    Jan 1, 2006

  • CIM
    Promoting Energy Efficiency Stuidies during Mineral Processing Plant Design

    By A. Tylczak, C. Shook, A. Doogan-Smith, S. Loif, B. Hilscher, P. Nayak

    "This paper discusses how to effectively conduct energy efficiency studies during the design of new mineral processing plants and plant expansions. Energy management studies for new plants are ideally

    Jan 1, 2016

  • AUSIMM
    The Code of Practice for Risk Management of Tunnel Works - Future Tunnelling Insurance from the InsurerÆs Point of View

    The objectives of this paper are to introduce the International Code of Practice for Risk Management of Tunnel Works and to illustrate to the participants of the 13th Australian Tunnelling Conference

    Jan 1, 2008

  • AUSIMM
    Timbering and its Importance in Making Estimates of Cost

    The importance of timbering, not only from a financial point of view but from an actual mining point of view, is so often overlooked or slightly glossed over by the average expert and investor, that I

    Jan 1, 1901

  • NIOSH
    IC 8208 Loading And Transportation At Zinc-Lead Mines, The Eagle-Picher Co., Jo Daviess County, Ill. And Lafayette County, Wis.

    By William A. Beck

    This report describes the loading and transportation practices employed at the zinc-lead mines of The Eagle-Picher Co., Jo Daviess County, Ill., and Lafayette County, Wis. The report also gives a brie

    Jan 1, 1964

  • AUSIMM
    An Analysis of the Performance of a Ball Mill Rake Classifier Comminution Circuit

    An extensive series of tests was carried out on a ball mill-rake classifier circuit in the New Broken Hill Consolidated Ltd. concentrator. The data were used to develop a mathematical model of the ope

    Jan 1, 1967

  • IIMP
    Concentradora Atacocha: Reingeniería alta rentabilidad

    By Marcos Villegas

    El presente texto describe el desarrollo del sistema de gestión de riesgos en la reingeniería de procesos, justificando la inversión en gestión de riesgos de la concentradora Atacocha donde se protege

    Sep 9, 2007

  • AUSIMM
    Some Aspects of Suction Dredge Design

    Important factors in dredge design are the estimation of total head, and the determination of flow in and around suction nozzles and in pipe lines. Total head for the dredge pump is calculated from ve

    Jan 1, 1962

  • AUSIMM
    Boring a Slime Dam

    By Met B

    IN the followmg paper an account is given of work performed by the author for the purpose of sampling a slime dam on the leases of the North Mount Farrell Co. N.L., at Tullah, Tasmania, during the sum

    Jan 1, 1928

  • AUSIMM
    X-Ray Diffraction Analysis of Broken Hill Dusts

    The problems of using comparatively simple x-ray diffraction equipment for quantitative analysis are examined. Internal standard and direct calibration procedures based upon the measurement of integra

    Jan 1, 1968

  • SME
    Preventing Roof Falls in Weak Ground

    By Ryan C. Stephan, Christopher Mark

    "Some of the weakest roof in United States coal mines is found in the Illinois Basin. Historically, the Illinois Basin has also suffered from high rates of unplanned roof falls and rock fall injuries.

    Jan 1, 2019

  • SME-ICGCM
    Two Case Studies Of The Performance Of Rib Supports

    By M. K. Larson

    The U.S. Bureau of Mines conducted a study to evaluate support interaction between conventional bolts and the rib at two Western coal mines. The principal goal was to develop guidelines for designing

    Jan 1, 1996

  • CIM
    Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation Processes

    By Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne

    "The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers

    Jan 1, 2003

  • NIOSH
    OFR-115-93 Application Of Cost Engineering To Determine The Optimum Production Rate For Waste Remediation Of Mine Tailings

    By Thomas W. Camm

    The U.S. Bureau of Mines has developed a system for estimating mining and processing costs as a function of process feed rate with the objective of applying this system to abandoned mine tailings and

    Jan 1, 1993

  • CIM
    The Use of Enhanced Gravity Concentration for Precious Metal Recovery

    By Steve McAlister, Colin Sprake

    "Enhanced gravity concentration machines have been applied successfully in the following areas of precious metal recovery flowsheets:1. Primary Grinding Circuits2. Shaking Table Tailings3. Pre-Concent

    Jan 1, 2003