Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Beach sand mining and its separation in Oscom, Orissa (India)By K. N. Panigrahi
India bestowed with 6000km of the coastal belt, contains some of the richest and largest placer deposits with a mixture of heavy minerals like ilmenite, rutile, leucoxene, zircon, monazite, sillimanit
Jan 1, 2005
-
Sodium Sulfate – 5,000 Years of Mining and Processing Salt CakeBy Donald E. Garrett
Sodium sulfate is one of the larger tonnage industrial minerals. A little more than half of this tonnage — 3 Mt/a (3.3 million stpy) of natural product— is recovered from ore deposits. Most of the r
Jan 1, 2002
-
Stress, Geologic, And Support Design System (SGSSM) For Underground Mine SlopesBy J. C. Stankus
Accurate evaluation of stress and geological conditions is critical to ground control design in underground openings. For a slope entry, the problem is more difficult because a slope will transverse
Jan 1, 2011
-
Creep Along Weak Planes In Roof And How It Affects StabilityBy M. K. Larson, R. G. Wade
Researchers at the National Institute for Occupational Safety and Health (NIOSH) are studying the time-dependent response of rock stressed along weakness planes. The objective is to improve mine safe
Jan 1, 2000
-
History And Development Of Aeration In The Cerro Verde MineBy G. Velarde
This paper presents the metallurgical results of column and stockpile leach tests with forced aeration to determine the usefulness of this process in the operational leaching at Sociedad Minera Cerro
Jan 1, 2006
-
Environmental Issues: Still Clouded in UncertaintyBy Michael Stanwood
Project feasibility no longer involves just technical and economic viability-today's feasibility study must include environmental, regulatory, and political considerations as well. While the US n
Jan 1, 1981
-
An Overview Of Imaging Technologies At Newmont Mine SitesBy A. Adu-Acheampong
Photogrammetry and laser scanning has been employed at a number of Newmont mine sites to mitigate risks associated with conventional structural mapping, determining the geometry of voids from old unde
Feb 27, 2013
-
On-Line Rheometer For Mineral SlurriesBy S. K. Kawatra, A. K. Bakshi, T. C. Eisele
An on-line rheometer, suitable for use with slurries, has been developed at Michigan Technological University. This rheometer can be used with both Newtonian and non-Newtonian slurries, and produces c
Jan 1, 1999
-
An Analysis Of Subsidence Movements Associated With An Abandoned Shallow Room-And-Pillar Coal MineBy Yoginder P.
ACKNOWLEDGEMENTS Authors sincerely appreciate the interest, cooperation and technical support of the coal company management and staff in conducting the study. Without their assistance this study
Jan 1, 1986
-
Modeling Metal Ion Removal In Alkylsulfate Ion Flotation Systems (d6f5ac24-85e9-412a-bdb7-096496820a4d)By F. M. Doyle
Metal removal kinetics and metal ion selectivity in ion flotation were studied from a thermodynamic perspective. Surface tension data could be used with the Gibbs adsorption equation to quantitativel
Jan 1, 2000
-
Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station ProjectBy Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister
Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align
Jan 1, 2005
-
Precious Metal Recovery Using Sluice Boxes in Alaska and CanadaBy James A. Madonna
Information gathered while studying geological parameters that govern fine gold deposition in the a1luvial environment can be applied to the technological development and selection of fine gold recove
Jan 1, 1988
-
The Value Proposition: High Annual Return On Investment, And Short-Term Payback Realized In Integrated Mining Processing Automation And Optimization Using IndustrialIT SolutionsBy M. C. Mound, E. Gallestey, C. Colbert
Continuous operating performance and high profit is one of the major concerns in the mining industry. Information systems are expected to reinforce and enable conformance to these requirements. The co
Jan 1, 2004
-
Monitoring Successful NATM in SingaporeBy K. Zeidler, T. Schwind
The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo
Jan 1, 2007
-
General conditions for sustainable coal use in GermanyBy F. -J. Wodopia
Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with
Jan 1, 2011
-
New Opportunities for Energy Development on Indian ReservationsBy Daniel H. Israel
Indian tribes own a substantial portion of the West's minerals. More importantly, Indian reservations contain coal, oil and gas, uranium, and oil shale reserves in unusually large and unencumbere
Jan 6, 1980
-
Guadarrama Tunnel Construction with Double Shield TBMsBy F. Mendaña
The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented
Jan 1, 2007
-
Bagdad Concentrator Process Control UpdateBy Peter Amelunxen, Craig Lockhart
Significant effort was made in 2003 and 2004 to upgrade the existing instrumentation and process control infrastructure at the Phelps Dodge Bagdad copper concentrator. Specifically, • cameras were
Jan 1, 2005
-
Mining ReviewMinerals are fundamental to the U.S. economy, contributing to the real gross domestic product (GDP) at several levels?mining, processing and manufacturing finished products. The estimated growth rate
Jan 1, 2008
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift MethodBy John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985