Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Face Dust Levels At Deep-Cut Underground Coal Mines

    By J. D. Potts

    Dust surveys were conducted at six underground coal mines to determine if deep-cutting practices expose face workers to higher levels of respirable dust. The surveyed mines were able to successfully m

    Jan 1, 2011

  • SME
    Reflections on ilmenite roasting and magnetic separation

    By N. R. Allen, J. D. Steenkamp

    Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of

    Jan 1, 2005

  • SME
    The Development Of Ultra Fine Grinding At KCGM

    In February 2001, Kalgoorlie Consolidated Gold Mines (KCGM) commissioned its first full-scale ultra fine grinding (UFG) plant to supplement existing roaster concentrate treatment capacity. This proces

    Jan 1, 2002

  • SME
    Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer Programming

    By M. Kuchta, A. Newman

    LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use

    Jan 1, 2002

  • SME
    Detection And Control Of Calcium Sulfate Precipitation In The Lead Circuit Of The Hilton Concentrator Of Mount Isa Mines Limited, Australia

    By P. L. M. Wong, N. W. Johnson

    Surface analysis by X-Ray Photoelectron Spectroscopy (XPS) of samples taken from the galena flotation section of the Hilton Concentrator of Mount Isa Mines Limited are presented. Flotation rate and pu

    Jan 1, 1995

  • SME
    A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall Mine

    By Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay

    "Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o

    Jan 1, 2019

  • SME
    Industrial Minerals 2005 – Ball Clay

    By R. L. Virta

    Four companies mined ball clay in four states during 2005. They included H.C. Spinks Clay (owned by Franklin Minerals), Kentucky-Tennessee Clay (owned by Imerys), Old Hickory Clay and Unimin. P

    Jan 1, 2006

  • SME
    Glenbrook Nickel – Can New Caledonian Ore Save the Only US Nickel Producer?

    By Kerry Spickelmier

    The only nickel smelter and the only active nickel mine in the United States is Glenbrook Nickel Co., a joint venture (50% each) of Cominco Resources International Ltd. and Cominco Ltd. In 1989, with

    Jan 1, 1993

  • SME
    Impact of deformable materials and convergence on the transverse load capacity of mine ventilation stoppings

    By T. J. Batchler

    Deformable materials are sometimes added to ventilation stopping constructions to prevent damage caused by convergence in coal mines. However, adding deformable materials can significantly reduce the

    Jan 1, 2009

  • SME
    EPB Tunneling in Canada

    By Laura McNally

    In 2006 McNally International Inc. in a Joint Venture partnership with Aecon Constructors was the successful bidder on two York Region Tunnel Projects: Bathurst Collector/Langstaff Trunk Sewers; and Y

    Jan 1, 2008

  • SME
    Mine Closure At San Martin Mine In Honduras, Central America - Preprint 09-111

    By R. E. Chaves

    San Martin Mine is an open pit, gold heap leach operation located approximately 70 kilometers from the Honduran capital of Tegucigalpa. Mining operations commenced in 2000 and were completed late in

    Jan 1, 2009

  • SME
    Tunnelling on the South East Transit Project

    By T. W. Peglas, J. Doherty, R. A. Day

    The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,

    Jan 1, 2001

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    South Interceptor Tunnel Construction Using a Lovat EPBM

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    This paper presents and describes the South Interceptor Parallel Phase III Contract C93012C, which involved construction of a nominal 2.7 m (9-ft) finished diameter sewer conveyance using both pipe ja

    Jan 1, 2003

  • SME
    Tunnel Excavation Grand Coulee Third Power Plan

    By D. J. Duck

    INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos

    Jan 1, 1997

  • SME
    More Than 30,000 Expected At MinExpo 2008

    From Sept. 22-24, the Las Vegas Convention Center will be home to MinExpo 2008, the world?s largest mining equipment show that comes along once every four years. Sponsored by the National Mining Assoc

    Jan 1, 2008

  • SME
    Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 Tunnel

    By S. H. Jason Choi

    The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne

  • SME
    EPB Tunnel Boring Machine Design For Boulder Conditions

    By Craig Bournes, David Chapman, Michael DiPonio

    Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje

    Jan 1, 2007

  • SME
    Ventilation System Operating Cost Comparison Between A Conventional And An Automated Underground Metal Mine

    By C. K. Kocsis, S. Hardcastle

    Mine ventilation, requires electricity to operate the fans and fossil fuel for heating. Typically, this accounts for approximately 40% of the overall underground energy consumption. This is considerab

    Jan 1, 2002