A Case Study of the Stability of a Non-Typical Bleeder Entry System at a U.S. Longwall MineBy Ihsan Berk Tulu, Mark Van Dyke, Ted Klemetti, Deniz Tuncay
"Longwall abutment loads are influenced by several factors, including depth of cover, pillar sizes, panel dimensions, geological setting, mining height, proximity to gob, intersection type, and size o
Jan 1, 2019
-
Mine Closure At San Martin Mine In Honduras, Central America - Preprint 09-111By R. E. Chaves
San Martin Mine is an open pit, gold heap leach operation located approximately 70 kilometers from the Honduran capital of Tegucigalpa. Mining operations commenced in 2000 and were completed late in
Jan 1, 2009
-
Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel ProjectBy Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal
Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som
Jan 1, 2001
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery SystemThe recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.
Feb 27, 2013
-
EPB Tunneling in CanadaBy Laura McNally
In 2006 McNally International Inc. in a Joint Venture partnership with Aecon Constructors was the successful bidder on two York Region Tunnel Projects: Bathurst Collector/Langstaff Trunk Sewers; and Y
Jan 1, 2008
-
Summersville Raw Water IntakeBy Douglas Banks
Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake
Jan 1, 2005
-
Feasible Tunnel Construction Options For The Systems Conveyance And Operations Program Reach 3 TunnelBy S. H. Jason Choi
The Systems Conveyance and Operations Program (SCOP) is being implemented to convey tertiary-treated effluent to Lake Mead near Las Vegas, Nevada. The Reach 3 Tunnel Project is part of SCOP. The tunne
-
Industrial Minerals 2005 – Ball ClayBy R. L. Virta
Four companies mined ball clay in four states during 2005. They included H.C. Spinks Clay (owned by Franklin Minerals), Kentucky-Tennessee Clay (owned by Imerys), Old Hickory Clay and Unimin. P
Jan 1, 2006
-
More Than 30,000 Expected At MinExpo 2008From Sept. 22-24, the Las Vegas Convention Center will be home to MinExpo 2008, the world?s largest mining equipment show that comes along once every four years. Sponsored by the National Mining Assoc
Jan 1, 2008
-
EPB Tunnel Boring Machine Design For Boulder ConditionsBy Craig Bournes, David Chapman, Michael DiPonio
Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje
Jan 1, 2007
-
Tunnel Excavation Grand Coulee Third Power PlanBy D. J. Duck
INTRODUCTION Construction of the 3,600,000 kilowatt Third Powerplant at Grand Coulee Dam started in late summer 1967 approximately one year after authorization by Congress. The project was made pos
Jan 1, 1997
-
Ventilation System Operating Cost Comparison Between A Conventional And An Automated Underground Metal MineBy C. K. Kocsis, S. Hardcastle
Mine ventilation, requires electricity to operate the fans and fossil fuel for heating. Typically, this accounts for approximately 40% of the overall underground energy consumption. This is considerab
Jan 1, 2002
-
Class I Areas Impacts Analyses For A Proposed Expansion Of A Taconite Processing Facility In Northeast MinnesotaBy D. M. Wagner, G. Biggs, M. Osmundson, C. J. Twaroski
Potential air emission impacts to federal Class I areas from distant sources are receiving increasing scrutiny by federal land managers (FLMs). This paper provides summary results of the impact analy
Jan 1, 2001
-
Use of Simulation to Validate Load And Haul Requirements at Cortez Gold MinesBy W. L. Jacobsen, T. L. Dyer
Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o
Jan 1, 2006
-
A Review Of The Analysis Of Amphibole FibersBy K. A. Allison, D. R. Van Orden, R. J. Lee
Continuing analysis of environmental samples for asbestos content has resulted in the misidentification of non-asbestos amphibole particles as asbestos fibers. These errors have received wide publici
Jan 1, 2005
-
WROC ? An Improved Waste Rock Oxidation CodeBy S. Sunkavalli
Acid rock drainage (ARD) is produced when sulfides are exposed to oxygen and water. Oxidation reactions typically result in a depression of pH and leaching of solutes and metals. Many oxidation models
Feb 27, 2013
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case HistoryBy Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
Mineral Resources and Land Use Planning Conflicts in NorwayBy K. Nielsen
The paper presents a brief overview of the mineral industry in Norway, followed by a description of the mineral policy and relevant legislation including the roles of the Norwegian Directorate of Mini
Jan 1, 2005
-
Queens Bored Tunnels, East Side Access, New YorkBy David Smith, Bernie Martin
The Queens Bored Tunnels consist of 11,000 feet of 19'-6" inside diameter tunnels mined through rock, mixed face and dense glacial till, constructed with bolted gasketed one pass reinforced concr
Jan 1, 2005