Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Composite Segmental Lining to Resist a Fault Rupture - RETC2021

    By Girish Roy, Robert Goodfellow, Angel Del Amo, Bingzhi Yang

    Designing and constructing tunnels in seismic prone areas present unique challenges to both designers and contractors. The Westside Purple Line Extension Project– Section 3 in Los Angeles requires cro

    Jun 13, 2021

  • SME
    Influence of hydrodynamics onpreflotation process inflotation machine Mining, Metallurgy and Exploration

    By W. Pawlos, A. Bakalarz, M. Duchnowska

    This paper presents the results of an investigation into the influence of hydrodynamics on a preflotation process for the copper sulfide ore from the Fore-Sudetic Monocline deposits in Poland in a flo

  • SME
    Use Of Geophysical Methods To Investigate Underground Damaged Rock Zones

    By C. K. Skokan

    Various geophysical tools have been tested over the last eight years to evaluate their usefulness in defining damaged rock zones in an underground facility at the WIPP site in New Mexico. These tools

    Jan 1, 1993

  • SME
    Simulation Of The Effects Of Surface Mining On Groundwater In The Powder River Basin (d3b227e5-5484-4b04-b9fa-a635ea56fe52)

    By Gary E. McIntosh

    This paper will discuss a U.S. Bureau of Mines project designed to assess and predict the impacts which surface coal mining will have on the regional shallow groundwater systems in the Powder River Ba

    Jan 1, 1978

  • SME
    Bridging the Gap—From Borehole Spacing to DSC Claim Resolution - NAT2022

    By Kapila Pathirage, Michael S. Schultz, Gregory Sanders, Ulf G. Gwildis

    Adequate understanding of the subsurface conditions along the alignment of a planned tunnel is key for managing project risk. For achieving this understanding, geotechnical borings are conducted durin

    Dec 1, 2022

  • SME
    Coal handleability – rapid on-site assessments

    By B. P. Atkin, D. W. Brown

    A handleability monitor was designed to provide a simple, rapid, on-site assessment of the whole or part consignment of a coal blend in its "as-received" condition. The monitor was evaluated at a numb

    Jan 1, 2002

  • SME
    Use of probability distributions to define baseline groundwater quality at a uranium mill site

    By O. A. Paulson, D. D. Runnells, D. P. Dupon, K. J. Bruxvoort

    Background groundwater quality is often used to drive remediation programs at sites with waters that have been affected by mining activities. In the past, these levels were sometimes chosen without ri

    Jan 1, 2000

  • SME
    San Manuel Oxide Pit Blasting

    By S. F. Walsh

    The San Manuel Oxide Pit is located within the subsidence boundaries of Magma Copper Company's block caving operation. Ground conditions offer a constant blasting challenge and vary from hard, co

    Jan 1, 1988

  • SME
    An Explanation Of Flocculation Using Lewis Acid-Base Theory

    By P. M. Brown

    The Bureau of Mines, U. S. Department of the Interior, has developed a method of dewatering clay slurries based on flocculation by high-molecular-weight polymers and water removal from the formed floc

    Jan 1, 1988

  • SME
    Problems, Solutions, And Practical Aspects Of Sampling Technique Relative To Development Of The Relief Canyon Gold Project, Pershing County, Nevada (767d9d7b-0cdf-4581-97da-96df367cf70c)

    By R. A. Metz, Michael M. Easdon, Michael J. Fiannaca

    Disseminated epithermal gold metallization occurs within a breccia unit interpreted to be a submarine debris flow. Gold is associated with oxidized pyrite, fluorite, and jasperoidal silica. A minimum

    Jan 1, 1992

  • SME
    New Development In The "In Situ" Testing Of Rocks

    By K. F. Unrug

    Extrapolation of the rock properties obtained from the cores exploration holes to the surrounding areas often causes problems because of frequent sudden changes in the geologic composition of strata.

    Jan 1, 1999

  • SME
    Out with the Old, In with the New: How We’ve Come Full Circle from the Burning River - NAT2022

    By Ben DiFiore, Richard DePew, Nate Long, Adrian Naranjo-Castillo, Chris Petta, Robert Auber

    The Walworth Run stream was brick-culverted in the 1800s, converting it to a 16-ft diameter sewer. This Cuyahoga River tributary contributed to the infamous burning river that became the catalyst for

    Dec 1, 2022

  • SME
    Addressing Mine-Scarred Lands Using The Brownfields Law

    By K. M. Atencio, T. Pike, S. Forrest

    We will introduce the Small Business Liability Relief and Brownfields Revitalization Act, which is an amendment to CERCLA and the types of sites it includes and excludes, especially as related to mine

    Jan 1, 2004

  • SME
    Seepage Flux Conceptualized From Secondary Calcite In Lithophysal Cavities In Thetopopah Spring Tuff, Yucca Mountain, Nevada

    By J. F. Whelan, B. D. Marshall, Z. E. Peterman, J. B. Paces, L. A. Neymark

    Observations of calcite and opal in cavities in the unsaturated zone at Yucca Mountain indicate that: 1) seeps are not regularly spaced in underground workings and not all fractures sustain flow,

    Jan 1, 2000

  • SME
    Prevention and Remediation of Acid Drainage From Mine Waste Rock in Australia

    By Chris Joyce, Peter Ryan

    Investigation of the occurrence and significance of acid drainage from mine sites in Australia has received a degree of attention in recent years. For contemporary and future projects, particularly th

    Jan 1, 1991

  • SME
    Flowing And Raveling Clays

    By Roy J. Leonard

    Two small diameter sewer tunnel projects being hand dug under major highways in the Greater Kansas City area encountered problems which were unforeseen from the geotechnical engineering information su

    Jan 1, 1987

  • SME
    A Contracting Strategy for Managing Risk on Subsurface Projects Delivered Using Design-Build

    By David Corkum, David Hatem

    Subsurface construction projects are risky ventures and the decision to deliver a project using the Design-Build model does not eliminate those risks. Differing site conditions, inadequate design, and

    Jan 1, 2003

  • SME
    Assets That Can Become Liabilities

    By M. R. Leonard

    It is estimated that between 5 and 15 pounds of solid waste are generated monthly by each individual. Finding a final resting spot for such waste is an important matter. In the "good ole days," dumps

    Jan 1, 1974

  • SME
    The International Network for Acid Prevention - A Progress Report

    By Henry Brehaut

    The International Network for Acid Prevention (INAP) was formed in 1998 by 17 international mining companies to promote significant improvements in the management of sulphidic mine materials and the r

    Jan 1, 2000

  • SME
    A GIS-Based Study On The Reclamation Of Mined-Out Open Pits

    By M. Kyzeridi

    The paper presents a study on the reclamation of two mined-out bauxite open pits in the area of Kefali, Itea, Greece. The mining area has been reclaimed partially in the past, but its proximity to t

    Jan 1, 2002