Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Binding Iron Ore Pellets With Fly-Ash – Preprint 97-105

    By D. D. Banerjee, S. K. Kawatra, T. C. Eisele

    A high calcium fluid-bed combustor ash has been shown to be an effective binder at dosages of 1 to 2% of the magnetite concentrate weight. Magnetite pellets 1.3 cm (1/2 inch) in diameter were produced

    Feb 24, 1997

  • SME
    Discover mining?s history at Arizona Mining and Mineral Museum

    While SME is hosting its Annual Meeting at the Phoenix Convention Center, Feb. 28 to March 3, one of the finest collections of mining history will be on display just 15 blocks away at the Arizona Mini

    Jan 1, 2010

  • SME
    EPA’s EPCRA Assistance Visits: Getting Prepared (EPCRA Actually Consists Of Sections Other Than 313?)

    By K. Ward

    The Environmental Protection Agency (EPA) is beginning to provide compliance assistance visits to various industries, including mining, for Emergency Planning and Community Right-to-Know Act (EPCRA) c

    Jan 1, 2001

  • SME
    Steel Fiber Microsilica Shotcrete With Remote Controlled Equipment

    By Galyn Rippentropp, Finn Erik Overlie

    INTRODUCTION The wet shotcreting system utilizing steelfiber microsilica shotcrete with remote controlled equipment (The Robocon System) was developed in Norway 7-8 years ago. Norway was the natura

    Jan 1, 1987

  • SME
    Design Risk Mitigations for Contract CQ028 of the East Side Access Project

    By Samer Sadek, David I. Smith, Wai-shing Lee, Jeffrey L. Rice, Avelino Alonso

    INTRODUCTION East Side Access (ESA) Contract CQ028 is located in the New York City Borough of Queens. The contract involves construction of a 230-meter (760-foot) long open-cut excavation with a p

    Jan 1, 2007

  • SME
    Creation Of An Underground Mine Development Sequencing Optimizer

    By M. J. Blattman

    Upon completion of an underground mine design, the planning engineer is faced with a surprisingly complex problem, “What development and mining sequence should be implemented so as to maximize the ret

    Jan 1, 2003

  • SME
    Determining The Amplitude Of Certainty For Empirical Rock Failure Criteria

    By K. Oraee

    The empirical rock failure criteria play an important role in predicting the mechanical behavior of rocks, since affecting parameters on the behavioral properties of rocks are complex and numerous. Us

    Jan 1, 2012

  • SME
    High Altitude Passive Water Treatment System Design And Construction For Leach Pad Effluent

    By K. Whiting, R. Huffsmith, R. Olsen, D. Adams

    Long-term closure alternative selection for heap leach pad effluent is a daunting task. Passive water treatment, if designed with enough long-term capacity, can minimize long term O&M while meeting w

    Jan 1, 2002

  • SME
    Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)

    By Christopher J. Bise

    INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by

    Jan 1, 1986

  • SME
    Mine Power Systems

    By Christopher J. Bise

    INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper

    Jan 1, 1986

  • SME
    Factors Influencing Dust Suppressant Effectiveness

    By C. R. Copeland

    Water sprays are a common method used to reduce particulate matter (PM) emissions. Various factors such as wettability, surface area coverage, fine particle engulfment rates, interparticle adhesion fo

    Jan 1, 2008

  • SME
    Vernal Mine: 19 Years Without a Lost-Time Accident

    By John B. Spencer

    Earlier this year, Simplot Phosphates achieved a safety milestone at its Vernal, UT phosphate operations. In March, the entire operation reached achieved seven years without a lost time accident. An

    Jan 1, 2004

  • SME
    How Much Testing Should I Do? Are The Samples Really Representative?

    By R. W. Smith, D. L. Taylor, K. A. Altman

    Recent research has shown that traditional sensitivity, what if and best case/worst case analysis of metallurgical data has the potential to over estimate the value of mining projects. Use of simulat

    Jan 1, 2000

  • SME
    Key Components For An Effective Filtration And Pressurization System To Reduce Respirable Dust In Enclosed Cabs For The Mining Industry

    By A. B. Cecala

    Enclosed cabs have been used for many years to isolate workers on mobile equipment in the mining industry for health and safety reasons. These enclosed cabs create a microenvironment for workers where

    Feb 27, 2013

  • SME
    Controlled And Monitored Rock Excavations In Urban Areas

    By D. S. Saxena, Jack K. Tuttle

    Lack of understanding of useful applications of explosives on construction work stem primarily from the fact that explosion is commonly associated with destruction. On rock excavation and other constr

    Jan 1, 1997

  • SME
    A study on the optimum arrangement of buoyancy module for stability of marine flexible riser using genetic algorithm & multi-body dynamic simulation

    By Tae-kyeong Yeu, Cheon-Hong Min, Hyung-woo Kim, Sup Hong, Minuk Lee, Chang-Ho Lee

    This paper concerns the optimum arrangement of the buoyancy module, which is used for stable dynamic motion and structure stability of the marine flexible riser. The main method of this study is simul

    Sep 1, 2014

  • SME
    Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and Tunnels

    By Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister

    The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe

    Jan 1, 2005

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • SME
    Determining Quantitative Mineralogy Using A Modified Modan Approach On The Questa Rock Pile Materials, New Mexico - Preprint 09-020

    By V. T. McLemore

    Petrographic analysis of rocks is traditionally performed with optical microscopy using thin sections and point counting. However, this does not provide accurate mineral proportions for sedimentary, v

    Jan 1, 2009

  • SME
    Considerations For Blending Low-Rank and High-Rank Coals – Preprint 97-15

    By O. Ogunsola, M. Downing

    This paper gives a brief overview of impacts of coal blending on coal-fired power plants performance and discuses the preliminary results of an on-going study aimed at evaluating the effect of coal pr

    Feb 24, 1997