Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Truck/Shovel Dispatching Rules Assessment Using SimulationBy Y. Lizotte
The purpose of this paper is to describe a stochastic simulation program used to assess several dispatching rules applicable to small scale computerized systems for optimizing truck/shovel productivit
Jan 1, 1986
-
Development of a Kinetic Model of the Bacterial Dissolution of Copper Concentrate Mining, Metallurgy and Exploration (SPRINGER)By Mohammad Ranjbar Hamghavandi, Mohammad Ranjbar, Zahra Manafi, Mohammad Hassan Fazaelipoor, Mahin Schaffie
The present study introduces a new approach to understand the copper dissolution rate and to find an adapted mathematical statement for particle shrinkage rate in a batch bioleaching system. Four size
-
Applications of Risk Assessment Techniques in RCRA Clean Closure of Surface Impoundments With Trace Metal ContaminationBy R. Kadeg, S. Pavlou
A methodology for developing and utilizing risk-based action levels for soils in site closures is discussed. The methodology is based on standard exposure pathway models which are consistent with curr
Jan 1, 1992
-
Experimental Study on the Roof Behaviors in Pitching Oblique Longwall Mining Area of Steeply Dipping SeamThe deformation, failure, and filling characteristics of a caving roof in the initial and normal mining stages of a pitching oblique longwall mining area are analyzed using large-scale threedimensiona
Jan 7, 2020
-
A Holistic Vision for a Systems Approach to Resource Governance - SME Annual Meeting 2024By H Arvidson, Rondinelli Sousa, Nic Pollock, Cesar Carrasco, Boz Elloy
Global public mineral reporting codes have driven strong governance of public disclosures of minerals information. Recently, we have seen an increase in disclosure of information related to Environmen
Feb 1, 2024
-
Discussion - Determination Of The Optimum Lifetime Of A Mining Project Using Discounted Cash Flow And Option Pricing Techniques - Cavender, B.By G. Le Bel
Discussion by G. Le Bel The paper proposes three methods to determine optimum lifetime of a mining project 1. The conclusion is that the three methods arrive at the same optimum production rate (by
Jan 1, 1994
-
Interactions between oleate collector and alizarin modifier in dolomite/francolite flotation systemBy L. Xiao, P. Somasundaran
Using potassium oleate as a collector and alizarin red S as a modifying agent, selective depression of dolomite from francolite was achieved in an alkaline medium (pH > 9.0). Adsorption of alizarin re
Jan 1, 1990
-
Recent Developments In Pressure Oxidation Treatment For Cannon Mine ConcentratesBy D. M. Larsen, N. D. King
Since start-up in 1985, the Cannon Mine has produced and shipped a 170-g/ton (5 oz/ton) gold flotation concentrate to various smelters for gold and silver recovery. Several processes have been investi
Jan 1, 1994
-
Management of Acid Drainage at Mining Facilities Using Dynamic Systems Modeling (DSM)By Jerry W. Danni, R. Craig Ford, Kermit C. Benke, Jim B. Finley, Donald D. Runnells
Steady-state water balance models have historically been used in the management of acid drainage at mine sites. Such systems could be more realistically described by non-steady-state conditions. In ad
Jan 1, 2000
-
Strain Wave Measurements and Fragmentation: The Effect of Delay Between Explosive ChargesBy Stuart Brashear, J. W. Reil
The manuscript of this paper was not available for publication when the Proceedings went to press. Should the authors elect, they may distribute copies at the time of the Symposium.
Jan 1, 1986
-
Drainage of Tailings Impoundments Application of Principles and ExperienceBy John D. Nelson, Clint L. Strachan
Drainage of tailings impoundments is a key issue for impoundment stability, water control, seepage control, and reclamation. Drainage control is an established operating practice where climate and sit
Jan 1, 1988
-
Innovative TBM Launching in Urban Areas - RETC2023By Fabrizio Fara
The Ship Canal Water Quality Project (SCWQP) includes a 2.7-mile long, 18'-10" internal diameter tunnel which is located inWest Seattle. Tunneling in urban areas and soft ground conditions (Till and T
Jun 13, 2023
-
Urban Costs: Owner's ViewpointBy James F. Fraser
Construction of a major linear project in any environment is difficult, at best. Construction of a major linear project which includes major subway elements, both cut and cover and tunneling, in the c
Jan 1, 1979
-
San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022By Jeremy Stone, Yiming Sun, John Stolz
The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc
Dec 1, 2022
-
Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent CriteriaBy P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz
Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea
Jan 1, 1989
-
Engineering of Cooks Lane Tunnel: An overview of challengesBy V. Nasri, S. Rashidi
The Baltimore Red Line Project is a proposed 22.7-km (14.1-mile) long east-west light rail transit (LRT) line envisioned to connect the areas of Woodlawn, Edmondson Village, West Baltimore, downtown B
Jan 1, 2014
-
6. Computer-Controlled Truck Dispatching in Open-Pit MinesBy Robert F. Hauck
This chapter discusses a new technology for computer control in open-pit mine operations: the real time automatic dispatching of manually driven trucks to shovels. The monitoring of truck activity is
Jan 1, 1979
-
Geochemical Characterization and Evaluation, Mansfield Canyon, Wrightson Mining District, Santa Rita Mountains, ArizonaBy Eli Curiel, Ingar F. Walder, Patrizia P. Schuster, Walt Keyes
Mansfield Canyon, of the Wrightson Mining District, Santa Cruz County, Coronado National Forest, Arizona, was actively mined in the late 1800's and early 19001s, with minor activity until 1953. T
Jan 1, 2000
-
SME Annual Meeting And Exhibit ShowguideJan 1, 1998
-
Analyzing Solutions Of The Openpit Block Sequencing Problem Obtained Via Lagrangian TechniquesBy W. B. Lambert
A common decision in openpit mining is to determine the extraction sequence of notional three-dimensional production blocks so as to maximize the net present value of the extracted orebody, while adhe
Jan 1, 2013