Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Evaluation & Selection of Novel Surveying Systems for use in Surface Coal MiningBy T. Stack, C. Roos, M. Drake, P. Conrad
"This paper presents the evaluation Montana Tech completed for the Western Energy Company Rosebud Mine relating to the benefits of survey data collected using novel technologies over traditional metho
Jan 1, 2017
-
In-Situ Electromagnetic Probing Of Coal SeamsBy Sidney A. Suhler
The persistent requirement for methods and equipment capable of detecting hazardous anomalies in advance of underground mining has led to the development by the U.S. Bureau of Mines of a directional r
Jan 1, 1983
-
Ground Support Systems for Heavy, Squeezing Ground at Burgin MineBy Donald O. Rausch, William E. Hawkes, Odin Jr. Strandberg
INTRODUCTION Kennecott Copper Corp.'s Tintic Div. Burgin mine is a 725 t/d (800 stpd) lead-zinc producer, located in the east Tintic mining district, 5.6 km (3.5 miles) east of Eureka, and 130
Jan 1, 1982
-
Marketing Of US CoalBy A. M. Whiting
Competition for coal producers and their primary customers has constantly increased during recent years. The effects of the Clean Air Act Amendments of 1990 on the electric utility industry, coupled w
Jan 1, 1994
-
State-Of-The-Art Of High Capacity Shiploading Systems - The Rationale For High CapacityBy Paul Soros
There has been a steady increase in shiploading capacities in the last 20 years. One of the reasons has been the general increase in ship sizes, with the largest vessels currently around 280,000 DWT i
Jan 1, 1982
-
Linear Integer Programming Model Applied To Scheduling Of Iron Ore Production At The Kiruna Mine, Kiruna, SwedenBy M. Kuchta
A linear integer programming (MIP) model to solve the long-and short-term production-scheduling problem for sublevel caving operations is presented. The MIP model is designed as a multi-time-period pr
Jan 1, 2003
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
Critical Minerals and Acid Mine Drainage in Black Hawk Mine Waste, Grant County, New Mexico - SME Annual Meeting 2024By Zohreh Kazemi Motlagh, Virginia T. McLemore
There are more than 15,000 abandoned mine features in New Mexico. A considerable number of these mines have not been cataloged or assessed for prioritized reclamation efforts. These mine wastes can be
Feb 1, 2024
-
Stratmin Graphite Inc. A Unique Graphite Mine StoryBy D. Goffaux
In less than two years, Stratmin has discovered, explored, developed, financed and put into production by open pit, a large graphite mine. The deposit, hinted by airborne electromagnetic survey, was d
Jan 1, 1992
-
Natural Versus Mining-Related Water Quality Degradation to Tributaries Draining Mount Moly, Silverton, ColoradoBy Winfield G. Wright, Philip L. Verplanck, Philip L. Hageman, Douglas B. Yager, Dana J. Bove, M. Alisa Mast
Geological, hydrological, and geochemical information synthesized in a Geographical Information System (GIS) for water and rock surrounding South and Middle Forks of Mineral Creek, northwest of Silver
Jan 1, 2000
-
The Lead-Zinc AnomalyBy David B. Brooks
I gratefully acknowledge the help of a number of American and Canadian geologists, in both federal surveys and in private firms, who took the time to discuss this problem with me. Hans Landsberg and B
Jan 1, 1967
-
New Process For Treatment Of Waste Waters Containing Cyanide And Related SpeciesBy E. A. Devuyst
Metallurgical processes involving the use of cyanide such as gold cyanidation, metal plating and flotation, generate effluents containing cyanide and cyanide in complex combinations with heavy metals
Jan 1, 1982
-
Laboratory Testing for Sulfide Flotation Process Development"A carefully planned laboratory test program is the foundation for the successful development of a sulfide flotation process. In this paper, the development of a copper-molybdenum flotation process is
Jan 1, 2016
-
In-Situ Leaching Simulation Studies Of Uranium OresBy P. S. Sundar
A laboratory method for the simulation of in-situ leaching of uranium was developed under contract to the Interior Department's Bureau of Mines. Simulation tests using sulfuric acid, ammonium bic
Jan 1, 1978
-
An Overview Of Coalbed Methane Recovery Activities From A Deeply Buried Coal SeamBy Jeff Schwoebel, Arcy, D&apos Horner
The Deep Coal Seam Project is a multi- year, large-scale research and development effort between the Gas Research Institute (GRI) and Resource Enterprises, Inc. (REI). The project is being conducted a
Jan 1, 1987
-
Life-Cycle Costing - An Economic Approach to Evaluate the Operational Equipment of TunnelsBy Hans Adden, Anne Lehan, Markus Thewes
"1. INTRODUCTION AND MOTIVATION Traditionally design processes are focussed at creating new tunnels for lowest building cost. But the trend towards sustainable constructions in tunnelling has greatly
Jan 1, 2016
-
Gold-Silver Deposits Of The Northern Primorye Territory, Russian Far EastBy V. N. Kolesnikov
The gold-silver deposits of the northern Primorye region are located in the eastern part of the East Sikhote-Alin volcanic belt, where the belt overlaps the Kema island-arc terrain of the Aptian-Albia
Jan 1, 1998
-
Recovery Of Additional Tungsten From Climax Byproduct-Plant Tailing (dc443b03-d3e8-42c5-a119-b122b5f05c1e)By D. Malhotra
Climax byproduct-plant tailing assayed 0.019 percent WO3. Pilot-plant and laboratory tests were performed to investigate the possibility of recovering additional tungsten values from the byproduct-pla
Jan 1, 1985
-
Overburden Removal Cost Management Utilizing Work Order SystemsBy J. G. Pippenger
The Coteau Properties Company's Freedom Mine is a surface lignite mining operation utilizing large draglines, trucks and shovels, tractor-scrapers, and bulldozers to uncover a single coal seam. I
Jan 1, 1994
-
Site planning process : Application to land use potential evaluation for mined land (Technical Paper)By R. J. Sweigard, R. V. Ramani
Productive and beneficial use of reclaimed surface-mined land is a concern of industry, government, and the general public. A process has been developed that will aid mine planners and public planners
Jan 1, 1987