Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    The Influence of a Continuous Mining Machine and Roof/Rib Mesh on Magnetic Proximity Detection Systems Mining, Metallurgy and Exploration (f3f9caae-7ddd-4734-aba6-75a1893d7f35)

    By Jacob Carr, Christopher C. Jobes, Chenming Zhou, LaTasha R. Swanson, Jennica Bellanca, Jingcheng Li

    Magnetic proximity detection systems (PDSs) are used with continuous mining machines (CMMs) to protect miners from striking and pinning accidents. Generators are used in a PDS to create magnetic field

  • SME
    Direct Pressure Alkaline Leaching of Scheelite Ores and Concentrates Mining, Metallurgy and Exploration (Springer)

    By António Fiúza, Anthony Danko, Patrícia Leitão, Aurora Futuro, Cristina Vila, Lurdes Dinis

    The average global recovery rates for processing scheelite ores by physical methods are normally in the range 50 to 70%, and it is problematic to attain a minimum grade of 60% WO3 in the concentrates

  • SME
    Comparing EIA And ESHIA For Evaluating Mining Projects

    By R. E. Mitchell

    Environmental Impact Assessment (EIA) is the accepted method for evaluating proposed mining and other industrial projects to obtain regulatory approval and to help companies plan for responsible devel

    Jan 1, 2012

  • SME
    Numerical Simulation of Laboratory Strength Tests Using a Stochastic Approach Mining, Metallurgy and Exploration (64afd044-d268-43ce-8f2e-500a0684ddfe)

    By Yuting Xue, Danqing Gao, Brijes Mishra

    Heterogeneity and discontinuity significantly affect rock strength. For accurate stability prediction, intact rock behavior is imperatively included in rock mass behavior. However, past research large

  • SME
    Numerical Simulation of Laboratory Strength Tests Using a Stochastic Approach Mining, Metallurgy and Exploration

    By Yuting Xue, Danqing Gao, Brijes Mishra

    Heterogeneity and discontinuity significantly affect rock strength. For accurate stability prediction, intact rock behavior is imperatively included in rock mass behavior. However, past research large

  • SME
    Management By Loss In Mining - Introduction - Preprint 09-017

    By M. J. Ramos

    Without an exclusive definition of administration in business, we could propose to define it as performance by management to adopt or implement established business formulas. Administration could als

    Jan 1, 2009

  • SME
    Gotthard-Base Tunnel, Section Faido Previous Experience With The Use Of The TBM

    By Martin Herrenknecht

    After the successful breakthrough at the end of 2006 of both TBMs into the multifunctional site Faido (MFS), in the middle of 2007 the two tunnel boring machines resumed the 12 km long section between

  • SME
    Measuring Carbon Emissions From Base Metal Mine Sites

    By M. J. Farrell

    The threat of global warming and its prominent position in public discussion and political debate requires all industry to take stock of its contribution to rising atmospheric concentration of greenho

    Jan 1, 2009

  • SME
    Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close Proximity

    By Kentaro Kuraji

    INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi

  • SME
    Large Diameter Tunnel Boring Machine Development

    By Martin Herrenknecht

    The world?s growing population and rapidly proceeding urbanization are boosting an enormous demand for new and high-capacity infrastructures to secure the mobility of goods and people. Densely popula

    Jan 1, 2010

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Equipment adds efficiency, safety to cross passage work

    From a vast army of workers to gargantuan machines to immense volumes of material being moved, almost everything about the Port of Miami Tunnel (POMT) project points to tunneling on a massive scale. A

    Sep 1, 2013

  • SME
    Hydrogeologic Characterization and Mining Impact Analysis of a Low-Yield, Fractured Granite Mining, Metallurgy and Exploration (86a3e080-80de-4150-963a-4695a76dda43)

    By Michael Day, Paul Kos, Scott Brinton

    A hydrogeologic characterization and impact analysis was performed for a proposed quarry at the Hitch Rack Ranch located in the Little Turkey Creek watershed southwest of Colorado Springs, Colorado. C

  • SME
    Recent Developments in Site Investigation and Testing for Hard Rock TBM Projects

    By Levent Ozdemir, Bjorn Nilsen

    For several recent TBM tunnel projects, unexpected ground conditions have been encountered, causing extra cost, considerable delay, and in some cases major claims. Undoubtedly, insufficient and/or irr

    Jan 1, 1999

  • SME
    The Outlook For Mica

    By S. A. Montague

    In spite of the many new insulating materials, both synthetic and manufactured, that have been put on the market since the end of World War II, and notwithstanding the many millions of dollars applied

    Jan 1, 1962

  • SME
    Transfer Of A Project Risk Register From Design Into Construction: Lessons Learned From The WSSC BI-County Water Tunnel Project

    By R. J. F. Goodfellow

    Many underground projects now include preparation of a Risk Register through planning and design as a tool for project and risk management. There is still significant discussion within the industry as

  • SME
    Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)

    By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang

    Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak

  • SME
    Looking For Value In Wastelands: Developing Renewable Energy On Degraded And Polluted Lands

    By R. Rushforth

    The surge of activity in the solar energy market, spurred by government incentives, has created new and more efficient solar technologies, but issues surrounding land- and water-use have backlogged th

    Jan 1, 2011

  • SME
    Statistical Significance Of Some Operating Parameters On Dolomite Removal From Phosphate Using Amphoteric Collector

    By A. M. Elmahdy

    An amphoteric collector was tested for dolomite removal from phosphate ore. The effects of some operating parameters and their significance on the flotation of dolomite were studied using statisticall

    Jan 1, 2007