Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel
By Russel Delmar
Construction of Ontario Power Generation?s 12.8-m diameter, 10.4-km long water diversion tunnel in Niagara Falls, Ontario, is underway. The tunnel is being excavated by means of a 14.44-m diameter ope
Jan 1, 2008
-
Observations on the Prospectors and Developers Association Conference
By Bruce Geller
The 2004 Prospectors and Developers Association of Canada (PDAC) conference contained an air of optimism and excitement that has not been seen since 1997. Many segments of the mining industry are ali
Jan 1, 2004
-
Long-Term Stability Of Overburden Above Room And Pillar Mines
By Gennaro Gerald Marino
Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for
Jan 1, 1986
-
Pillar Design and Coal Burst Experience in Utah Book Cliffs Longwall Operations
Longwall mining has existed in Utah for more than half a century. Much of this mining occurred at depths of cover that significantly exceed those encountered by most other U.S. longwall operations. De
Jan 7, 2020
-
A Thermodynamic and Environmental Assessment of Lanthanide Chloride Production from Bastnaesite
By A. Nivala, S. Ulgiati, M. Canino
Mining and processing of bastnaesite ore, (Ln)CO3F, for lanthanides extraction is investigated in this paper. This series of elements proved to be applicable for a wide range of high-tech uses. In spi
Jan 1, 2005
-
Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation
By J. Kang
To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium
Jan 1, 2008
-
Maintaining Ring Gears in Ball Mills
By David Kress
Mill crushing drive systems are essential to cement producers. With the increased emphasis on operating efficiency, it is vital that these systems be dependable and reliable. No one needs the costs
Jan 1, 2000
-
Towards The Complete Double Parameterization Of Recovered Reserves In Open Pit Mining - Introduction
By Kadri Dagdelen
Design of the ultimate pit limit to direct long range mine planning has been a celebrated problem in the mining industry, and in mining academia, since 1965. Although many papers have been presented o
Jan 1, 1982
-
Investigations On Recovery Of Hematite From Two Different Banded Iron Ores By Flotation
By B. Das
Hematite floatability from two low grade banded iron ores of India, namely banded hematite quartzite (BHQ) and banded hematite jasper (BHJ) using fatty acids and amine as the collectors is investigate
Feb 27, 2013
-
Planning And Preparation For Tunneling At Brightwater West
By Mina M. Shinouda
Brightwater West (BT4) represents the state of the art in utility tunneling, namely a long relatively small diameter, soft ground tunnel, with no intermediate shafts, under significant groundwater pre
-
Tunnelling Under The Harlem River
By Jacek B. Stypulkowski
This paper discusses the challenges faced by the design team of the under-river crossings of electric transmission feeders in New York City, a densely populated urban area. The under-river crossing of
-
Operational Practices To Reduce Copper And Other Metals Loading Onto Activated Carbon In Heap Leach CIC Circuits - Introduction - Preprint 09-109
By B. Cousins
Copper, nickel, zinc and other ?penalty? metals are found with gold together in nature, and have a similar chemical affinity for cyanide used in leaching operations4. As a result, solutions that come
Jan 1, 2009
-
Boart Longyear Coring Bits Pass Field Tests
Using mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A
Jan 1, 2009
-
Effectively Utilize Voip And Web Compression Technology With Satellite And Other Low Bandwidth Connections To Improve Mine Efficiency And Safety And Reduce Communications Costs
By M. Haase
[ ] How important is a robust communications system for your mine site in order to meet operational and safety requirements? Do you currently have VSAT in place and need a low cost, high quality mu
Jan 1, 2012
-
Practical Challenges For The Mine: Precious Metals Accounting And Reconciliation
By Will Jansen
When Enron rocked the United States with its Titanic-sized financial accounting scandal, miners and metallurgists were probably too busy on the mine sites in remote locations to wonder about its rippl
Jan 1, 2009
-
Seismic Design Evaluation of the Bay Tunnel
By Yiming Sun
The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the
Jan 1, 2008
-
Subsurface Disposal Of Mine Water ? Introduction
By Robert Stefanko
The concept of disposing of liquid industrial wastes by deep-well injection is not a new one. Brines associated with crude oil long have been disposed of in this manner, with the additional benefit of
Jan 1, 1969
-
Regulatory Perspective: The Progression of Canadian Mining Disclosure Standards
By Deborah McCombe
-Canadian Regulators -Qualified Person -Professional Association -Resources & Reserves -Foreign Codes -Disclosure of Historical Resources -Issues in Application of Resources & Reserves -Industr
Jan 1, 2003
-
Old insurance policies : An often unrecognized source of pollution liability insurance
By Walter R. Curtner
Many, if not most, of today's pollution liability claims are related to events ("occurrences") that happened in the past. This fact creates an opportunity to obtain a large amount of insurance co
Jan 10, 1987
-
Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) Stresses
By John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw
An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac
Jan 1, 1979