MINEXCHANGE 2026: Resilient energy to take center stage - ME Feature ArticleBy William Gleason
The mining industry is under immense pressure to not only meet increasing demand for minerals, but to do so in an environmentally safe and sustainable manner. Growth in electric vehicles, battery stor
Jan 1, 2026
-
Optimizing An Engineered Slope Conveyor System; An OEM/Operator CollaborationBy Todd Burchett
Mining engineers spend countless hours and resources when designing a new underground coal mine. Their primary objective is to design the safest and most efficient operating mine with regards to coal
Jan 1, 2013
-
Mining Foundation Of The Southwest To Honor Rescuers Of 33 Miners In ChileThe 29th annual American Mining Hall of Fame Awards Banquet and Fundraiser sponsored by the Mining Foundation of the Southwest (MFSW) will be held at the JW Marriott Star Pass Resort, Tucson, AZ on Sa
Jan 1, 2011
-
Homestake's Ruby Hill Mine: A Case Study On How To Streamline The NEPA Process During Mine Permitting Using Properly Designed And Executed Natural Resource Baseline StudiesBy C. L. Wilsey, K. M. Oakes, W. J. Reich, M. J. Protani
The time frame required to complete the National Environmental Policy Act (NEPA) process for a new mine or the expansion of an existing mine can range from nine to 24 months, or even longer. The time
Jan 1, 2003
-
Caterpillar Introduces MineStar; Complete System Is The Next Step Toward Autonomous MiningEvver since it first displayed an autonomous mining truck at the 1996 MinExpo show in Las Vegas, NV, Caterpillar has been building the blocks to a fully autonomous mine. In May, the company unveiled
Jan 1, 2011
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
SME 2017 Arizona Conference Attracts Nearly 600 AttendeesBy William Gleason
"The mining industry tends to focus on very large numbers, whether it’s talking in terms of size of deposits, tons of material mined, the equipment used or the dollars spent. The numbers associated wi
Jan 1, 2018
-
Slicklines, Droplines, Diverter Boots—A Monograph - SME Annual Meeting 2025By Lauren M. Roberts, Ralph R. Sacrison
Pipeline or borehole free-fall transfer of material has long been done in support of underground mining. This paper addresses some characteristics and design elements in selecting systems suitable to
Feb 1, 2025
-
Promising options for solving the dolomite problem of the Florida phosphate resources—A brief reviewBy Dapeng Zhang, Brij Moudgil, Shibo Zheng, Chunhui Feng, Wenyi Song, Wending Xiao, Patrick Zhang
The separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. More than 50 percent of the phosphate reserve in Florida contains too much dolomite to proces
-
Planning of the San Francisco Public Utilities Commission’s Channel TunnelBy Art Hamid, Manfred Wong, R. John Caulfield
"The proposed Channel Tunnel is a critical component of the San Francisco Public Utilities Commission’s (SFPUC) Central Bayside System Improvements Project (CBSIP), which is a key element of a $6.9-bi
Jan 5, 2017
-
Rubber-Tired Haulage SystemsBy Christopher J. Bise
INTRODUCTION Face haulage in underground mines and pit haulage in surface mines are the principal domains of rubber- tired haulage vehicles. In underground mines, cable- reeled or battery-operated
Jan 1, 1986
-
Manhattan Segment of East Side Access Project: Design EvolutionBy Sanja Zlatanic, Michael P. Della Posta
New York State’s Metropolitan Transportation Authority (MTA) has undertaken the largest transportation project in New York City. The East Side Access Project (ESA) will introduce MTA’s Long Island Rai
Jan 1, 2001
-
On-Line Coarse Particle Size Measurement -Industrial TestingBy C. L. Lin
A PC image-based on-line coarse particle size analyzer has been developed to measure particle size distributions under plant situations where overlapped particles are being transported on a moving bel
Jan 1, 1995
-
Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote
On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun
Jun 23, 2024
-
Flotation of Salt-Type Minerals (185ce3d7-81a5-473c-b2e3-1c8b04f87b13)By P. Somasundaran, H. S. Hanna
The separation of minerals such as apatite and scheelite by flotation from other salt-type minerals such as calcite is extremely complex owing to the close similarity between their physicochemical pro
Jan 1, 1976
-
Empirical approach-based estimation of charge factor and dimensional parameters in underground blastingBy VIVEK KUMAR HIMANSHU, PK SINGH, AK MISHRA, MP ROY, RAVI SHANKAR
Underground blasting has many challenges. The primary aim of blast designers is to optimize drilling and blasting parameters to deal with the associated challenges. Optimizing these parameters is curr
-
An Approach To Preparing Reclamation Permit ApplicationsBy K. W. Grubaugh
The recently enacted federal surface mine law (P.L. 95-87) will increase further the complexity of securing a reclamation permit. This law intensifies the need to present the required reclamation plan
Jan 1, 1978
-
PrepreparationBy Charles A. Beasley, Vince Joyce, David E. Beasley, Orlando A. Gallegos, David A. Shuman, Mehmet H. Erten
COAL CHARACARISTICS AND PREPREPARATION REQUIREMENTS Preparation and Market Specifications The national ambient air quality standards (NAAQS) established by the Environmental Protection Agency in 197
Jan 1, 1991
-
Determination Of Open Pit Blast Sound Levels Using A Proxy Charge And Multiple Linear Regression - IntroductionBy K. E. Burgher
Since World War II, the need for the use of explosives in construction, mining, and quarrying near congested urban areas has increased dramatically. Often times a coal mine, once isolated from a city,
Jan 1, 1987
-
Agglomerated Heap Leaching Anaconda's Darwin Silver Recovery Project ? IntroductionBy David A. Milligan
This paper describes the Darwin Silver Recovery project, located 66 km (40 miles) outside of Lone Pine, near Darwin, Inyo County, California. A lead-zinc mine and a flotation concentrator were operate
Jan 1, 1983