Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Hypothetical Mine Models And Input-Output Requirements For Copper-Nickel Mining In MinnesotaBy David L. Veith
As the basis for the State of Minnesota's Regional Copper-Nickel Study environmental evaluation, hypothetical mine models were developed ranging in ore capacity from 5.35 to 20.00 x 106 mtpy. Ope
Jan 1, 1980
-
Mining Sites on Superfund's National Priorities List - Past and Current Mining PracticesBy Van E. Housman, Stephen D. Hoffman
The Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), also known as "Superfund", requires a listing of sites that have known releases or threatened releases of ha
Jan 1, 1992
-
An Environmental Audit ProgramBy Peter Keppler, Charles Jackson
WHY DO AN AUDIT? There is increased enforcement of environmental laws and regulations at State and Federal levels with attendant steep fines and even the possibility of jail sentences. We are al
Jan 1, 1991
-
Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka
The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin
Jun 23, 2024
-
Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground WorksBy Jürg Künzle
Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio
Jun 13, 2021
-
Dual-Purpose Mine Land Rehabilitation: Integrating Environmental Restoration and Sustainable Use for Tourism and Agriculture in Cajamarca - SME Annual Meeting 2025By F. Ysla, M. Mendoza
This proposal, based on the CIEMAN Cajamarca - Hualgayoc initiative, focuses on “Transforming Abandoned Mine Lands’’ We aim to study and assess the feasibility of an innovative rehabilitation method.
Feb 1, 2025
-
Predicting blast-induced ground vibrations in some Indian tunnels using decision treeBy G. P. JADAUN, ANINDYA PAIN, Aditya Rana, SAURAV RUKHAIYAR, N. K. Bhagat
This study compares three different techniques — decision tree, artificial neural network (ANN) and multivariate regression analysis (MVRA) — for predicting blast-induced ground vibrations in some Ind
-
The Effects of Seasonal Heat and Humidity on Mine Strata Temperatures in Underground Coal MinesBy P. T. Bissert, L. Yan, J. R. Srednicki, J. A. Yonkey
"Refuge alternatives (RAs) are required in underground coal mines to support life post-disaster. RAs are mandated by MSHA to maintain an apparent temperature (AT) at or below 95°F (35°C) while providi
Jan 1, 2017
-
Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023By Dan Ifrim, Andre Solecki
Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo
Jun 13, 2023
-
Stress Issues Impacting Design And Stability At OCI Wyoming’s Big Island Trona MineBy J. F. T. Agapito, L. J. Gilbride, K. Hollberg
Room-and-pillar mining at the Big Island Mine uses narrow, yield (i.e., load transferring) pillars to achieve high resource recovery and productivity. Two flat-lying 3- to 3fi-meter (10- to 11fi-ft) s
Jan 1, 2004
-
Improvement In Coal Preparation-Water Clarification Through Polymer FlocculationBy W. C. Foshee
The large volume of water used in coal preparation plants makes water recycling a necessity. Economical cleaning of dirty water usually requires flocculation with an efficient organic polyelectrolyte.
Jan 1, 1979
-
Thoughts on the Responsibility of Geotechnical Engineers and Hydrogeologists in MiningBy R. J. Sheets
"What is the primary responsibility of geo-engineers in mining? Early in my career, I was asked this question by an experienced engineer. After explaining some various tasks, I was informed that the m
Jan 9, 2018
-
Production Estimating Techniques For Underground Mining Using RoadheadersBy D. M. Neil
Road-headers are one of the most popular mechanized excavators used in mining and civil under-ground construction. These machines are primarily used in soft to medium hard rocks. This paper reviews th
Jan 1, 1994
-
Managing Cyclones: A Valuable Asset the Copper Mountain Case Study (44830731-0f7b-4606-82e1-1422dec82d1f)By M. Westendorf, T. Banerjee, S. Kaushik, D. Tinney
"The Copper Mountain Mine is located in Princeton British Columbia, Canada and produces 80 – 90 million pounds of copper annually, as well as gold and silver by-products. The ore processing plant has
Jan 1, 2015
-
Improving Reliability, Cost & Safety with Fluid Power SystemsBy T. R. Ley
"RELIABILITY & SAFETY – TOGETHER. REALLY? I was starkly reminded of the challenges facing by the coal industry while talking with a number of senior mining executives. One said to me: “Safety is the #
Jan 1, 2016
-
New Techniques In Beneficiation Of Florida Phosphates Of The Future - Part III - Beneficiation, Waste Disposal And Environmental Regulations - Abstract Of Parts I And II And Introduction To Part III.By James E. Lawver
Part I describes the general geology of the Florida deposits. As the lucrative Bone Valley Formation is depleted, replacement production will move progressively into areas of total Hawthorn production
Jan 1, 1983
-
Sphalerite Activation By Means Of The Copper Sulphate-Cyanide Combination. Application To The Monteponi Ores.By g. Caproni
The main constituent of the feed to the "Sulphide Section" (31 t/h), in the F. Sartori Plant (6000 tid) of the Miniere di Mon)eponi(Sardinia), is the ore of the Campo Pisano -Funtanaperda Mine (1 ? Di
Jan 1, 1971
-
Antamina ? Peruvian Mine Of The FutureAt the 25th Peruvian Mining Convention, the start-up of Antamina was called ?the mining event of the year.? Antamina, one of the largestcopper-zinc mines in the world, began operations in May 2001.Au
Jan 1, 2001
-
Drill & Blast Implementation Case Study at Multiple Sites within Freeport Mcmoran Inc.By L. Gutierrez, S. Gering, C. Calderon-Arteaga
"INTRODUCTION Drill and blast (DnB) represents the most important, and sometimes the most costly processes in a mine.. The cost of drilling and blasting operations greatly contributes to the “high cos
Jan 1, 2017
-
Coal Mine Ground Control Problems Associated With A High Horizontal Stress FieldBy James R. Aggson
This paper summarizes the research effort that was conducted as part of a cooperative agreement between the U.S. Bureau of Mines, Denver Mining Research Center and the Pittston Company. The objective
Jan 1, 1978