Hydraulic support instability mechanism and its control in a fully-mechanized steep coal seam working face with large mining heightBy F. T. Wang, Y. Yuan, S. H. Tu, X. G. Zhang
Hydraulic support instability (HSI) is one of the most common causes of disasters in underground coal mining, posing a threat to the safety of mine workers and normal operation of the equipment. It is
Jan 1, 2015
-
Electrical Energy Management In The Ferroalloy BusinessBy P. J. Brereton-Stiles, M. S. Rennie, N. Singh
Ferroalloy producers are large-scale users of electrical energy, which in many countries is in short supply and increasingly expensive. Preheating and/or pre-reduction using natural gas, recycled furn
Jan 1, 2004
-
Witwatersrand Gold Reef Evaluation: The ?Variancegram? ToolBy C. Lemmer
The resolution with which the different categories of resources are forecast for Witwatersrand gold reefs should ideally tie in with block sizes that are optimal in terms of the variability structures
Jan 1, 2014
-
The Use Of Performance Monitoring Techniques In Detecting Process Shifts And Potential Root Causes In A Variable Speed Grinding ApplicationBy T. Khumalo, L. P. Coetzer
This paper addresses the impact of the variable speed drive on the particle size distribution in the product of a fully autogenous UG2 grinding circuit. It further discusses the impact of a varying pa
Jan 1, 2006
-
Improved Understanding Of Explosive?Rock Interactions Using The Hybrid Stress Blasting Model ? SynopsisSince 2001, the Hybrid Stress Blast Model (HSBM) project members have developed a software suite to model the complete blasting process from non-ideal detonation to muck pile formation. To preserve th
Jan 1, 2012
-
The Use And Applicability Of Flow Models To Quantify Intermine Flow In The Western Witbank CoalfieldsAfter the closure of collieries, they naturally start to fill up with water. As a result, hydraulic gradients develop between them and different hydraulic pressures are exerted onto peripheral areas o
Jan 1, 2005
-
Service delivery strategy for mining systemsBy U. Kumar
Product designed characteristics like reliability and maintainability affect maintenance cost, service performance, and therefore product support strategy must be defined during design stage in terms
Jan 1, 2003
-
Modifications to underground coal mine personnel transport vehicles for mine rescue dutiesBy S. L. Bell
Most Australian longwall coal mines are currently working coal faces up to nine kilometres from the surface. In the event of a mine emergency walking this sort of distance wearing breathing apparatus
Jan 1, 2003
-
Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? SynopsisBy G. I. McPhail
The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t
Jan 1, 2012
-
Cracking A Hard Nut: An Overview Of Lonmin?s Operations Directed At Smelting Of UG2-Rich Concentrate BlendsKeywords: Pyrometallurgy, furnace, Lonmin, platinum, PGM, UG2 Lonmin, earlier than any other primary platinum producer, had to deal with the concentrating and smelting of UG2-rich ores and concent
Jan 1, 2011
-
Assessment Of Viscosity Of Slags In Ferrochromium ProcessBy L. Forsbacka, M. Nakamoto, L. Holappa
Viscosity of the slag is one of the central parameters when producing FeCr in submerged arc furnaces. It contributes to smelting behaviour and reduction kinetics of chromite ore as well as to the Cr r
Jan 1, 2007
-
Solidification Of An Al-Zn Alloy During Semi-Solid Processing - SynopsisBy S. L. George
The semi-solid metal casting process results in a unique solidification path. The microstructural features that were identified during the characterization of the as-cast microstructure, were used as
Jan 1, 2011
-
Mechanical–transport processes in salt: consequences for abandonment of underground exploitationsBy M. Ghoreychi, X. Daupley
ABSTRACT: The paper is devoted to two major aspects related to the abandonment of salt mines: 1)- Long-term risk associated with the mechanical instability of surface and its consequences for public s
Jan 1, 2003
-
Use Of Chemical Energy In Submerged Arc Furnace To Produce Ferrochrome: Prospects And LimitationsBy Chandrakala Kari, S. Mohan Rao, Gajanan Kapure, K. S. Raju
High carbon ferrochrome production process is energy intensive, consumes approximately 3300-3400 kWh per ton of metal produced. This amounts to ~ 34% of the total ferrochrome production cost. The powe
Jan 1, 2007
-
Limestone quarry quality optimization for a cement factory in Turkey - SynopsisBy A. H. Onur
Many factors govern the size and shape of an open pit, and these must be properly understood and used in the short and long-term planning of any open pit and quarrying operation. The importance of eac
Jan 1, 2008
-
A Case Study Of Risk Evaluation At Cerrejon MineBy Luis-Fernando Contreras, Juliano Maran, Richard LeSueur
A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res
Jan 1, 2006
-
Use of Geostatistical Bayesian Updating to Integrate Airborne Radiometrics and Soil Geochemistry to Improve Mapping for Mineral ExplorationBy J. M. McKinley
Mineral exploration programmes around the world use data from remote sensing, geophysics, and direct sampling. On a regional scale, the combination of airborne geophysics and ground-based geochemical
Jan 1, 2014
-
Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye ShaftBy K. Lombard
"‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof
Jan 1, 2015
-
DC Arc Smelting Of Silicon: Is It Technically Feasible?By M. Abdellatif
Keywords: Pyrometallurgy, furnace, DC arc furnace, smelting, silicon The technical feasibility of silicon smelting in a DC arc furnace was investigated. A graphite-lined furnace was operated at p
Jan 1, 2011
-
Relationships between comminution energy and product size for a magnetite ore - SynopsisAn extensive laboratory grinding study was carried out on a magnetite ore in order to assess the grinding behaviour of magnetic concentrate and tail from low intensity magnetic separation (LIMS).The t
Jan 1, 2010