Innovative Methods for Underground Parking in Central Cities
By Qi Wang, Zengzhu Kang, Jianguo Liu, Guanglei Liu
"Due to the increase of automotive vehicles, available parking spaces become a new type of limited resource in central cities of China, especially in those old districts without visionary urban planni
Jan 1, 2017
-
The Construction And Performance Of Prestressed Ground Anchors In Soils And Weak Rocks: A Personal Overview - Summary
By Donald A. Bruce
The paper reviews aspects of the construction and performance of prestressed ground anchors installed in soils and weak rocks. Attention is focused on good practice for drilling, tendon fabrication an
Jan 1, 1991
-
Deep Compaction Of Saturated Loess By Means Of Sand-Gravel Piles ? Synopsis
By Z. G. Lin
In Xian, China, compaction by means of soil (or lime-soil) piles is one of the effective methods widely used for densifying loess and eliminating its collapsibility. However, as a result of groundwate
Jan 1, 2010
-
Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:
By A. L. Garassino
Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside
Jan 1, 1994
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction
By Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Installation Of Marine Pile Foundations At The Skyway Project For The San Francisco Oakland Bay Bridge (16c93b01-e1c3-48e5-bd32-54e8ea2106cb)
By Robb L. Swenson
Construction of foundations for the Skyway Segment of the San Francisco Oakland Bay Bridge required innovative techniques due to the mass of the structures being inserted and the unique subsurface of
Jan 1, 2013
-
A Case History Studying On Displacement Controlling In Deep Excavation
By Feng Yongxuan
Anchored sheep pile is normally used in deep excavations, many of which only require stability in accordance with Terzaghi theory. In this paper, based on the experience, new lateral earth pressure me
Jan 1, 1991
-
Load Test On A Model Pile Driven Into Sand ? Summary
By A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
The Synergy Between Theory And Practice In Geo-Engineering
By Bas R. Hemmen
GeoBrain is a facility at GeoDelft with the purpose to provide society with all relevant geo-engineering knowledge and experience in a structured way. On the basis of the available knowledge and exper
Jan 1, 2006
-
Simulation of Offshore Piling using Advanced Dynamic Material Point Method (MPM)
By Shreyas Giridharan, Fursan Hamad, Sujith Gowda, Christian Moormann
"Pile installation in soil is a dynamic process which exhibits large deformation in the soil region. Experimental investigation of pile installation is both time and resource intensive. Numerical inve
Jan 1, 2017
-
Load Testing Of Steel Sheet Piling Driven With A Vibratory Hammer
By Drew Floyd
Five full-scale pile load tests were performed on pairs of PZ-22 sheet piles installed with a vibratory pile driving hammer. The sheet piling was installed in several locations in soil generally consi
Jan 1, 1989
-
Ultimate Skin Friction Of Single Batter Piles In Sand ? Synopsis
By A. M. Hanna
This paper presents the experimental investigation on the ultimate skin friction of batter piles. The model piles were pushed in medium dense sand deposits at different inclinations up to 30 with resp
Jan 1, 2010
-
Suction Piles And Suction Anchors For Offshore Structures
By S. Bang
In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien
Jan 1, 2009
-
Application Of Neurofuzzy Approach To Estimate Duration And Evaluate Delay For Diaphragm Wall And Barrette Construction
By Thoedtida Thipparat
The diaphragm walls and barrettes are very important to the constructions of multi-storeyed buildings, elevated expressways, subway railway stations, etc. Uncertainties particularly increase in accord
Jan 1, 2006
-
New Method for Reduction of Settlement Drilling Casings for Steel Core Piles
By Larsson Lars-Erik, Rani Isa, Martin Jönsson, Håkan Bredenberg, Mats Larsson
"IntroductionSteel Core Piles are used extensively in Scandinavian countries, where hard rock is found within reasonable depths. A steel core is cast into a drilled steel tube casing and a rock hole i
Jan 1, 2014
-
Tanana River Bulkhead Expansion, Flexibility In Construction; Key To Arctic Dock Construction
By Roy Peratrovich
An innovative cost-saving design for a 1,100 ft bulkhead on the Tanana River at Nenana in central Alaska won Alaska Construction & Oil magazine's Construction Achievement Award. The designers uti
Jan 1, 1985
-
Use of Menard Pressuremeter Test Results to Predict a Bearing Capacity and Settlement of Bored Piles
By Ramdane Bahar
"Abstract The design foundations can be performed using Menard pressuremeter rules that require a limit pressure and a pressuremeter modulus. In recent years, another trend of interpretation of this t
Jan 1, 2014
-
Bearing Capacity Of Footings And Piles - A Delusion? - DFI Annual Meting, October 14-16,1999, Dearborn, Michigan - Summary
By Bengt H. Fellenius
The bearing capacity equation?"the triple N formula"? is now about 50 years old. It was developed from theory of plastic resistance of metal to a cone being pressed into the surface of the metal, supe
Jan 1, 1999
-
Drilled Shaft Difficulties and a Micropile Solution
By Jeff Jackson, Paul Axtell, David Graham
The Montana Department of Transportation recently awarded a contract to construct a replacement bridge across the Clark Fork River in Heron, MT. Both abutments and both intermediate bridge bents were
Jan 1, 2018
-
Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes
By John E. Lens
Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at