Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Thermodynamic Modeling of Copper Chloride-Containing Systems in High Temperature Processes
By P. Taskinen, D. Lindberg, H. Viitala
The formation of copper chlorides in flue dust or deposits in heat recovery boiler of copper smelters or waste-fired boilers may lead to formation of corrosive partially molten deposits on walls and h
Jan 1, 2019
-
Implementation of Cyanidation by Size Class at Sleeping Giant Mill
By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon
"This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres
Jan 1, 2009
-
ERG Tailings Retreatment Project
"INTRODUCTIONGold tailings retreatment plants have been operated for many years throughout the world. Several large tailings retreatment facilities have been operated profitably in South Africa since
Jan 1, 1989
-
PT Redpath Indonesia and PT Freeport Indonesia Past and Future Development of Underground Mines
By Bruce Mennie
PT Freeport Indonesia (PTFI) operates copper and gold mining operations in a mountainous area of the Mimika regency, near Tembagapura, Papua (formerly, Irian Jaya), Indonesia. The mining and concent
Oct 1, 2010
-
Parameters for Cyclone Selection
By Norman A. Jull
"Factors which affect the separation achieved in a hydrocyclone are discussed and illustrated with graphs of some mathematical relationships.Definitions of separation and sharpness include comment on
Jan 1, 1972
-
Selection and Training of Mining Operators at Barrick Veladero; Strategic Factor for Mining Sustainability
By Zetti Gavelán
Lack of skilled workforce in mining industry during the current decade has been a serious concern for most mining organization globally. At the beginning of this decade the major envisioned difficulty
May 1, 2010
-
Experiences from an IREDES prototype project — Production drilling with Atlas Copco’s Simba L6C drill rig at LKAB Kiruna mine
By U. Olsson, M. Ramström
"The IREDES1 Special Interest Group (SIG) for drill rigs has been active since its launch during MineExpo 2000 in Las Vegas, Nevada, United States. SIG for drill rigs is responsible for the developmen
Jan 1, 2005
-
CIM 2011 - Process Development for Primary and Weathered Ores at the London Mining Marampa Iron Ore Project, Sierra Leone
By Peter Dunn
London Mining Plc. is developing an iron ore project in Sierra Leone. The Marampa mine is a brownfield development effort, having been operated by others since the 1930?s until low iron ore prices for
May 1, 2011
-
Comparison of the Catalytic Activity between Au and Pt for CO Oxidation within the Range of the Concentration of the Order from ppm to % for Indoor Air Purification
By Hiroaki Sakurai
Using batch reactors equipped with CO and CO2 gas sensor, CO oxidation over Au catalysts in room air has been investigated and compared with Pt catalysts. For both Au and Pt catalysts, the logarithm p
Oct 1, 2003
-
Framework for optimizing components in an oilwell cement slurry design
By D. Getzlaf
"Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s
Jan 1, 2004
-
The Justification of Process Control Systems in Mineral and Coal Processing Applications
By R. F. Hochstein, A. J. Neale, B. C. Flintoff
"Process control technology holds very significant potential benefits for many mineral and coal processing plants. The impact can be expected in terms of performance improvements (e.g. increased throu
Jan 1, 1990
-
Operation of La Mine Doyon
"At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.
Jan 1, 1984
-
Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike
By M. Rantapaa
Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the
Jan 1, 2005
-
Drill-to-mill: Efficient drilling and blasting resulting in increased mill throughput at Barrick Goldstrike (TECHNICAL PAPER)
By R. Mckinstry, M. Rantapaa, T. Bolles
"Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at the
Jan 1, 2005
-
Flowsheet Development for the Hypogene Geomet Unit in the Ivanplats Kamoa Copper Project
By S. R. Amos, N. O. Lotter, A. L. Hannaford, J. F. Oliveira, D. W. Broughton
"Ivanplats Ltd appointed Xstrata Process Support to perform the flowsheeting development work for their hypogene and supergene geomet units of the Kamoa Copper deposit, located in the Democratic Repub
Jan 1, 2013
-
Towards AG/SAG/ball mill on-line performance monitoring
By S. Caron, P. Radziszewski
Industrial practice in mineral processing shows that an important problem in understanding and monitoring in-mill parameters is due to the lack of fundamental knowledge and appropriate sensors. Howeve
Jan 1, 2004
-
Water Management Design for Cigar Lake Uranium Mine
By Ken Dyck Sr.
"Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to
Jan 1, 2006
-
New Technologies for Improved Processing of Base and Precious Metals Containing Ores
By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio
"Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.
Jan 1, 2013
-
Environmental Stewardship ? How do you balance impact with mitigation?
By Carol E. Jones
Outline ? Reclamation is a primary mitigation. ? Understand baseline environment and land use. ? Determine reclamation goals. ? Selecting reclamation technology. ? Determine technical risk. Rec
May 1, 2008
-
Mine ventilation fan specification and evaluation
By J. S. Stachulak, K. A. Mackinnon
This paper deals with specifying and evaluating fans for mine ventilation projects. Topics such as fan and equipment design life, operating points, and operating conditions are discussed. Common opera
Jan 1, 2004