Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Increase in efficiency of NOx reduction during simultaneous application of primary methods

    By L. Szecowka, M. Poskart, Siwka M. . J.

    Oxides of nitrogen, created during combustion, are the most hazardous components of atmospheric pollution. However, it is possible to limit the negative influence of hazardous components on the natura

    Jan 1, 2004

  • CIM
    The Dynamic Evolution Behaviours of the Mining Induced Fissure Elliptic Paraboloid Zone and its Application

    By Shugang Li

    Coal and coal-bed methane are valuable energy resources. If they can be extracted simultaneously and safely, the triple purposes of mine safety production, new energy resource supply and environmental

    Aug 1, 2013

  • CIM
    Separation Studies of Iron Ore Bodies Containing Apatite by Spherical Agglomeration Methods

    By E. C. Goodhue, R. D. Coleman, I. E. Puddington, A. F. Sirianni

    Iron ore samples containing apatite are fractionated to acceptable products by spherical agglomeration methods. The phosphorus is upgraded by a factor of 10 at an elevated pH. High-grade iron products

    Jan 1, 1968

  • CIM
    Experience in the Low Pressure Casting in Printed Molds of a Thin Bladed Aluminum A356 Impeller

    By G. Morin, F. Chiesa, B. Tougas, B. Duchesne, Jocelyn Baril, N. Giguère

    "An aluminum A356 compressor impeller was sand cast using the Low Pressure technique. The casting was limited in size (170 mm in diameter, 1.2 kg in weight) and very intricate in shape thus making 3D

    Jan 1, 2018

  • CIM
    A Novel Experimental Approach to Measure Particle Concentration Distributions in Leaching Tanks

    By O. G. Olvera, E. Asselin, D. Rival

    Particle concentration distributions in a leaching tank have been estimated using a novel experimental approach that takes advantage of the galvanic interactions that occur between pyrite (FeS2) parti

    Jan 1, 2014

  • CIM
    Managing Complex Ore and Waste Delivery Restrictions at CNRL with Wenco Survey-Grade GNSS and Dispatching Solutions

    By G. F. Trainor

    The complex ore body at CNRL?s Horizon mine presents some unique challenges in managing ore and waste delivery. With 25m x 25m ore blocks shovels often take bucket loads from multiple blocks to fill o

    May 1, 2013

  • CIM
    Multiple Factorial Anaylsis of Rock Fragmentation under Various Cyclic Loading Conditions

    By N. Erarslan, M. Ghamgosar

    The size of rock fragments depends on the nature of the loading applied the strength of the minerals and the texture of the rock. Research in the literature demonstrates that there is a distinct diffe

    Jan 1, 2015

  • CIM
    The Role of Bubble Air Stream in Selective Flotation

    By Vladislava A. Ignatkina, Victor D. Samyguin

    "Within the limits of two-phase approach, considering mass transfer with pulp and air streams was shown that each bubble appears to be an elementary carrier, transporting particles from the collection

    Jan 1, 2016

  • CIM
    An Approach to Measure Zeta Potential using Sedimentation Potential Method

    By M. Mirnezami, J. A. Finch, S. Uddin

    A fast, reliable and practical way of measuring zeta potential using sedimentation potential method is proposed. A cell was designed along with the instrument control software to determine the require

    Jan 1, 2009

  • CIM
    Fabrication of seam-welded aluminum tube for hydroforming

    This paper describes results of an investigation of fracture during tube expansion of 5052 and 5754 aluminum seam-welded tubes to optimize the forming of aluminum tubes during hydroforming. The tubes

    Jan 1, 2004

  • CIM
    Comparison of Two Failure Criteria for the Assessment of Haulage Drift Stability Using Stochastic Analysis and Numerical Modelling

    By Wael Abdellah

    Mine haulage drifts are the primary access to the mining blocks of an orebody in a multilevel mining system of a tabular ore deposit. The stability and functionality of haulage drifts are thus crucial

    Jun 1, 2012

  • CIM
    Extraction of Dimension Stone as a Co-Product of Civil Engineering Works: A Case Study

    By E. Lovera

    ABSTRACT: The current study analyzes the feasibility of an odd operation: to obtain, using a properly tailored drilling and blasting scheme, blocks suitable for the production of dimension stone from

    Jan 1, 2011

  • CIM
    Analysis Of LEFM Parameters And Fatigue Propagation Of Sent Cracked Am6ob Magnesium Specimens

    By Nur Hossain

    Analysis of Linear Elastic Fracture Mechanics (LEFM) parameters via the Virtual Crack Closure Technique (VCCT) has been obtained for SENT specimens of AM6OB magnesium alloy. It is found that the ratio

    Jan 1, 2010

  • CIM
    Design and Application of New Series of Large Shaft Sinking Headframe

    By Z. Q. Liu, J. M. Du

    "On the basis of analyzing current design and applications, the structure form, working loads and design principles of shaft sinking headframe are summarized in this paper. To overcome the insufficien

    Jan 1, 2019

  • CIM
    Strain-Controlled Thermo-Mechanical Fatigue Testing of Aluminum Alloys Using the Gleeble® 3800 System

    By X. -G. Chen, J. Qin, K. Liu, D. Racine

    "Understanding the thermo-mechanical fatigue (TMF) behavior of materials plays a significant role in the safety design of critical components used in aerospace and automotive industries, such as engin

    Jan 1, 2018

  • CIM
    Modeling Design of Working Boards with Reloading Points at the Border of Transferring Cargo from Railway to Motor Transport

    By B. R. Rakishev

    When transferring from the railway transport to the combined automobile-conveyor transport by stripping works at coal mines, it was proposed to form at the working zone a concentration horizon for rel

    Aug 1, 2013

  • CIM
    Numerical Simulation of Accumulated Damage in Critical Mine Infrastructure and Prediction of Further Damage Over Mine Life

    By Kathy S. Kalenchuk

    Damages have been observed in shafts, backfill infrastructure and the slick line at the Leeville Mine. Shaft damage (shearing and spalling of the concrete liner) is attributed to mine-induced rock mas

    Jun 1, 2012

  • CIM
    New Developments in the INPUT Airborne E. M. System

    By P. G. Lazenby

    This paper describes the latest instrumentation improvements in the INPUT Airborne E.M. System, particularly the new electronic signal-processing techniques. Several anomaly examples illustrating thes

    Jan 1, 1973

  • CIM
    Experimental and Numerical Investigation of Two-Dimensional Granular Flow Through Bins

    By P. D. Barrette

    This paper deals with the flow of granular materials in bins. A hybrid Lagrangian-Eulerian numerical model is introduced. The model is based on Particle-In-Cell (PIC) advection, and continuum equation

    May 1, 2007

  • CIM
    Size Effect in Fracture Toughness of Sandstone

    By M. Kataoka, Y. Obara

    It is known that compressive strength and tensile strength of rocks vary significantly with specimen size. Rocks are composed of crystals and grains in a fabric that includes flaws such as microcracks

    Jan 1, 2015