Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Gold-copper ores processing / flotation process optimization by the development of an on-line expert system

    By Yves Breau, François Robichaud, Jacques McMullen, Pierre Pelletie

    "The Expert System implemented at the East-Malartic mill controls a copper flotation circuit while taking into account the profitability of the operation. Treating a copper gold ore, the flow sheet in

    Jan 1, 2002

  • CIM
    Innovations in Gold and Silver Recovery: World Overview

    By Hans von Michaelis

    "INTRODUCTIONThe renaissance in gold and silver recovery technology has continued to unfold and it is appropriate to review some of the useful new technologies as well as try to identify some of the i

    Jan 1, 1985

  • CIM
    Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold Mining

    By Simon D. Handelsman

    ?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo

    May 1, 2006

  • CIM
    Environmental Control Design at Shebandowan Mines

    By T. Peters, W. C. Ferguson

    "Shebandowan is about 600 miles west of Sudbury and 50 miles west of Thunderbay close to the trans Canada highway. Shebandowan Lake is about 38 miles long. The ore body is located between No. 1 and No

    Jan 1, 1975

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988

  • CIM
    Replacement of Diatomaceous Earth Filter Aid with Alpha-Cellulose at the Laronde Refinery

    By François Robichaud

    "The Laronde mill has been in operation since 1988. Actual milling rate ranges from 7,000 to 8,500 mtpd. Laronde uses SAG/ball mill grinding followed by copper and zinc flotation circuits. A cyanidati

    Jan 1, 2007

  • CIM
    Aggregate resources in Nova Scotia

    By John H. Fowler

    "Most of the aggregate used in Nova Scotia is produced from numerous glaciofluvial and ice-contact deposits scattered throughout the province. Production from bedrock sources is increasing, with most

    Jan 1, 1982

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Advanced Control for Column Flotation

    By G. A. Kosick, G. S. Dobby

    "This paper presents the principles and application of a recently developed control system for flotation columns and column circuits. The control system uses triple pressure sensors to directly sense

    Jan 1, 1990

  • CIM
    Large Tire Users Group: A Collaborative Initiative of the Surface Mining Association for Research & Technology (SMART)

    By Bernard Jones

    LTUG ? A meeting of many mining companies that are using large tires ? Introduction of the mines and size ? Companies go over their usage of tires and performance ? As a group we discuss how the m

    May 1, 2009

  • CIM
    X-Ray Tomography Study on the Effect of Porosity on Fatigue Crack Initiation and Propagation in AM60 Die Casting

    By Zhuofei Yang, Jidong Kang, David S. Wilkinson

    The fatigue behavior of AM60 high pressure die casting magnesium alloys was studied in a straincontrolled manner. The fatigue test was interrupted every 2,000 cycles for X-ray tomography scanning. The

    Jan 1, 2014

  • CIM
    The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size

    By Dave Rose, Jacques McMullen

    "The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul

    Jan 1, 2017

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    VXP2500 Stirred Mill Optimization at Casmyn Mining Turk Mine

    By D. Rahal, I. Shah, B. Hines, S. Reddick

    "The development of stirred milling technology has proven to be an enabling technology in fine grained metallic deposits. The increased grinding efficiency allows for the economic size reduction requi

    Jan 1, 2014

  • CIM
    Perspectives on the scientific and engineering principles underlying flow of mineral pastes

    By Michael Li, Arie Moerman

    "Paste backfill as a means of supporting underground mining is gaining popularity. Despite this trend, engineering and design of mine paste backfill systems are still largely based on empirical method

    Jan 1, 2002

  • CIM
    Electric Furnace Off-Gas Cleaning Systems at PT Inco

    By Paykan Safe

    ?? Background ?? WorleyParsons Gas Cleaning ?? PT Inco Smelter ?? Process Design Considerations ?? Furnace Control and Combustion ?? Combustion Chamber ?? Spray Chamber ?? Draft Control ?? Bag

    May 1, 2008

  • CIM
    Study of Sphalerite Depression during Selective Flotation of Refractory Copper Zinc Ores

    By D. M. Wyslouzil

    "This paper was prepared for presentation at the 16th Canadian Mineral Processor's Annual Meeting, Ottawa, Ontario, Jan. 17 to Jan. 19, 1984.This paper gives an account of the development of treatment

    Jan 1, 1984

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    Coarse Lead Flotation Practice at Polaris

    By R. Simkus, J. K. Gowans

    Polaris Operations, a Cominco Ltd. lead-zinc mine, is located on Little Cornwallis Island, Northwest Territories, at Latitude 75°23' N and Longitude 96°75' w. When the Polaris Mine went into operation

    Jan 1, 1984