Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Geometallurgical Approach of the Copper-Nickel-Platinum Group Elements Maturi Deposit, Minnesota, USA, Using Quantitative Mineralogy

    By Charles Knilans, Tassos Grammatikopoulos, Nicole Hoffmann

    "Twin Metals Minnesota LLC, (TMM) has recently completed a prefeasibility study evaluating the development and operation of an underground copper (Cu), nickel (Ni), platinum (Pt), palladium (Pd), and

    Jan 1, 2015

  • CIM
    Structural Controls on Massive Sulfide Deposition and Hydrothermal Alteration in the South Sturgeon Lake Caldera, Northwestern Ontario

    By A. H. Mumin, A. K. Somarin, K. S. Oran

    "Synvolcanic structures played a fundamental role in the genesis, morphology, and siting of volcanogenic massive sulfide ores and associated hydrothermal alteration in the Archean South Sturgeon Lake

    Jan 1, 2007

  • CIM
    Selective Extraction of Copper from Copper Concentrates Containing High-Arsenic under High Pressure Oxidative Leaching

    By Kazutoshi Haga, Batnasan Altansukh, Atsushi Shibayama

    In this study, the dissolution behavior of copper and arsenic from five different copper concentrates containing 21-34.7 %wt. of Cu, 1.3-7.3 %wt. of As and 15.6-27.5 %wt. of Fe were investigated under

    Jan 1, 2019

  • CIM
    National Instrument 43-101 Standards of Disclosure for Mineral Projects – What Metallurgists Should Know

    By Tony Lipiec, Greg Gosson

    "When it comes to new mines being developed, there is a general industry consensus that most low-hanging fruit has been picked. Many projects currently in the mine development pipeline have been aroun

    Jan 1, 2010

  • CIM
    Simple Mechanisation of Narrow Vein Deposits in South Africa

    By Julian Wills

    The Candrill was developed with Soredem as a one-operator rockdrill for Canadian narrow vein mining. It provides the benefits of increased drilling rates, lower noise and vibration, mass reduction of

    Oct 1, 2001

  • CIM
    The development of process mineralogy at Falconbridge Limited and application to the Raglan Mill

    By J. S. Stickling, P. J. Whittaker, N. O. Lotter

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Millerite and Its Impact on Cu/Ni Separation

    By F. D. Ford, Z. Dai

    "Vale’s Ontario Operations re-introduced Cu/Ni separation at Clarabelle Mill in 2006. The mill processes ores from a number of mines in the Sudbury basin. A saleable Cu concentrate is produced at 30-6

    Jan 1, 2011

  • CIM
    Advancements in Coarse and Fine Particle Flotation

    By M. Fan, M. Mankosa, G. Luttrell

    "Column and other non-conventional flotation approaches continue to provide benefits where conventional flotation processes have exhibited limited success. This is particularly evident with respect to

    Jan 1, 2010

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Distribution of Gold in Hypogene Ore at the Ernest Henry Iron Oxide Copper-Gold Deposit, Cloncurry District, NW Queensland

    By P. J. Williams, A. R. Foster

    Petrographic studies, assay records, and laser ablation-inductively coupled plasma-mass spectrometer (LA-ICP-MS) analyses of major sulfides suggest nearly all of the gold at the Ernest Henry Cu-Au dep

    Jan 1, 2007

  • CIM
    The Bethlehem Molybdenum Plant

    By E. A. Lowe, A. F. Bellamy, J. W. Smith

    "In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall

    Jan 1, 1980

  • CIM
    An Economic and Environmental Case for Re-processing Gold Tailings in South Africa

    By James A. Brown, Marius Botha, Christopher A. Fleming

    "The technical and economic feasibility or re-processing hundreds of millions of tons of tailings in a number of historic gold tailings dams in the Witwatersrand area of South Africa is being investig

    Jan 1, 2010

  • CIM
    Deep shaft hoisting at LaRonde —The Penna shaft hoisting plant

    By B. McLaughlin

    Agnico-Eagle started sinking the Penna Shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240 m deep shaft. Exploration success led to the installation of a hoisting plant capabl

    Jan 1, 2004

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    The McClean Lake Operation COGEMA Resources Inc. JEB Mill Process Description and Commissioning

    By Art Carino

    "The McClean Lake operation is located in the Eastern Shore of the Athabasca Basin in northern Saskatchewan some 700-air kilometers north of Saskatoon. It is operated by Cogema Resources Inc., the maj

    Jan 1, 2001

  • CIM
    Knowledge Management for Organizational Learning and Innovation

    By Kimiz Dalkir

    Some things to keep in mind? ! What is your role in knowledge management? ! What knowledge-related challenges are you facing today? ! How does important knowledge get shared in your organization?

    May 1, 2003

  • CIM
    Laboratory Testwork of Mixed Xanthates for the Raglan Ore

    By Norman O. Lotter, Simon Yu, Tony Deng, Antonio Di Feo

    "Xstrata Nickel’s Raglan operation, northern Québec, achieved paymetal recovery gains in 2007 by switching the collector from potassium amyl xanthate to sodium isobutyl xanthate. To follow on from tha

    Jan 1, 2010

  • CIM
    Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral Processing

    By R. W. Lawrence

    "In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc

    Jan 1, 2007

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    Erection and Commissioning Issues for Large Grinding Mill Circuits

    By Randolph R. Dreher, Michael L. Schreder

    "In recent years, FFE Minerals has designed, installed and commissioned several large grinding mill circuits. This paper discusses the issues related to the erection and commissioning of large grindin

    Jan 1, 2001