Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007

  • CIM
    Managing Plant Data with the Millex Information Management System

    By L. K. Walker, G. A. Kosick, P. D. Young

    "MillEX is an information management system designed by mineral processors for mineral processors. The system utilizes ""cutting edge"" software technology to gather and store all automatically and ma

    Jan 1, 1992

  • CIM
    Evaluating Multi Zone Ore Bodies of the Raglan Nickel Deposit using Current Planning Techniques Complemented by Real Option Pricing.

    By Bruno Lemelin

    Falconbridge Ltd Raglan Mine has been in production since 1998 and has produced annually some 900 000T of ore grading 3.1% nickel, 0.9% copper and 0.06% cobalt. The mine is located in Nunavik, Norther

    May 1, 2004

  • CIM
    Energy Efficient Technologies for the Mining Industry

    By Bern Klein

    Motivation for Improved Energy Efficiency in Mining ? Canada potentially adopting Greenhouse Gas Emissions and Intensity Legislation in 2013 ? BC -Climate Action Plan and Energy Conservation Agreeme

    May 1, 2010

  • CIM
    Chemical Additives for Improving the Wet Grinding of Ores

    By R. Samuels, R. Klimpel

    "IntroductionLaboratory and industrial grinding tests have shown that the process of size reduction of metal containing ores can be significantly influenced by chemicals added to the slurry being grou

    Jan 1, 1979

  • CIM
    Investigation of Liner Wear at Chadormalu Semi-autogenous Grinding Mills

    By Mohammad Noaparast, Babak Fotoohi

    "Due to certain advantages in (semi-)Autogenous-Ball mill circuits in most of the high-throughput ore grinding units of mineral processing plants, much attention is paid to optimize the mill performan

    Jan 1, 2005

  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Development of a Mathematical Programming Model to Support the Planning of Short-Term Mining

    By Camilo I. Morales

    At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same

    Oct 1, 2009

  • CIM
    Flotation Column Scale-Up and Simulation

    By G. S. Dobby, J. A. Finch

    "I. INTRODUCTIONA significant development in flotation over the past few years has been the increasing industrial use of flotation columns, primarily in Canada. The column differs dramatically from co

    Jan 1, 1985

  • CIM
    Process Improvements at Bell Creek Mill

    By F. Flynn, P. Downey, G. Ritson

    "Bell Creek Mill which has been in continuous operation since 1987 has undergone numerous operational changes in the past three years. The addition of over 2. 5 million tons of resource at over 13 git

    Jan 1, 1997

  • CIM
    Continued Process Improvements at Campbell Mine

    By Ken Norris

    "Campbell Mine which has been in continuous operation since 1949 has undergone numerous operational changes in the past 3 years. This paper describes the process changes which have occurred at the Cam

    Jan 1, 1994

  • CIM
    Influence of Environmental Regulations on the Design of Barrick Goldstrike?s Roaster Off-gas Cleaning Circuit

    By Andy Cole

    Barrick Gold recently implemented an oxygen roasting process to treat carbonaceous ore from its Goldstrike property in Nevada. One of the key project challenges was the design of the roaster gas clean

    May 1, 2002

  • CIM
    The Design, Commissioning and Operation of the Golden Giant Paste Backfill Plant

    By Jim Dodd, Jim Paynter

    "We would like to acknowledge the efforts of the following key people who helped to make this project a success.Ron Jung, instrumentation supervisor for the Golden Giant Mine, spent many hours reviewi

    Jan 1, 1997

  • CIM
    Processing of Calcium Carbonates

    By David R. Skuse, Jacek A. Kostuch, Steven M. Fortier

    "Particulate ground calcium carbonate (GCC) is used as a filler and coating pigment in a wide range of applications including papers, paints, plastics and films. In this paper we will overview the req

    Jan 1, 2004

  • CIM
    Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill

    By C. Doucet

    Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties

    May 1, 2007

  • CIM
    Decommissioning Pits with Ecological Engineering

    By M. Kalin

    "Ecological Engineering, a biotechnological approach to the decommissioning of base metal mining wastes, is being tested on two pits (Gloryholes) in Newfoundland, Canada. Pit #2 has an average pH of 3

    Jan 1, 1992

  • CIM
    Techniques for Coarse-Particle Beneficiation of Some Gold Ores and Methods of Determining Potential for Sorting Any Gold Ore Deposit."

    By Steve Wilkinson

    """Techniques for coarse-particle beneficiation of some gold ores and methods for determining potential for sorting any gold ore deposit.""With the advent of high speed computers, laser technology end

    Jan 1, 1985

  • CIM
    Hydro-geotechnical and geochemical characterization of column consolidated cemented paste backfill

    By T. Belem

    The main objective of this study is to better understand the effect of underground CPB placement conditions on its microstructural, hydro-mechanical and geochemical properties. To reach this objective

    May 1, 2007

  • CIM
    Peñoles Mines - Mexico. Lessons learned on Concentrator’s Commissioning and Expansions

    By Rodolfo Espinosa Gómez

    "Industrias Peñoles, S.A. de C.V. – Mining Division, has initiated in the last ten years, six Mining Operations (Bismark, Tizapa, Ciénega, La Herradura, Rey de Plata, and Francisco I. Madero) and it h

    Jan 1, 2004

  • CIM
    Flotation Feed Size Distribution

    By Claude Bazin

    "Laboratory semi-batch flotation tests were conducted using two different sulphide ore samples. The size reduction was adjusted to cover a wide range of flotation feed size distributions. Results show

    Jan 1, 2006