The Burra Treatment ProcessBy Parker RL
A 250 tons per day ammonia-ammonium carbonate leaching plant is now being operated by Samin Limited, to extract copper from the oxidised ores at the Burra mine. This forms the first stage of a plant
Jan 1, 1971
-
Decelerometer Shaft InspectionsBy Golosinski T. S, Jorgenson J. D
Several methods are available for inspections of mine shafts. These involve use of inclinometers, moving beams, inertial platforms and decelerometers. Inspections which use decelerometers are of mos
Jan 1, 1995
-
Method of Faceline Fall Recovery and Mining Strategy Developed to Imrpoved Longwall Availability at Cook CollieryBy Adams DG
At Cook Colliery a combination of main injection of the face coal, and mining into the floor has proved successful for the recovery of faceline falls.The strategy for preventing falls relies upon a co
Jan 1, 1991
-
Presidential Address: The 21st Century - Mining for Mankind: The Responsibility is oursWelcome to this 13th Congress of The Council of Mining and Metallurgical Institutions. It is twenty one years since The Australasian Institute of Mining and Metallurgy last hosted this congress an
Jan 1, 1986
-
Exploration Geochemistry for Gold in Deeply Weathered Terrains: Sample Preparation TechniquesBy Govett G. J S, Currie D. A, Cohen D. R
Analysis of mechanical size fractions of soils around the Paddington deposit (W.A.) and the Charters Towers Goldfields (Queensland) shows a bimodal gold distribution, with enrichment in the coarse
Jan 1, 1988
-
The Use of Wireline Logging to Control BlastingOpencast blasting is notoriously subject to variable blasting conditions, some of which are related to changes in ground conditions and some to human and equipment factors. As drilling and blasting
Jan 1, 1988
-
Development of a Coal Seam Water Jet Longhole DrillBy Just GD, Phillips R
The application of high pressure water jet technology to the drilling of longholes in coal has resulted in the development of a system currently capable of drilling to lengths greater than 200m. Field
Jan 1, 1991
-
Small Pilot Plant Trials of Sirosmelt Copper SmeltingBy Grace NC, Lightfoot BW
Small scale trials of the smelting of a copper concentrate in the Sirosmelt submerged lance reactor are described. Pellets of concentrate were dropped into the reactor while injecting air-rich mixt
Jan 1, 1980
-
A Continuous Oxygen Probe for Non-Ferrous Smelting SlagsBy Flloyd J. M
A continuous oxygen probe,incorporating a SIRO2 solid electrolyte oxygen sensor which measured the oxygen potential of a small volume of gas enclosed above the melt's surface,was constructed
Jan 1, 1987
-
Impact of Longwall Width on Overburden BehaviourBy Grady PO
The longwall panels at Clarence Colliery have experienced intermittent sudden weightings on the face that have caused some production delays. These weightings have typically been more severe on the wi
Jan 1, 1998
-
Mining from Deeper Levels at Mount Lyell the 50/60 Series Mining PlanBy McMullen P. H
Mining of copper ore at Mount Lyell has been continuous since 1893. The operation has always been marginal and the depressed copper Market over the last decade has seen mining continue on the basi
Jan 1, 1988
-
Power Supply for Resource ProjectsThe provision of electrical power is an important consideration in project develop- ment. The first step to be taken in this area is to assess the power requirements of the project. The alternative
Jan 1, 1986
-
Column Flotation-An Australian PerspectiveBy Dunne R. C
Column flotation is receiving increased interest from both an industrial and research perspective in Australia. The traditional overseas application as a molybdenum cleaning cell is being expanded
Jan 1, 1987
-
The Use of Blasting Models for the Optimisation of Mine ProductivityBy Paine GG
In coal mining each of the unit operations are interrelated with each preceding operation having an effect on subsequent operations. This presents difficulties for determining when the lowest overa
Jan 1, 1987
-
Titrimetric Studies on Activated CarbonsBy Kinsella B
Titrimetric studies have been carried out on the activated carbons Kintal 1105, Norit 2520 and Kuraray 2GA. Titration curves of the carbons before and after acid and water washing and gold loading ind
Jan 1, 1984
-
Experiences eith the Electric Overhead Trolley System at the CSA Mine, CobarBy Roberts M. L
Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa
Jan 1, 1988
-
Determining the Open Pit to Underground Transition – a New MethodBy P A. Grossman, J H. Rubinstein, M Brazil, D Whittle
Many ore reserves are harvested by a combination of open pit and underground mining methods. In these cases, there is often material that could be mined by either method, and a choice has to be made.
May 9, 2016
-
Gas Discharge Modelling of a Bottom Blown Slag MeltBy Das A. K
Investigations were carried out to understand the effect of liquid viscosity (u = 1 x 10-3 - 5 x 10-' Ns/m2) on the size of primary bubbles formed at high gas injection rates (Q = 100 - 1000 c
Jan 1, 1987
-
Highwall Trench Mining as a Primary Production Method of Coal ExtractionOaky Creek Coal (OCC) has embarked on an ambitious program to fast track the introduction of Trench Mining into its current mining operations. The project has the capacity to allow the extraction of r
Jan 1, 1992
-
Monitoring of A Railway Tunnel Excavated Through Bouldery SoilBy Thomson S, Eisenstein Z
Field instrumentation was installed to monitor ground and lining behaviour during and after construction of the Mount Shaughnessy Tunnel (Rogers Pass Short Tunnel) in Canada. The instrumentation w
Jan 1, 1987