Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Making Hard Rock In Situ Recovery a Reality

    By P Breuer, D J. Robinson, A McFarlane, L L. Kuhar

    Increasing global demand for commodity metals and capital and the greater operating costs of mining and metal production present significant challenges for the metals mining industry. Current conventi

    Nov 4, 2015

  • AUSIMM
    Geotechnical behaviour of spent ore – impacts of metallurgical factors

    By R Rimmelin, C Vergara

    Heap leach pads are composed of mined ore, usually crushed, disposed on liners to be processed with leach solutions, and the tail of the process is called “spent ore” which are then transported by con

    Jul 23, 2018

  • AUSIMM
    New Life for the Argyle Diamond Mine – Block Cave Style and Beyond

    By D C. Ford

    The Argyle AK1 orebody was discovered in 1979 and subsequently found to be a large, economically viable reserve with high grade diamondiferous ore. Production began via an open pit operation

    Aug 22, 2011

  • AUSIMM
    Influence of iron ore chemistry and mineralogy on sticking and breakage of pellets inside shaft furnace

    By M I. Pownceby, A Guiraud, S Purohit

    Sticking and breakage of iron ore pellets during high temperature reduction can result in several operational challenges during shaft furnace ironmaking. With the shift to H2-based DRI processes and d

    Sep 18, 2023

  • AUSIMM
    Early Development of the Theory of Froth Flotation

    By J T. Smit

    The theory of froth flotation developed slowly, in almost all cases lagging behind practical developments in the operation of flotation processes. This was largely the result of a lack of understandin

    Jan 1, 2005

  • AUSIMM
    Thermal phosphorus – it’s a hot commodity with a hot process

    By R Atmuri, W Liang, R Prasad, Y Liu, E Wingate

    Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the

    Aug 21, 2024

  • AUSIMM
    Grinding Circuit Improvements at Evolution Mining’s Edna May Operation

    By D Atheis, S Williams, A Dance, D Taplin

    "Resurrected from its former life at the Big Bell operation, the grinding circuit at Evolution Mining’s Edna May operation in Western Australia has many a story to tell. The task of optimising a plant

    Sep 1, 2014

  • AUSIMM
    Rapid Logging of Different Magnetic Phases in Banded Ironstones Using a Travelling Three-component Vector Magnetometer

    By C A. Foss, K Leslie, C Arnold

    Magnetic susceptibility measurements provide rapid, non-destructive testing of drill core, but cannot directly map magnetite and/or hematite content. Combined magnetic susceptibility and magnetisation

    Jul 13, 2015

  • AUSIMM
    Underground Mining and Water Management

    By C J. Moran

    All mines face water management challenges. Adopting leading practice water management strategies can help reduce both operational and strategic risks. While many of the water issues faced by undergro

    Mar 21, 2011

  • AUSIMM
    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003

  • AUSIMM
    Investigation of silica removal by reverse flotation to improve quality of mixture concentrates produced through spiral gravity separation and Slon-VPHGMS process

    By M Saghaeian, A H. Baladastian, A Dehghani Ahmadabadi, V Sheikhzadeh, R Hejazi

    This research was done to reduce silica from mixed hematite concentrate of Barfkar Iron Ore Sample and increase Fe grade using reverse flotation method (Depressing Hematite and floating Silica). The u

    Aug 24, 2022

  • AUSIMM
    Ferroalloy extraction from a Zimbabwean chrome ore using a closed DC furnace

    By S Bright, M J. Masamvu, E K. Chiwandika, S Dandi, S M. Masuka

    The depletion of high-grade hard and lumpy chrome ores has forced Zimbabwean ferrochrome producers to resort to low-grade friable ores that have an average of 28 per cent fines against a set limit of

    Jun 19, 2024

  • AUSIMM
    Reproduction of inequality constraint between iron and silica for accurate production scheduling

    By N Madani, S Abulkhair, N Morales

    Conventional geostatistical algorithms cannot reproduce bivariate complexities such as inequality constraint, nonlinearity and heteroscedasticity. Poor reproduction of these features may decrease the

    Nov 8, 2021

  • AUSIMM
    Eco-efficiency of ANFO and bulk emulsion explosives application in Indonesian mining

    By H Utama, R Heryadi

    The demand for environmentally friendly commercial explosives has increased globally due to concerns regarding environmentally friendly mining activities. Ammonium nitrate fuel oil (ANFO) and bulk emu

    Sep 1, 2024

  • AUSIMM
    Approaches to Estimating the Erosional Stability of the Nabarlek Tailings Pit Cover

    By S J Riley

    The cover (cap) over the tailings pit at Nabarlek uranium mine must be structurally stable as it will act as a barrier to radon gas emission and have to contain other long-lived radionuclides. Struc

    Jan 1, 1994

  • AUSIMM
    Iron Ore Washing – Achieve More with Fewer Resources

    By M Zlatev, S Silge

    Producers of primary resources such as iron ore face the challenge of processing crude materials with increasing levels of impurities, which may result in the requirement for wet processing. This resu

    Jul 13, 2015

  • AUSIMM
    Ventilation and Cooling Design for Long Declines

    Declines for both access and rock haulage are replacing shafts for mining relatively shallow deposits of down to 1000 m below surface. Where the orebody does not outcrop and where surface access may b

    Jan 1, 2005

  • AUSIMM
    Regulatory Perspective ù Development of Closure Plan With Adequate Financial Assurance for the Protection of Ground Water Quality at the Chino Copper Mine

    By K Myers

    Since the mid-1990s, the Chino Mine Facility (Chino) located near Silver City, New Mexico has been developing a closure plan with financial assurance to protect water quality, as required by State reg

    Jan 1, 2003

  • AUSIMM
    Comparison of Acid Production From Pyrite and Jarosite

    By M Berndt

    Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt

    Jan 1, 2003

  • AUSIMM
    Calculating the Value of Iron Ores in Ironmaking and Steelmaking

    By T Honeyands

    At present we are witnessing large investments in the iron ore industry, fuelled by demand from Asia. At the same time, there is a changing landscape in pricing of iron ores, with the recent demise of

    Jul 11, 2011