Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Precipitate Flotation for the Removal of Heavy Metals and Cyanide from Metallurgical EffluentsBy CorrOa de Araujo A, Salum MJG
The treatment of mining and metallurgical liquid effluents is becoming, everyday, a necessity felt by these industries. Physical-chemical and chemical methods for treating such effluents are general
Jan 1, 1993
-
The integration of mine-to-mill and grade engineering at Anglo American’s Los Bronces Mine using IESBy J Rutter, E Amini, D La Rosa, N Beaton, M Scott, F Faramarz, L Keeney
Anglo American’s Los Bronces copper mine in Chile has been conducting detailed assessments investigating value adding options for their asset. The mine has conducted several detailed Mine-to- Mill and
Nov 10, 2020
-
The Impact of Residence Time on Copper Recovery in Telfer Gold MineÆs Cyanide Recycling ProcessBy P Breuer, A Simons
The sulfidisation, acidification, recycle and thickening (SART) process is currently being used at NewcrestÆs Telfer Gold Mine to recover cyanide and copper from the cyanidation tails of the pyrite co
Sep 26, 2013
-
Unravelling the Factors Impacting on Concentrate Quality by Geometallurgical Data Analysis at Fortescue Metals Group’s Iron Bridge Magnetite MineBy A Manfrino
The Iron Bridge magnetite mine and infrastructure project is currently in development as a joint venture between Fortescue Metals Group, Formosa and Baosteel. It is supported by an extensive database
Jul 13, 2015
-
What Information and Production Benefit Can I Gain by Using Digital High-Speed Camera and Data Capture Technology?This paper will address this question from the point of view of a drill and blast engineer or researcher working in open cut and underground mining operations. The paper will establish a common set of
Jan 1, 2007
-
Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mineBy S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi
Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine
Aug 2, 2023
-
Trident Underground Gold Mine – The First Three YearsBy J Howard
Following discovery in October 2004, commencement of development in February 2007 and first ore production in mid 2007, the Trident gold deposit, located in the Eastern Goldfields of Western Australia
Mar 21, 2011
-
Mining Truck Operations in Association with Truch-Jig ApparatusThis paper describes a mine truck hauling process called "Truck Jigging" which is currently the subject of a process patent application.The investigation explores the production and cost adv
Jan 1, 1989
-
Acidic Drainage From Calcareous Coarse Kimberlite Reject, Ekati Diamond MineTM, Northwest Territories, CanadaBy J Millard, K Sexsmith
BHP Billiton Diamonds Inc (BHPB) has been mining kimberlite from several pipes at the Ekati Diamond MineTM located 300 km north of Yellowknife since 1997. Processing of kimberlite produces coarse kimb
Jan 1, 2003
-
Simulation of Flotation Feed Pre-ClassificationBy J Arola, B Kettunen, W M. Bond
Separation of fine and coarse particles as separate streams prior to flotation, and their differential treatments, could substantially increase recovery and reduce collector consumption. A series of s
Jan 1, 2005
-
Knelson Continuous Variable Discharge Concentrator: Analysis of Operating VariablesBy I Grewal, B Klein
The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass
Jan 1, 2001
-
Assessment of lifter effect on tumbling mill dynamics using CFD-DEM coupling approachBy K Mayank, A N. Mainza, I Govender, M Narasimha, A Mittal
In mineral processing industries grinding is the most energy-consuming process. A tumbling mill is an essential grinding equipment widely used for particle size reduction. Power consumption, impact fo
Aug 24, 2022
-
Data cross validation for a newly commissioned dynamic drop test facilityBy D W. Evans
Research into the dynamic properties of ground support elements continues to grow at a global level, given the increasing importance of this field of application within underground hard rock mining. M
Nov 29, 2022
-
Surface Monitoring, Understanding and Modification at Molecular Level in Mineral Beneficiation by Infrared External Reflection SpectroscopyBy E Mielczarski
Determination of the adsorbed layer composition and structure at molecular and atomic levels and understanding adsorption mechanisms and dynamics are vitally important for the preparation of surface l
Jan 1, 2005
-
Estimation of Rock Load for Tunnels with Different Disturbance FactorsBy J Rostami, T Afshar, M Sharifzadeh
Accurate estimation of rock load and selection of types of ground reinforcement to match post-failure behaviour of rock mass are important issues to assure tunnel stability. This paper focuses on the
Sep 17, 2014
-
Five Years With Paste Fill ù Experience at Henty Gold MineBy T J. Grandfield
Paste fill has been used successfully at Henty Gold Mine for the past five years. It has allowed 100 per cent extraction of the orebody, stabilised poor ground and enabled wide sections and offsets to
Jan 1, 2002
-
Improving Fine Sulfide Mineral Recovery ù Plant Evaluation of a New TechnologyBy K Ellis, B Lumsden
A full-scale statistically-based on/off plant trial of a new flotation conditioning technology designed to improve fine mineral recovery was undertaken to determine whether the recovery of selected fi
Jan 1, 2005
-
Understanding the Role of Production Drilling and Drilled Stocks in Efficient Operation of a Sublevel Cave MineBy C Beal
Proper understanding and management of production drilling in sublevel cave (SLC) mines is essential for meeting production targets and for avoiding inefficiencies that could lead to costly bottleneck
Mar 24, 2014
-
Geometallurgical Communication as a Distributed Information SystemBy C Moorhead, J Jones
A common problem in the mining industry is that company geologists can operate in relative isolation to the rest of the company (Jones and Moorhead, 2011). This may result in poor knowledge transfer a
Sep 29, 2013
-
Use of drone and LiDAR technology for mapping underground voidsBy D Woolmer
Since January 2019, BHP Olympic Dam have been trialling the use of a drone based LiDAR mapping system for the purpose for surveying stope voids. This new technology utilises Simultaneous Location and
Mar 15, 2021