Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
  • AUSIMM
    Are Your Megaproject Schedules and Costs Under – or Out of – Control?

    By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson

    "Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu

    Mar 8, 2016

  • AUSIMM
    Zooming Out – Learning to See Rehabilitation through Stakeholders’ Eyes

    By J L. Merritt

    The mining industry seeks to engage with and respond to stakeholders through open consultation processes during the various phases of a mining project (Department of Industry, Tourism and Resources, 2

    Jun 28, 2016

  • AUSIMM
    Comparison of the Generation of Shear Wave with Different Simulation Approaches

    By M Chen, Q D. Gao, Y G. Hu, P Yan, W B. Lu

    The safety and stability of construction structures are often affected by blast-induced waves. Investigating the generation mechanism of shear wave (S-wave) during blasting is important, because it ha

    Aug 24, 2015

  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining

    By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova

    "Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus

    Nov 15, 2016

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Legacy tailings dams – asset or liability? A case study on sub-aqueous tailings reclamation

    By M Jones

    Legacy tailings storage facilities exist within operating mine sites across Australia. These tailings storage facilities are often viewed as rehabilitation liabilities but with considered assessment m

    Sep 1, 2024

  • AUSIMM
    Bituminous Geomembranes in Mine Construction

    By R McIlwraith, B Breul

    "This paper discusses the successful use of bituminous geomembranes (BGMs) in mining applications since their development in 1974. It explains and illustrates the structure of a BGM composite, which i

    Jul 27, 2015

  • AUSIMM
    Full Cycle Tailings Management at Fosterville Gold Mine

    By L P. Gray

    "From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro

    Oct 10, 2016

  • AUSIMM
    TEMCO û The Australian Ferro Alloy Producer

    By Berglin IK

    Since 1962, ferro alloy production in Australia has been concentrated at Bell Bay, Tasmania with a major expansion occurring in 1976. This concentration was based originally on the perceived requireme

    Jan 1, 1985

  • AUSIMM
    Dense Medium Separation at Mt Newman

    The Mt Newman Beneficiation Plant uses a combination of heavy media deans, heavy medium cyclones and Reichert cones to produce saleable iron ore concentrates from low grade iron ores. The aim of t

    Jan 1, 1987

  • AUSIMM
    Identifying Gold Losses Through the Application of SIMS Technology

    By P Hayward a, P Evans, K Prince, F Radke

    Operating efficiency is becoming paramount as the mining industry moves towards globalisation and conglomeration. Mining companies are continuously searching for new technologies that can improve plan

    Jan 1, 2004

  • AUSIMM
    South-west Ventilation Shaft Project at Newstan Mine

    By D Piason

    Newstan Mine commenced mining operations in 1887 and has since undertaken extensive mining within the Young Wallsend, Great Northern, Fassifern, Borehole and West Borehole coal seams using a range of

    Aug 31, 2015

  • AUSIMM
    Grade Control Techniques at Paddington Gold Mine

    By Amos QG

    The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substan

    Jan 1, 1986

  • AUSIMM
    Risk Assessment for New Technology in the Open Cut - Wambo Dragline

    By Lumley G. I, Duffy W. J

    The risk involved with incorporating new/unfamiliar technology into mines has, in the past, largely been evaluated by the supplier of the technology. The implications on safety and productivity has be

    Jan 1, 1992

  • AUSIMM
    Integrating Data, Applications and Users

    By McAuley T. J

    Computer software is an integral part of mining operations today with many sites using six or more software packages on a daily basis. However, the use of these different programs generates the need

    Jan 1, 1995

  • AUSIMM
    Bleg: A Geochemical Tool in the Great Sandy Desert

    The BLEG (Bulk Leach Extractable Gold) technique is a semiquantitative measure of cyanide extractable gold contained in a sample. A 5kg sample is leached in cyanide solution for 24 hours and gold

    Jan 1, 1988

  • AUSIMM
    Developing Raise Boring Technique in China

    By Weimin F

    In the last decade, great strides have been made in the raise boring technique in China. Extensively, the drilling and blasting method has been replaced by the mechanized raising method since 1980

    Jan 1, 1987

  • AUSIMM
    Application of Atomic Absorption Specthophotometry

    In Mount Isa voltage and frequency fluctuations caused. by haulage shaft operation gave considerable difficulties with the initial application of Atomic Absorption Spectro-photometry.The methods used

    Jan 1, 1963