Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design and Commissioning of the Sepon Copper Pressure Oxidation Circuit

    By A G. Pavlides, B L. Weekes

    The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr

    Jan 1, 2005

  • AUSIMM
    Development of Trials for Rehabilitation of a Bucket Wheel Excavator Spoil Dump

    By Walton S, Wheeler D. J, Sargent D. M, Ting L. Y

    Goonyella-Riverside mine is an open cut coal mine in Central Queensland. One component of the mining operations at this site is an uncompacted spoil dump some 50 m above the natural ground surface and

    Jan 1, 1992

  • AUSIMM
    Structural Analysis of Acoustic Televiewer Logs for Large Diameter Raise Bored Shafts

    By R M. Stephenson

    Large diameter raise boring is a common raise excavation method in the Australian mining industry. Geotechnical investigations were conducted on several large diameter raise bore projects at Gwalia Mi

    Mar 24, 2014

  • AUSIMM
    Advances in In Situ Testing of Ventilation Control Devices for Underground Mines

    By M Salu, G J. Kay

    "As underground mines increasingly face the challenge of maximising production without losingfocus on safety excellence, the ability to predict the eff ectiveness of mine seals and stoppings andthe id

    Jun 1, 2012

  • AUSIMM
    Rocktype classification and domaining of complex stratiform Zn-Pb-Ag mineralisation at the George Fisher Mine using high resolution XRF Core scanning

    By R Valenta, I Fahey, M Klawitter, N Spanswick

    Zinc-Lead-Silver (Zn-Pb-Ag) mineralisation at the George Fisher Mine occurs in multiple structurally-disrupted stratiform orebodies hosted within a mid-Proterozoic sequence of calcareous siltstones an

    Nov 21, 2018

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Development of Boomtype Tunnelling Machine for Hard Rock

    By Itoh K, Sakai K, Tsuji K

    In Japan there exists a strong demand for mechanical excavation for tunnelling bacause the blasting method which produces much vibra- tions and noises is restricted in its applica- tion due to the f

    Jan 1, 1987

  • AUSIMM
    Should the Blast Exclusion Zone Be Based on a Qualitative or Quantitative Analysis? A Practical Implementation Conundrum

    By K Muller, T Oosthuizen

    Blast exclusion zones are instrumental in protecting equipment and personnel. When there is no constraint in footprint, the exclusion zone can be enormous, practically eliminating the hazard of flyroc

    Aug 24, 2015

  • AUSIMM
    Quantification of surface sensor representivity of primary crushed ore for bulk ore sorting

    By J Rutter, D Francois-Bongarcon, M Federov, N Odiar, M Scott

    There are two fundamental methods for metalliferous sensing of primary crushed ore available for deployment at operations. These methods can be classed as surface measurement techniques (including XRF

    Nov 10, 2020

  • AUSIMM
    Further Improvement to a Safe and Efficient Procedure to Blast, Excavate and Dispose of a Reactive Rock Type

    By Ash M

    The world-class iron ore mines at Mt Whaleback, Torn Price and Paraburdoo located in the Hamersley Province of Western Australia must mine the Mt McRae Shale to obtain high grade ore from the Dales

    Jan 1, 1995

  • AUSIMM
    Mine Water Resource Management Systems

    By Gillies A. D S, Lee A. H

    The major operational objectives of a mine water resource management system (WRMS) are to supply the water needs of the mine and mill, to minimise disturbance to mining due to rainfall flooding or see

    Jan 1, 1992

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Recent Developments in Strata Bolting in National Coal Board Mines in the United Kingdom

    Strata bolting/dowelling reinforcement techniques are being reintroduced into the mines of the National Coal Board. There are strong reasons for the selection of the full hole anchorage principle o

    Jan 1, 1971

  • AUSIMM
    Detailed Underground Measurements of Roof Deflection and Bed Seperation

    By Prohaska G, Jackson F, Jack B

    To learn more about the fundamental roof behaviour in South African coal mines, accurate underground measurements of roof deflection were conducted in bord and pillar panels during development and

    Jan 1, 1992

  • AUSIMM
    Life Cycle Based Water Footprints of Selected Mineral and Metal Processing Routes

    By N Haque, S Northey

    Water in mining, mineral processing and metal production on a life cycle basis has been at the top of agendas for various industries, government agencies, research organisations, academic institutions

    Nov 26, 2013

  • AUSIMM
    Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process

    The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.

    Jan 1, 1993

  • AUSIMM
    Field-Scale Assessment of Bioremediation Strategies for Two Pit Lakes Using Limnocorrals

    By R Pie, J Crusius, P Whittle, J J. McNee

    The Main Zone and Waterline pit lakes at the Equity Silver Mine near Houston, BC (Canada) are the sites of an ongoing three-year government- and industry-funded research program. In order to assess th

    Jan 1, 2003

  • AUSIMM
    Long Tunnel extended Gold Mine, Walhalla-A Recovery and Rehabilitation Project

    By Griffiths J. B

    From its mining lease at the northern end of Cohens Reef at Walhalla in the North Gippsland Mountains, the Long Tunnel Extended Gold Mining Company produced 13,695 kg of gold, which at 1980 prices

    Jan 1, 1981

  • AUSIMM
    Rational Longwall Layout Design Based on Numerical Stress Analysis

    By Klenowski

    Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth

    Jan 1, 1988

  • AUSIMM
    Development of Explosive Monitoring Techniques for Use in Quality Control and Production Blast Analysis

    By Moxon NT, Torrace AC

    The detonation pressure of an explosive is a function of its density and its velocity of detonation (VOD) and relates directly to the degree and manner in which the explosive loads the surrounding r

    Jan 1, 1988