Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Local Resource Development Initiative - Developing a New Project Sustainability Model (Ambatovy Project Case Study)By S Novak
A world-class example of sustainable development in practice, the Local Resource Development Initiative (LRDI) grew from agreements between the Ambatovy nickel mine developers and the Government of Ma
Jan 1, 2009
-
Inclusion of Safescape Laddertube to enhance emergency egress in ventilation shaftsBy B Murphy
Safescape Laddertube provides an improved system for emergency egress in ventilation shafts. The addition of Laddertube in a rise has very little impact on ventilation flow, studies have indicated th
Oct 12, 2022
-
Gold Particle Characteristics in Narrow Vein Deposits - Implications for Evaluation and MetallurgyBy I M. Platten, Y Xie
Narrow vein gold mineralisation generally contains both fine (<100 ¦m) and coarse (>100 ¦m) gold particles. The in situ size and shape, deportment, distribution and abundance of the particles co
Jan 1, 2008
-
Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and DivestmentBy A Keogh, P Allen, P Stoker
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an
Mar 18, 2015
-
The critical role of mine planners in the evolution of closure at BHPBy J Heyes, R Getty, M Sanapala
Closure is an inevitable part of the life cycle of every mine. Successful closure outcomes critically depend upon early and ongoing integration of closure planning and mine planning. Early and holisti
Sep 18, 2023
-
Development of the Presink System for Raise Boring at Xstrata Copper’s Mount Isa Copper OperationsBy G Chitumbura
Raise boring is a critical aspect of mining at Xstrata Copper’s Mount Isa Copper Operations (MICO). MICO’s internal raise boring department regularly develops ventilation rises, orepasses and stope cu
Mar 21, 2011
-
A System of Diluting Methane to Safe LevelsBy R Hughes
"Spring Creek Mine uses high pressure water to extract the thick Main seam in the Upper Rewanuicoal measures. The extraction method results in the creation of large voids which collapsespontaneously.
Jun 1, 2012
-
Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial resultsBy J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome
A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria
Jul 25, 2018
-
The International Network for Acid Prevention (INAP) ù An Overview of ActivitiesBy A-M Fleury
There has been much progress on the issue of acid drainage over the past 20 years; however, significant challenges remain. The International Network for Acid Prevention (INAP) is attempting to address
Jan 1, 2003
-
An Alternative Whole-of-Life Approach to Tailings ManagementBy D J. Williams
Tailings management is typically constrained by many factors that are taken as given. These include the tailings production rate that must be accommodated, the desire to deliver the tailings cheaply a
Jul 16, 2014
-
Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground MineBy L Sandery, S Light
Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w
Mar 24, 2014
-
Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE ConcentratorBy B Murphy, T Mattsson, R Crosbie, T Maksimainen
"An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t
Oct 10, 2016
-
Carrapateena project to date – Geotechnical risks and managementBy G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
Regional Trade-Offs Between Mine Water and Energy Use - A Water Treatment Case StudyBy A Woodley, G Keir
The mining industry faces concurrent pressures of reducing water use, energy consumption and greenhouse gas (GHG) emissions in coming years. However, the interactions between water and energy use, as
Nov 26, 2013
-
A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and ConveyorsBy R M. Krek
The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy
Mar 24, 2014
-
A Review of the Kapit Orebody, Lihir Island Group, Papua New GuineaBy J R. Robinson
Prior to mine development, exploration drilling within the Luise Caldera on Niolam Island encountered gold mineralisation to the northwest of the main Minifie and Lienetz orebodies. This mineralisatio
Jan 1, 2004
-
Upstream Raising of Laterite Nickel Tailings Storage FacilitiesBy D A. Williams, J C. J Boshoff
The properties of tailings that emanate from laterite nickel processing plants are significantly different to most other mine tailings. They typically comprise a mixture of fine materials that are mad
Jul 27, 2015
-
Deformation History and the Formation of Auriferous Quartz Veins in the Warratta and Mount Poole Inliers, Northwestern New South Wales, AustraliaThe Warraua and Mount Poole Inliers form part of a discontinuous series of basement complexes in the northwestern corner of New South Wales. The Inliers comprise mainly clastic sediments of low metamo
Jan 1, 1992
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
Managing Environmental Impact Assessments of Heavy Mineral Projects in Africa ù Potential Pitfalls and Proactive PlanningDetermining the environmental consequences of green field projects is becoming an increasingly important component of new projects. Feasibility studies are regarded by potential investors as incomplet
Jan 1, 2001