Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    The Computer Modelling of Surface Mining Operation

    The Canada Centre for Mineral and Energy Technology (CANMET) /Calgary Coal Research Laboratory and the National Research Council in Ottawa established a joint working research group with industry to d

    Jan 1, 1985

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    Analysis of the Creep Behaviour of Tunnels in Sandstone/Shale

    By J C. Small

    Time-dependent deformation occurs when geo-materials are under an applied load; this may lead to additional deflection of a tunnel structure and the stress redistribution in the surrounding rock, shot

    Jan 1, 2008

  • AUSIMM
    Metal Balance for Olympic Dam Using a Standard Industrial Software Package

    By R Gilbertson, N Freeman

    Metallurgical accounting is key to the control and production planning process of any mining operation. This is even more crucial for complex operations involving mining, concentration, smelting, refi

    Jan 1, 2002

  • AUSIMM
    Environmental Auditing as a Driver for Continuous Improvement in Environmental Performance (ede55e7e-c054-4fc6-ae90-dd762e66d692)

    Continuous improvement in environmental management assists in the achievement of sustainability goals for the mining and processing of minerals. The use of regular internal environmental audits (score

    Jan 1, 2004

  • AUSIMM
    Western Deep Levels South - A Technical Challenge

    By Lloyd F, Bayley F. J

    The new South Mine in the Western Deep Levels complex is destined to become an ultra deep project extending to depths of 4 200 m below surface and where rock temperatures are likely to exceed 65 ¦

    Jan 1, 1988

  • AUSIMM
    Supergene Mining at Elura

    Confirmation of significant mineable reserves of high grade silver ore at Elura Mine has led to the development of a high cost, high recovery mining system. At the contact of oxidised and sulphide

    Jan 1, 1988

  • AUSIMM
    Key technology indicators that will influence mining method selection for future mines

    By S Nowosad, O Langefeld

    The mining industry has undergone a profound and transformative shift in recent years, driven by the rapid advancement of emerging technologies such as automation, digitalisation, and electrification.

    Sep 1, 2024

  • AUSIMM
    Tropical Information System - Its Communications and Applications

    By Stanton G

    The Department of Mapping and Surveying (DMS), the Australian Key Centre in Land Information Studies (AKCLIS), the Department of Industry Development (DID) and the State Government Computer Centre

    Jan 1, 1987

  • AUSIMM
    Methane-INFO - Graphical, Three-Dimensional Planning and Information System for the Simulation and Prediction of the Methane Emission of Mine Design

    By Ruschitzka C

    The productivity and economic success of a German hard coal mine is attributed to the high productivity of a small number of operation points; however high rates of production are associated with in

    Jan 1, 1995

  • AUSIMM
    Computerised Geological Information for Mine Planning at Mt ISA Mine

    Copper grades of diamond drill hole and development samples are determined in the core shed logging area at Mount Isa Mine using a Bulk Mineral Analyser. All geological and grade data on the copper or

    Jan 1, 1985

  • AUSIMM
    Selection and Evaluation of Tunnel Excavation Methods for Heterogeneous Grounds

    By Tagawa H

    In Japan, geological condition do not only vary in a wide range of strata but are also extremely complex with the existence of faults and aquifers. With respect to rocks, in particular, it is very

    Jan 1, 1987

  • AUSIMM
    Intragraben Fault Zones, Volcanism, and Geothermal Evolution in the Oregon-Idaho Graben, U.S.A. (cb62322a-c63b-484d-a72f-a99e158b5dcc)

    The Oregon-Idaho graben evolved after widespread Uwleiitic flood basalt volcanism associated with the arrival of the plume head of the Yellowstone hotspot beneath southeastern Oregon approximately 17

    Jan 1, 1995

  • AUSIMM
    The Application of Phase Equilibrium Studies to the Characterisation of Zinc and Lead Blast Furnance Sinters

    By Nairin J. D, Hayes P. C

    Detailed studies of the microstructures and compositions of zinc and lead blast furnace sinters have been undertaken. An analysis of the results obtained has indicated that in many cases the microst

    Jan 1, 1992

  • AUSIMM
    New Shotcreting for Ground Support of TBM Tunnelling

    By Takeuchi T, Matsugaki K

    We have developed a new shotcreting which is suitable for the primary support of TBM tun- nelling in soft rock. This spraying compound is made from cement, a special accelerating agent and glass fib

    Jan 1, 1987

  • AUSIMM
    Aspects of Alluvial Gold Exploration

    Alluvial gold exploration is aimed at recognizing areas of anomalous gold content as evidenced by the nature of the drainage system, its age, geomorphic history and other features of the geological en

    Jan 1, 1984

  • AUSIMM
    Recent Developments and Investigations of D.M. Cyclone Coal Preparations at the BHP Port Kemble Washeries

    By Nightingale R, Johnson B, Bensley C, Vince A, Keast-Jones R

    In order to counter the massive increase in the level of near gravity material that would follow the reduction in dense-medium cyclone separation density at B.H.P. Slab and Plate Product Division&

    Jan 1, 1987