Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    Grade Control Sampling and Ore Blocking: Optimisation Based on Conditional Simulation

    By Khosrowshahi S

    The objectives of grade control remain unchanged but new methods are being developed to attain them. Since the early-1990s, an improvement in the power of mine site computers has made the geostatist

    Jan 1, 1997

  • AUSIMM
    Designing and Operating Heap Leaching Processes with Both Eyes Open

    Process engineering principles are used to analyse the features of leaching processes for large masses of low grade, unprocessed ore. Different performance characteristics are related to the numerou

    Jan 1, 1994

  • AUSIMM
    Improving the Reliability of Stream Diversion Designs in Mine Closure Plans Using a Morphological Tool

    By S Tjerry, S Szylkarski, B Willis-Jones, I Dubinski

    Achieving relinquishment of mining sites is becoming increasingly difficult, with a study by Byrne (2013) estimating that out of a set of 73 mining and metals sites around the world, less than ten per

    Jun 28, 2016

  • AUSIMM
    Profitability, Sustainability and Community Development - Is There a Contradiction? A Case of Gold Fields' Driefontein Gold Mine in South Africa

    Since the days of Adam Smith and Milton Friedman the discussion of corporate citizenship and sustainability has been flooded with multiple contradictions, with proponents of sustainability saying that

    Jan 1, 2009

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AUSIMM
    Note on a Method of Microscopic Examination of Victorian Brown Coals

    This work was instituted to investigate the microscopic structure of brown coals by means of microtome sections cut from them. It was found to be essential to impregnate the coal with some material pr

    Jan 1, 1947

  • AUSIMM
    Improving Quality Assurance and Quality Control Practices - Basic Methodology Using Worked Examples

    By P Stoker

    The need for quality assurance and quality control (QA/QC) in the sampling and assaying of minerals is fundamental to the reliability and confidence of a mineral resource estimate, reserve estimate an

    Jan 1, 2009

  • AUSIMM
    Who does the Marketing in the Race for Space?

    This paper has been developed for æThe Race for SpaceÆ conference. It ranges over various aspects, all of which are within the umbrella of marketing. The question is posed because many engineers, tunn

    Jan 1, 1999

  • AUSIMM
    Development of an empirical geo-metallurgical model that unlocks value of the mineral resources at Yandi Mine

    By P Gilroy

    In recent technical investigations that were triggered from ore for rail shortfalls at Yandi, BHP Iron ore has identified a gap in resource knowledge relating to geo-metallurgical characteristics that

    Nov 21, 2018

  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    Queensland Nickel - Value-Added Products from Technological Advances (c558ef59-3d56-447f-a7ad-fc4833bf589d)

    The Yabulu refinery of Queensland Nickel Pty Lld near Townsville now imports more than three million wet tonnes per year of nickel laterite ore from New Caledonia and Indonesia, making it the largest

    Jan 1, 1995

  • AUSIMM
    Methane Drainage Investigation as a Method of Control of Outbursts at West Cliff Colliery

    By Griffiths L, Marshall P

    fhis paper describes investigations into drainage of gas from the solid to control outbursts. Initial studies conducted on drainage of shear zones showed that, given enough time, these can be succ

    Jan 1, 1980

  • AUSIMM
    Mining and Handling of Nauru Phosphate Rock

    Nauru Phosphate, which is one of the world's highest grade deposits discovered to date, contributed in 1969, 2.2 million tons of the total world production of 77.7 million tons. Phosphate produ

    Jan 1, 1971

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • AUSIMM
    Review of Static and Seismic Stability of a Cross-valley Sand Tailings Embankment in a High-rainfall, High-seismicity Setting

    By B P. Wrench, M J. Gowan, P J. Chapman

    Embankment dams constructed mainly of sand or non-plastic fine soils are susceptible to liquefaction, particularly in high-rainfall, high-seismicity environments where there is sufficient water to sat

    Jul 27, 2015

  • AUSIMM
    Stability of Hydraulic Backfill Barricades

    Hydraulic backfill is generally retained in stopes using permeable barricades. Mitchell et al (1975), Mitchell (1992) and Grice (1989) have shown that under normal drainage conditions, barricades expe

    Jan 1, 1998

  • AUSIMM
    The Evolution of Stope Backfill at Olympic Dam Operations

    Backfil ling of excavated Sub Level Open Stopes has been underway since March 1989 and as at December 1992 some 1 100 000 cubic metres of Cemented Aggregate Fill have been placed. During these three y

    Jan 1, 1993

  • AUSIMM
    Scenario Thinking - A Powerful Tool for Strategic Planning and Evaluation of Mining Projects and Operations

    By G Nicholas, S Coward, J Vann, R Wolff, S Jackson, S Moayer, A Bye

    "A new approach to mineral project evaluation is described called Scenario-Based Project Evaluation (SBPE). SBPE incorporates well established æscenario planningÆ and æscenario thinkingÆ approaches, w

    May 24, 2012

  • AUSIMM
    Bored Reinforced Piles for Raise Bore Support – Four Case Studies and Guidelines Developed from Lessons Learnt

    By P Marlow

    Raiseboring is an attractive method of constructing shafts, being safe, fast and comparatively cheap. But this means back-reaming through weathered ground. However in the gravels and weathered near-su

    Mar 21, 2011