Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • AUSIMM
    Geotechnical Factors Affecting the Surface Placement of Process Tailings in Paste Form

    By D J. A Van Zyl, J C. Cunning

    Technological advances associated with the expanded application of paste technology in underground mine backfilling are now stimulating an interest in the disposal of process tailings as paste in the

    Jan 1, 1998

  • AUSIMM
    Enhance Fine Particle Flotation by Hydrodynamic Cavitation

    Enhance Fine Particle Flotation by Hydrodynamic Cavitation Difficulties in fine particle flotation are well documented. Microbubble flotation has been found to greatly improve the recovery of fine pa

    Sep 13, 2010

  • AUSIMM
    Modelling of Multiple Narrow Veins from Geology to Mining - the Tasmania Reef, Beaconsfield, Tasmania

    By P B. Hills

    This paper discusses the computerisation of the drill hole database, some historical records and the creation of a three-dimensional model of the gold bearing structures for resource estimation and mi

    Jan 1, 1999

  • AUSIMM
    A Double Drum Separator for Triboelectric Separation of Very Fine Materials

    By K Schonert, K Eichas

    Electrostatic separation of non-conductive materials can be accomplished by triboelectric charging. The efficiency of convential separators becomes worse in the size range below about 100 ¦m. These

    Jan 1, 1993

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • AUSIMM
    The Hydrogeochemical Characterisation of an Unsaturated Waste Rock Pile, Key Lake, Saskatchewan, Canada

    By L Smith, R Beckie

    Controls on environmental loading from acid rock drainage (ARD) are not well understood in waste rock material. In particular, relationships between subsurface flow and the timing, duration, and inten

    Jan 1, 2003

  • AUSIMM
    Effect of calcium oxalate CaC2O4.H2O on the Reduction and phosphorus partition of a high-P Brockman ore

    By S Hapugoda, H Han, L Lu

    Charcoal produced from Syzygium Zeylanicum trees was widely used in ancient Sri Lankan iron smelting practices. Charcoal made from Syzygium Zeylanicum tree trunks, branches and leaves were analysed by

    Sep 18, 2023

  • AUSIMM
    Storys Creek Remediation Program

    By J Miedecke

    A metalliferous mine has operated at Storys Creek from the 1890s to 1979. Storys Creek drains from a pristine catchment and National Park and remains as the most degraded stream from historic mining i

    Jan 1, 2003

  • AUSIMM
    The Acid Drainage Technology Initiative ù An Evolving Partnership

    The Acid Drainage Technology Initiative (ADTI) was initiated in 1995 by federal agencies, the National Mining Association (NMA) and the Interstate Mining Compact Commission (IMCC) to identify, evaluat

    Jan 1, 2003

  • AUSIMM
    Final Pit Wall Stability ù Understanding Crest Loss Mechanisms and Possible Solutions to Block Movement

    By K McSweeney, A Marton

    This paper discusses the development of a strategy for ensuring long-term geotechnical stability of final pit walls at AngloGold AustraliaÆs Sunrise Dam Gold Mine. The strategy makes use of improved b

    Jan 1, 2004

  • AUSIMM
    Mine productivity and equipment selection impacts with operational grade engineering

    By A F. von Wielligh, M Scott, L Keeney

    Operational Grade Engineering (GE) is the early (pre-processing) discard of low-grade mineralised and/or barren rock to improve the ore grade and/or reduce deleterious elements within the run of mine

    Nov 10, 2020

  • AUSIMM
    Seismic Hazard Assessment at Junction Gold Mine

    By M Henderson, M Hudyma

    Mining-induced seismicity at Junction Gold Mine became a serious operational problem in the late-1990s. Assessing the local seismic hazard is an important step in assessing the risk associated with po

    Jan 1, 2002

  • AUSIMM
    Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting Systems

    By B Crowdey, J Wall

    The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react

    Mar 24, 2014

  • AUSIMM
    Critical state soil mechanics in filtered TSF design

    By J Rola

    This paper outlines a laboratory-based design method, founded in critical state soil mechanics, for identification of an appropriate compaction specification to ensure dilative conditions prevail acro

    Jul 1, 2021

  • AUSIMM
    In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure

    By D J. Robinson, L L. Kuhar

    "Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to

    Nov 15, 2016

  • AUSIMM
    Outside the Dyke Bulge - The A1 Gold Mine Extension, Gaffneys Creek, Victoria

    By D J. Clark, R F. Wright, M D. Goodz

    The A1 Gold Mine is a Devonian-age narrow vein high-grade gold deposit located 115 km east of Melbourne. The mine operated almost continuously from 1861 to 1992 producing 442 334 ounces of gold (13.8

    Jan 1, 2009

  • AUSIMM
    QAQC – proactive Quality Management (QM) supporting reconciliation results

    By O Dominguez

    Significant value can be added to ore supplied from the mine to the mill by measuring its quality in real time and performing grade control additional to that within the mine. Responsibility for ore q

    Mar 22, 2022

  • AUSIMM
    Driving Mine Performance through Communication

    By S Jeffrey, S Mundell, F Arboleda

    In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr

    Jun 22, 2016

  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015