Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Application of Pile Theory to Ground Support Design

    By Best R, Poulos H

    This paper discusses the results of an Australian Coal Association Research Program project into the development of a routine analytical design method for roof support in underground mines. Simple d

    Jan 1, 1995

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    In-Pit Crushing and Conveying Bench Operations

    By T Atchison

    In-pit crushing and conveying (IPCC) systems have come under growing scrutiny as a perceived mitigation to fuel and equipment price fluctuations, labour shortages and the need to move everincreasing v

    Jul 11, 2011

  • AUSIMM
    Innovative Use of Screw Press Filtration in Tailings Dewatering Plant Design

    By D Nieuwkerk, V J. Absolon

    "Screw press technology is an innovative approach to tackling the growing pressure to conserve water and minimise the environmental impact of mineral tailings disposal. The principles of the technolog

    Sep 1, 2014

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    Cover System Performance Monitoring for Tailings – Are We Doing It Correctly?

    By R Barritt, P Scott

    Across the globe, it is a common scenario that tailings storage facilities (TSFs) are being decommissioned; however, their subsequent impact on the local environment and landscape can often be overloo

    Jul 27, 2015

  • AUSIMM
    Reconciliation of Orebody Model Predictions – System and People

    By T Burns, P Savory

    In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data

    Aug 18, 2014

  • AUSIMM
    Trigger Action Response Plans for Diesel Exhaust Exposures

    By J Jeffery, P G. Knott, F Velge, C Evans

    A trigger action response plan (TARP) provides a structured response to escalating levels of risk. In mining, TARPs are typically applied to primary hazards such as inrush, strata failure or heating.

    Aug 31, 2015

  • AUSIMM
    Fundamentally Transforming the Economic and Sustainability Signature of Mining Assets

    By M Jones

    The past 100 years the mining industry can be characterised by a focus on increasing financial returns often to the detriment of social, human, manufactured and environmental capitals. Despite the sus

    Nov 4, 2015

  • AUSIMM
    Frasers Underground - From Technical Study to Production

    Oceana Gold CorporationÆs (OGC) Frasers underground (FRUG) transitioned into production in early 2008. The mine uses a relatively unique yielding pillars mining method that takes its lessons from empi

    Jan 1, 2009

  • AUSIMM
    Simulation Aided Engineering – Integration of Monitoring, Modelling and Planning

    By D Beck

    Open access to forecasts of mine geotechnical performance in the form of open databases of model results has been considered risky in the past, with a concern that the results will not be understood o

    Mar 21, 2011

  • AUSIMM
    Optimising flotation plant operation by using a digital twin in the control room

    By R Tooher, S J. Oliver

    The operation of copper flotation circuit is a challenging task for the site metallurgists and plant operators. To optimise the performance requires meeting both grade and recovery objectives. These p

    Aug 29, 2018

  • AUSIMM
    Incorporating the true costs and opportunities of rehabilitation and closure in project selection, design and approvals

    By C Tomlin, C Gimber

    Historically, key closure risks have been studied during operations and then further assessed as cessation of mining approaches. Only in the past couple of decades or so has progressive rehabilitation

    Aug 2, 2023

  • AUSIMM
    Two Companies, Three Years, Four Sites, Five Managers and Six Projects in the Life of à

    Leaving the relatively simple life on a uni student and venturing off in to the outside working world is a big step. There are two paths to follow, the æContikiÆ style graduate program where you pick

    Jan 1, 2004

  • AUSIMM
    Geotechnical Management at the AGL Loy Yang Mine

    By S Cyphers, J Missen, B Jansen

    The AGL Loy Yang Mine is one of the largest and most significant coalmines in Australia. Commencing in 1982, this mine produces 30–35 Mt/a to supply more than 50 per cent of Victoria’s electrical powe

    Nov 5, 2014

  • AUSIMM
    The Impact of Gravity Gold Recovery at Kalgoorlie Consolidated Gold Mines

    By D Hillier, A Giblett, K Parker, V Ramsell

    Kalgoorlie Consolidation Gold Mines (KCGM) operates the Kalgoorlie Super Pit open cut, Mt Charlotte underground mine, Fimiston process plant and Gidji Roaster facility for joint venture partners Newmo

    Oct 29, 2012

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    The North Strathfield Rail Underpass – Driven Tunnel Design and Construction

    By E Nye and T Schroeter, B Muir, M Kitson, M Gonzalez, D Mares

    The single track North Strathfield Rail Underpass (NSRU) consists of a dive structure either end of a 148 m long driven tunnel skewed under three live railway tracks. The tunnel is 8 m high, 9 m wide,

    Sep 17, 2014

  • AUSIMM
    Estimating Comminution Indices from Ore Mineralogy, Chemistry and Drill Core Logging

    By R Berry, J Hunt, T Kojovic

    Geometallurgy aids the understanding of orebody variability through the integration of geological and processing information, thereby enabling spatial mapping of processing (eg comminution or separati

    Sep 29, 2013