Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Is a 2.5áper cent Success Rate Good Enough? Traditional Mine Development Methods have the Tail Wagging the Dog

    By J Jackson, D C. Curry, A C. Keith

    Australian Bureau of Statistics (ABS) data shows that since 2006 the balance of capital costs associated with mine development has become weighted greater than 75 per cent to enabling infrastructure a

    Sep 29, 2013

  • AUSIMM
    Development and Application of a Holistic Quantitative Deterministic Technique for Risk Modelling (Quadrim) in Mine Valuation

    In this paper a quantitative deterministic risk modelling approach (Quadrim) is introduced. The mathematical framework and equations for quantifying uncertainty within and aggregating across value cha

    Sep 26, 2011

  • AUSIMM
    From Green Field Site to Block Cave Mine - Results of Northparke's Drill and Blast Design Process

    The green field site is one that has no history of mining and as such it presents the designer with a blank canvas, on which any number of drill and blasting options can be drafted. No matter which mi

    Jan 1, 1998

  • AUSIMM
    A review of the most common underground slot, winze, rise or raise designs

    By E Wargem

    The conventional method of underground mining involves a process known as drilling and blasting to excavate valuable ore bearing minerals through the load and haul process. Drilling and blasting proce

    Mar 29, 2023

  • AUSIMM
    Implementation Strategies for Energy Effectiveness and Sustainability – Example of Anglo American Platinum

    By O Bascur, A Soudek

    Large metallurgical complexes are substantial users of energy, water and assets. To improve the effectiveness of energy and assets the quality of the data and events become paramount for real-time ope

    Sep 1, 2014

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Glencore Mount Isa lead zinc flotation circuit – experiences from the implementation of model predictive control

    By A Price, D Okle, K Brooks

    The operation of flotation plants has been improved over the years by use of fundamentally based design techniques, a better understanding of reagent chemistry, online metal analysis and the use of di

    Aug 29, 2018

  • AUSIMM
    Working in Metallurgy Research

    When studying minerals degrees at university, all the emphasis is towards sending the graduates into the bush to work at a remote mine; however, that is not the only option available to new graduates.

    Jan 1, 2006

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    Open Cut Mine Machinery Automation – Going Beyond Global Navigation Satellite System with Locata

    By C Rizos

    Many of the ‘new paradigms in mining’ and notions of ‘sustainable mining’ have at their core the requirement for reliable, continuous centimetre-level positioning accuracy to enable increased automati

    Nov 22, 2011

  • AUSIMM
    Who is Responsible for Grade? – An Evaluation of the Value Chain at Mt Magnet Gold Project, Western Australia

    By A Weeks, W J. Shaw, A Kuk

    Grade control is a process that requires the interaction between many components of the mining operation and successful grade control is only realised through good data, robust systems, and a well-tra

    Aug 18, 2014

  • AUSIMM
    Opportunities for Partnerships in Contract Mining

    The underground mining of a narrow vein hard rock orebody is a capital and labour intensive method of extraction. Due to the nature of underground mining it is difficult for higher level managers to p

    Jan 1, 2006

  • AUSIMM
    Management of Health and Safety in Tunnelling – Application of Australian Coal Mining Knowledge

    By G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch

    Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a

    Sep 17, 2014

  • AUSIMM
    The Deep Parts of the Kiirunavaara Apatite-Magnetite Orebody in Kiruna, Northern Sweden and the Impact of Future Mining on the Township of Kiruna

    The Kiirunavaara apatite-magnetite orebody is about 4 km long and approximately 100 m thick sheet-like body, which lies roughly in a north-south direction and dips from the horizontal plane along its

    Jan 1, 2006

  • AUSIMM
    Improving dust management in gate road development – a computational fluid dynamics-virtual reality based training tool for mine workforce

    By M Qiao, A Sugden, W Zong, J Hines, J Roberts, T Ren

    Long-term exposure to respirable dust continues to present an occupational health and safety hazard to mine workers in underground mines. Workers who are exposed to mine dust can develop occupational

    Apr 16, 2024

  • AUSIMM
    Resource Company Investments in Health – A Life-of-Mine / Life-of-Community Perspective across America

    By A Calderon, J Harris, M Shi, D Viswanathan, C Ribeiro Duthie, P A. Kirsch

    Mineral resource development activities impact the health and well-being of many people, from workers, to families and surrounding communities. In the current environment of corporate social responsib

    Jul 16, 2014