Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A geometallurgical approach towards the correlation between rock type mineralogy and grindability – a case study in the Aitik mine, SwedenBy R Schmitt, Y Ghorbani, I McElroy, N J. Bolin, M Parian
Aitik is a large copper porphyry type deposit located in northern Sweden, currently exploited at an annual rate of approximately 45 Mt. The ore’s exceptionally low head grade of 0.25 per cent Cu and v
Aug 24, 2022
-
"Sampling and Test Work Protocol Development for Geometallurgical Characterisation of a Sheeted Vein Gold Deposit"By Y Xie, L O’Connor, S C. Dominy
"Sheeted vein gold deposits are characterised by multiple subparallel veins and free milling gold. In situ heterogeneity of mineralisation results in grade and process parameter variability, which wil
Jun 15, 2016
-
Digital imaging provides valuable insights into underground development miningBy P Klaric, N Swart, S Barnes
The recent advances in digital imaging technology, specifically around photogrammetry, have facilitated precision measurement in the difficult conditions encountered in an underground development mini
Oct 16, 2017
-
True Pipe Sampler – A Correct Design Utilising the Principle of Symmetry in Pressurised Slurry Particulate StreamsBy G J. Halstead, R C. Steinhaus
The True Pipe® in-line sampler was developed in an attempt to address the need for a mechanically reliable and correctly designed sampler to suit one-dimensional pressurised slurry pipelines, often fo
Jul 29, 2014
-
Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 1By N Clarke, J Hunt, A Barros, L Keeney
The Gramalote orebody is a large low-grade gold deposit situated in the San Roque municipality, 124 km north-east of Medellin in Antioquia, Colombia. It is jointly owned by AngloGold Ashanti (AGA) and
Nov 10, 2020
-
Operational Management of Underground In-Seam Drilling SitesBy ZáWang, F Hungerford, T Ren
Operations in an underground drill site have to co-exist within the mineÆs ventilation and operational system. The space requirements of a drilling operation have to be adapted to the limitations prov
Jul 1, 2013
-
Managing high volume water inflows of 300 L/s in the planning and development of a large scale underground Gold Mine – the Didipio storyBy J P. Evert
Didipio gold-copper mine operation is situated in the island of Luzon, approximately 270 km north of Manila in the Philippines, in an area of high seasonal rainfall. The hydrogeological water flow mod
Mar 29, 2023
-
Solving the Problems of Precharging Sublevel Caving Rings at Ridgeway Gold MineBy P Trout, B Macaulay
Ridgeway Gold Mine (RGM) is an underground sublevel caving (SLC) operation that is owned and managed by Newcrest Mining Limited (NML). Production drill and blast practices are critical to the success
Jan 1, 2005
-
Geology, Mineralisation and Potential of the Clogau St DavidÆs Mine, Dolgellau Gold-Belt, Gwynedd, WalesBy I M. Platten, S C. Dominy
The Clogau St DavidÆs gold mine has a recorded production of around 81 000 oz Au and it is the largest mine in the Dolgellau gold-belt and BritainÆs most prolific historical producer. The original min
Mar 26, 2012
-
Practical measures of process efficiency and opportunityBy G R. Ballantyne, A N. Mainza, M S. Powell, M Evertsson
Quantifying the performance of a comminution circuit relative to the potential that can be achieved is a standard requirement in justifying operating practice (the stick) and seeking operational upsid
Aug 24, 2022
-
Protection of Sacred Sites in the Northern TerritoryThe role and policies of the Aboriginal Sacred Sites Protection Authority are described in conjunction with the provisions of the N.T Aboriginal Sacred Sites Act 1978. Comment is made on the appli
Jan 1, 1984
-
PC-BC: A Block Cave Design and Draw Control SystemThis paper presents an overview of a program PC-BC developed for application to the design and evaluation of block cave operations. Conventional mine planning software tools are not well suited to the
Jan 1, 2000
-
Development of a rail-running pipe conveyor for the iron ore industryBy M Carr, C Wheeler, M Lurie, B Chen
The demand for steel products in modern society is prompting the iron ore industry to optimise their operations to ensure sustainability of fines and lump products. One of the key components in the ir
Nov 8, 2021
-
The Superpit Schedule Model – A Time-efficient Data-driven Estimation for Short- and Medium-term PlanningBy T Berryman, C Adams, L Griesel, C Buxton
The Kalgoorlie Consolidated Gold Mines (KCGM) schedule model is used for short- to medium-term planning and scheduling at the Fimiston Open Pit Mine (the Superpit). The model bridges the gap between g
Aug 18, 2014
-
Integrating Community-Level Indicators of Well-Being into Future Collaborative Mine PlanningBy J Shandro
This paper stems from recent multidisciplinary research between mining engineering and health researchers at the University of British Columbia and the University of Victoria, Canada. It considers the
Nov 22, 2011
-
Managing the Margin at Norseman, Western Australia – A Case StudyBy B P. Micke
Central Norseman Gold Corporation was established in 1935 and has been mining on the Norseman field in Western Australia since then. It is Australia’s longest continuously operating gold mining operat
Mar 24, 2014
-
Reducing Crest Loss at Barrick Cowal Gold MineBy R Battison, R Duggan, S Esen, K Henley, P Dare-Bryan
Increased catch bench crest loss has been observed in recent years at Barrick’s Cowal Gold Mine situated in central New South Wales, Australia. A project was initiated to diagnose the cause of the cre
Aug 24, 2015
-
Reducing the Effect of Wind on Airblast Measurement During BlastingBy K Henley
One of the greatest practical difficulties of measuring airblast occurs when a significant wind is blowing onto the microphone. Small windscreens are usually used to mitigate the wind noise on the mic
Aug 24, 2015
-
A Historical Review of the Treatment of Preg-Robbing Gold Ores - What has Worked and ChangedBy K Afewu, R Dunne, W P. Staunton
The treatment of preg-robbing gold ores has always been a technical challenge in the gold industry. Early solutions included removal of preg-robbing carbonaceous material by flotation, the addition of
Sep 26, 2013
-
Quantifying Geotechnical Risk in the Mine Planning ProcessBy T P. Medhurst
In many cases mine design is the most important driver of the profitability of a mining project, however to reach an æoptimumÆ mine plan many compromises have to be made. Some of the fundamental profi
Jan 1, 2000