Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Selection of Mine Water Management Options Considering both Water and Energy ImpactsBy M T. Nguyen, S Vink, M Ziemski
On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf
Nov 26, 2013
-
Ventilation considerations and modelling of lithium battery fires inunderground miningBy C M. Stewart
Lithium battery electric powered vehicles and machines (BEVs) continue to gain traction inunderground mining use, with predictions they will dominate the underground light and heavy vehicle fleets for
Oct 12, 2022
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case studyBy P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
Practical Considerations when using Auxiliary Axial Flow Fans as a Primary Mine FanBy D Roughsedge, J van der Sandt, L van den Berg
Axial flow fans are commonly used as auxiliary fans in underground mines to supply air to development headings. As diesel dilution requirements increase the fans used in conjunction with ventilation b
Jul 1, 2013
-
Underground Footwall Monitoring at the Sublevel Caving Mine – Kiirunavaara, SwedenBy M Svartsjaern, D Saiang and K Mäkitaavola
The Kiirunavaara mine is a large-scale (28 Mt/a) iron ore mine located in northern Sweden. The mine is owned and operated by Luossavaara-Kiirunavaara Aktiebolag (LKAB) using sublevel caving (SLC). The
May 9, 2016
-
Autonomous Haul System Savings – It’s Not about Less Truckies but Better Truckies!By R Price, B H. Miller
"The rise of autonomous haul truck fleets may have been initially driven by the rapid escalation of the cost of equipment operators, but the actual improvements reported by the major iron ore miners f
Nov 15, 2016
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
The Influence of Liner Wear on Milling EfficiencyBy P Toor
Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in
Aug 8, 2011
-
Transfer Function – New Method to Accurately Predict Resonant Frequencies of a HighwallBy R Osterman
As mining companies have to go deeper in search of ore and coal, the importance of protecting the highwall increases. Wall fatigue also increases with importance of the long life expectancy of a highw
Aug 24, 2015
-
Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore DepositsBy A Melkumyan, K Silversides
The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.
Nov 24, 2014
-
Beyond NPV - A Review of Valuation Methodologies and Their Applicability to Water in MiningBy D Brereton, C J. Moran
In this era of rising focus on the social and environmental costs and benefits of mining operations, the valuation methodologies used to assess such impacts become increasingly important. Within an in
Jan 1, 2006
-
Mine Shafts – Planning, Optimising and ConstructingBy D J. Kilkenny
Work practices involved in shaft construction can be aligned with current industry standard operating practices. However, the working environment during conventional shaft construction introduces uniq
Mar 21, 2011
-
Development and permitting of an underground mine at Cowal Gold OperationsBy J Northfield, L Neesham
The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri
Mar 15, 2021
-
Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central QueenslandBy K White, R Hardie, J Merritt, B Kirsch, R Lucas
Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res
Nov 26, 2013
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
Multiphysics modelling and virtual motion simulation to optimise mining systems in extreme conditions – insights from Mars Science Laboratory (MSL) Curiosity RoverBy S Padekar, C Tapia, D Likhachev, S Harlikar, D Sapkale
In the quest to access valuable critical minerals, humankind is expanding the frontier into extreme environments like space and deep-sea mining. These ambitious enterprises involve considerable costs
Sep 1, 2024
-
Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, FinlandOptimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland
Sep 13, 2010
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Flotation Optimisation Studies of the Perilya Broken Hill Lead CircuitBy B Kilgariff
Flotation has been in use at Broken Hill for nearly 100 years, and the process has gone through many different optimisation studies over that time. This paper reviews the current flotation practice at
Jan 1, 2005
-
Computational density functional theory study of triazine adsorption on sperrylite (100) surfaceBy X Zhang, B McFadzean, P E. Ngoepe, B Nemutudi, P P. Mkhonto, S Pikinini
There is still a huge challenge in efficiently recovering the arsenides minerals that are largely concentrated in the Platreef Bushveld Complex which constitutes about 21 per cent of the platinum grou
Aug 24, 2022