Search Documents

  • SME
    Monitoring Subsidence In The West: Problems And Analysis

    By John E. Rourke, O&apos

    This paper describes some of the results of a project for the design and demonstration of subsidence monitoring systems for underground coal mines. The project was designed to test monitoring systems

    Jan 1, 1982

  • AUSIMM
    Design and Operation of a Counter Current Gas Scrubbing System

    For many years the scrubbing of roaster gas carrying sulphur dioxide has been carried out at the plant of the Electrolytic Zinc Co. of Australasia Ltd. at Risdon, Tasmania, using long horizontal tubes

    Jan 1, 1949

  • SME
    New York Subway Stations And Crossover Caverns—Update On Initial Support Design

    By Charles Stone, Hannes Lagger, Dru Desai

    The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car

    Jan 1, 2007

  • CIM
    Selecting the Correct Cyanide Destruction Process for Your Operation

    By R. Agius, A. Nacu

    "Adoption of the International Cyanide Management Code, regulatory requirements and community concerns have increased the need to implement suitable cyanide destruction processes at gold operations to

    Jan 1, 2017

  • AUSIMM
    Mettalurgical evaluation of iron ore drum separators using density tracers

    By Lyman G. J

    Dense medium drum separator efficiency was analysed at two Western Australian iron ore concentrators. Efficiency data had hitherto been difficult to accumulate due to the high cost of analysing repres

    Jan 1, 1987

  • AUSIMM
    Copper Waste Dump Leaching

    Copper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr

    Jan 1, 1967

  • AUSIMM
    Hydrological Environments for Vein Mineralisation in the Hauraki Goldfield, New Zealand

    The epithermal Au-Ag deposits of the Hauraki Goldfield have formed in the convergent plate margin setting of the Coromandel Volcanic Zone (CVZ). The deposits form as siliceous lodes in the upper parts

    Jan 1, 1991

  • AUSIMM
    Removal of Arsenic in Fluorite Ore by Simultaneous Grinding-Leaching with NaHS

    Removal of Arsenic in Fluorite Ore by Simultaneous Grinding-Leaching with NaHS Generally speaking, a high-grade fluorite ore is converted into hydrogen fluoride (HF), which is essential for the semic

    Sep 13, 2010

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • CIM
    Designing Science Based Effluent Permits for the Mining Industry

    The goal of this presentation is to firstly, review mine effluent permits in a number of regulatory jurisdictions; and secondly, to develop a strategy for incorporating the regulatory requirements int

    Aug 1, 2013

  • CIM
    Uppers drilling for mechanized cut-and-fill stoping at Brunswick Mining and Smelting No. 12 Mine

    By R. W. Baker

    "The development of uppers drilling at Brunswick Mining is reviewed. This paper describes design criteria for drilling patterns and the research required for selection of a suitable drill jumbo. The s

    Jan 1, 1988

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • AUSIMM
    Migration of Gold During Boring

    The following data cover a phase in the systematic testing of gold deposits which does not appear to have been specificalIy investigated.In boring either secondary or primary deposits, gold, by virtue

    Jan 1, 1950

  • ABM
    AVALIAÇÃO DE MICRODUREZA DE LIGAS Hf–Si–B

    By João Carlos Jânio Gigolotti

    O avanço tecnológico tem gerado demanda crescente por materiais que possam ser utilizados em alta temperatura e ambientes oxidantes, o que inclui ligas intermetálicas MR–Si–B (MR = metal refratário) c

    Aug 17, 2017

  • ISEE
    Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study

    By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody

    Nowadays, with such a focus on environmental protection, surface mining activities have come under pressure to ensure their activities do not adversely affect the local surroundings. As part of the ex

  • AUSIMM
    High Grade Metamorphic Structures in the Broken Hill Orebody

    The Broken Hill orebody ,occurs in the Willyama Complex, a block of Precambrian rocks which have been strongly folded and metamorphosed at moderate to high grade. Although -the origin of the silver-le

    Jan 1, 1975

  • AUSIMM
    The Aluminium Smelter at Tiwai Point

    My speech this morning is not a technical one, rather I will aim to tell you about the New Zealand Aluminium Smelters Limited and how I see it fitting into the Western World aluminium scene.

    Jan 1, 1983

  • AUSIMM
    Flotation Circuit Optimisation - Towards More Sustainable Practice

    Flotation Circuit Optimisation - Towards More Sustainable Practice

    Sep 13, 2010

  • DFI
    Full-Scale Field-Test Studies On Driveability And Induced Ground Vibrations Of Vibratory Driven Sheet Piles

    By K. Viking

    The vibratory characteristics of full-scale sheet piles, vibratory driven into the ground, have so far not been described systematically in detail. This paper concerns the preliminary results of a ser

    Jan 1, 2000

  • NIOSH
    IC 9239 Multislice Mining For Thick Western Coal Seams

    By T. D. Hackett

    Multislice mining methods were analyzed by the U.S. Bureau of Mines to determine their application to western United States thick coal seams; ground control, geology, and costs were considered. Multis

    Jan 1, 1990