Search Documents

  • AUSIMM
    Performance Evaluation of Machinery used in Dimensional Stone Mining and Processing

    Nowadays, technology has improved to extract dimensional stone blocks at quarry sites and also to process these at processing plants for making slabs and tiles. In the process of quarrying and process

    Dec 6, 2010

  • AUSIMM
    Base Metals from Flue Dust Leach Liquor Using Ion Exchange

    Flue dust from the sintering of base metal sulphides was leached to remove cadmium and arsenic. Leach liquor contained cadmium, zinc and small amounts of other base metals as chlorides. Results are re

    Jan 1, 1960

  • SME
    Stability Analysis For Steep-Slope Mines Reclaimed Using The Forestry Reclamantion Approach

    The Forestry Reclamation Approach (FRA) specifies that the upper 1.22 m of material on the reclaimed surface should be left as uncompacted as possible to facilitate tree root growth. One of the main c

    Feb 27, 2013

  • AUSIMM
    Some of Features of Lead Blast-Furnace Opeartions at the Works of the Broken Hill Associated Smelters Proprietary Limited, Port Pirie, S.A.

    IN this paper it is proposed to present certain features of operating practice at the Port Pirie works of The Broken Hill Associated Smelters Proprietary Limited, in the smelting in a blast furnace of

    Jan 1, 1931

  • CIM
    Mining Methods and Costs at the Josephine Mine

    By Alan E. Gallie

    One of the requirements for the successful waging of war is an unlimited supply of iron ore. In the spring of 1941 the demand for iron ore was expected to exceed the supply. This was particularly so i

    Jan 1, 1947

  • DFI
    Peak And Post-Peak Shear Strength Of Cement-Bentonite

    By Paul J. Axtell

    Self-hardening cement-bentontie (c-b) slurry walls were constructed as shear walls to stabilize the downstream slope of Tuttle Creek Dam near Manhattan, Kansas. The slope stabilization was required t

    Jan 1, 2010

  • ISEE
    Analysis of Rock Fragmentation by Blasting Using Combined CFD/FEZ/DEM Models

    By Alejandro Ferrada Vergara, Héctor Espinoza Muñoz

    Drilling and blasting stages are considered factors that impact downstream processes significantly and over all the mining business value chain. Adequate control of these processes may represent energ

    Jan 1, 2016

  • CIM
    Utilizing Coiled Tube Rig for Mineral Exploration Application

    By R. Roufail

    Mineral exploration is in a race to employ drilling technology that can perform the exploration and drilling investigation in a fast and inexpensive manner. After an extensive study of the available d

    Aug 1, 2013

  • AUSIMM
    Occurrences and Morphology of Fes2 at the Golden Cross Mine, Warni, New Zealand

    By J L. Maule, S J. Mathews, K A. Rodgers

    Gold and Silver bearing epithermal veins of the Golden Cross deposit are hosted in Miocene and Pliocene calc-alkaline volcanics occurring 8 km northwest of Waihi at the southern e

    Jan 1, 1994

  • NIOSH
    OFR-79-85 Strategic And Critical Materials Program Annual Report

    By R. E. Chaney

    This report summarizes the research on the Strategic and Critical Materials Program tasks conducted at the Idaho National Engineering Laboratory (INEL) between Mdy 1983 and April 1984. The work is

    Jan 1, 1984

  • AUSIMM
    Development of a Froth Dropback Measurement Device

    Development of a Froth Dropback Measurement Device

    Sep 13, 2010

  • SAIMM
    On Localizing Uniform Conditioning Estimates

    By O. Rondon

    Localized uniform conditioning is a technique developed to spatially locate selective mining unit grades that have been derived using uniform conditioning for the assessment of recoverable resources.

    Jan 1, 2014

  • CIM
    Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)

    By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett

    "The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri

    Jan 1, 2007

  • CIM
    Improving Column Flotation Cell Operation in a Copper/Molybdenum Separation Circuit

    By Jose R. Hernandez-Aguilar, Jeet Basi

    "The study evaluated the impact on overall circuit metallurgy of improving the performance of the two flotation columns that make up the final Mo cleaning stage in the Cu/Mo separation circuit at High

    Jan 1, 2009

  • AUSIMM
    Offshore Seismic and Magnetic Surveys of the Southern Coalfields Off Stanwell Park

    A combined reflection seismic and magnetic survey off the south coast of New South Wales has revealed six distinct reflection horizons within the Lower Triassic-Upper Permian sequence, and has enabled

    Jan 1, 1970

  • AUSIMM
    Project Delivery

    By E Skinner, G Lane

    Project delivery strategies are determined by project context, business case requirements, scale of project, market conditions, ownerÆs capability and preference, contractorÆs experience, resource and

    Jul 15, 2013

  • IOM3
    Mining education in the European Community

    By C. T. Shaw

    Fur a secure mineral supply position to be maintained in the Fiuropean Community there must be a supply of qualified people in the minerals industries. The education of the people required to run and

    Jan 1, 1993

  • AUSIMM
    Recent Secondary Extraction Experience at Cook Colliery in a Multi-Seam Environment

    Cook Colliery currently mines in the Argo Seam, beneath old workings in an overlying seam. The Argo seam is up to 4.8 m thick and a continuous haulage system behind an ABM25 is used to develop first w

    Nov 25, 2010

  • AUSIMM
    Electrowinning of Lead Directly From Galena

    A description is given of preliminary work done to identify the problems inherent in electrochemical oxidation of metal sulphides, and particularly in the use of powder compacts as anodes in electroly

    Jan 1, 1972

  • AUSIMM
    The Oxide Ore Treatment Plant, Mount Morgan

    This modern plant was installed with the object of treating all oxide ore and payable dump material by the cyanide process.The plant is located on a ridge on the eastern side of Linda Gully. The mill

    Jan 1, 1939