Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Coal-Briquetting in the United StatesBy Edward W. Parker
(Toronto Meeting, July, 1907.) NOTE.-The material from which this paper has been prepared was collected for the U. S. Geological Survey Bulletin, Contributions to Economic Geology, 1906, and appears
Sep 1, 1907
-
The Practical Application Of The Wemco Hms Drum Separator In The Mining & Metals Recycling Industries - 1. IntroductionBy K D. Wilkes
The WEMCO Heavy Media Drum Separator was first introduced by WEMCO in California in the 1940`s, initially from their base in San Francisco and later when the company moved to Sacramento. The WEMCO Co
Jan 1, 2006
-
Small footprint, big challenges: Design and construction of the Allen Park storage tunnelBy Brain E. Gombos
The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary
Jan 1, 2013
-
Rabbit Lake project – environmental impactBy R. L. J. Phillips
"The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental
Jan 1, 1989
-
Compositional Variation and Distribution of Au-Ag-Hg and Au-Ag Alloy Subtypes in Nokomai and Nevis Valley Placers, New Zealand, and their Implications for Gold SourcesBy D Craw, L C. Kerr, P Wopereis
Gold placers in the Nokomai and Nevis valleys are dominantly Quaternary in age. They occur mainly in western tributaries of the upper Nevis, eastern tributaries of the middle and upper Nokomai, and in
Jan 1, 2000
-
Hydrothermal Silicification and Alteration of Breccias from Lucky Strike and Menez Gwen hydrothermal fields (Mid-Atlantic Ridge, Azores)By I. A. Costa, Y. Fouquet, F. Barriga
"Lucky Strike and Menez Gwen are two hydrothermally active sites located along the border of the Azorean plateau, southwest of the Azores islands where the alteration processes affecting basaltic rock
Sep 1, 2014
-
Island Copper Mine Milling for Copper and MolybdenumBy Chris Brown
"The Island Copper plant was designed and built by Fluor Utah Ltd, in conjunction with Utah design staff, Originally designed to treat 33,000 tons/day (t/d) of ore, the current average milling capabil
Jan 1, 1975
-
Use Of Controlled Modulus Columns In Retail & Industrial Development ProjectsBy Frederic Masse
With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f
Jan 1, 2011
-
Transition and optimization of the Henderson mine ventilation systemBy C. Rutter, N. SHEA, K. KOLOBE
Henderson Mine’s primary production transitioned from the main portion of the 7700 level to the 7210 main panel in 2005. On the 7700 level, the southwest (SW) panel was brought into production in 2014
-
Discounted cash flow analysis — Methodology and discount ratesBy L. D. Smith
"This paper examines the impact of the various assumptions that go into an economic evaluation, and shows how these can be combined to show an exciting result that may not really exist. An example of
Jan 1, 2002
-
The Derrick Stack Sizer™: Revolutionary Advancements in Wet Screening TechnologyBy Benjamin H. Clark
"For over 50 years, Derrick Corporation has been renowned for its innovative and durable fine screening equipment and screen surface technology. Derrick’s latest innovation, the patented Stack Sizer,
Jan 1, 2007
-
Structures and Field Relations of Epidiorite Dykes in the Broken Hill OrebodyA study of literature on the epidiorite dykes which transgress the Broken Hill lode and its wall rocks reveals a considerable diversity of thought regarding the time of emplacement of such dykes. In t
Jan 1, 1968
-
IC 8123 Aluminum Fabrication In The Pacific Northwest: An Economic Survey ? SummaryBy Frank B. Fulkerson
Of the about 60 million pounds of aluminum used in the Pacific Northwest in 1960, 40 million pounds or two-thirds was used by 10 companies. One of these companies made airplanes and missiles; one manu
Jan 1, 1962
-
Subsidence Control Over Abandoned MinesBy Victor V. Nazimko
Long term stability of the pillars that have been remained after R&P extraction causes postponed subsidence. To prevent unforeseen subsidence and to diminish postponed subsidence 25-50% new method for
Jan 1, 1996
-
Tunneling Data: Turning Information into Intelligence on the NEIS ProjectBy John McDonald, Peter C. Raleigh, Christopher Dishlip
This paper will discuss how the construction management team and the contractor working together on the City of Los Angeles, North East Interceptor Sewer project, managed information on a daily basis.
Jan 1, 2005
-
Industry Technologies Featured at MPES MeetingThe development of technologies to improve mining and mineral processing is an ongoing process. These new technologies are the result of the industry’s drive to lower costs and improve productivity.
Jan 1, 2006
-
OFR-123(5)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume V Application Of PSU/MVS To The Ventilation Planning Of A New MineBy R. Stefanko
In this report, the use of Penn State Ventilation Simulator (PSU/MVS) for planning and evaluating new coal mine ventilation systems is demonstrated. The simulator's application to evaluate the ve
Jan 1, 1977
-
Identifying strategic gaps and opportunities in sustainable development initiatives within the South African mining industryBy T. C. Maswanganyi, G. L. Smith, R. C. A. Minnitt
This paper identifies the strategic gaps and opportunities for the South African mining industry’s contribution towards advancing sustainable development. Mineral resources companies are confronted by
Dec 15, 2025
-
Platinum Exploration on the Great Dyke of ZimbabweBy D. J. Bowen
"Abstract -The Great Dyke extends for 540 km along strike, to unknown depth, and varies in width from 3 km to 11 km. Rb/Sr age determinations gives values of approximately 2470 Ma.The Dyke consists of
Jan 1, 1994
-
Geology of the Vulture MineBy Don C. White
The Vulture mine near Wickenburg, Arizona was a major gold producer from 1863 to 1942, having yielded about 11t(12.1 st) Au and 8t (8.8st) Ag. Gold occurs as coarse native metal and electrum in quartz
Jan 1, 1990