Search Documents

  • AUSIMM
    Submarine Magmatic and Hydrothermal Processes in Volcanic Arcs ù Backarcs of the Southwestern Pacific Region

    By T F. McConachy, B I. A McInnes, R A. Binns

    Within the last decade, major research discoveries have been made in the submarine realm of magmatic and hydrothermal activity of arc-backarc systems in the southwestern Pacific. These include identif

    Jan 1, 2002

  • SME
    Guadarrama Tunnel Construction with Double Shield TBMs

    By F. Mendaña

    The characteristics of the igneous and metamorphic bedrock, extra-hard and abrasive, of the Guadarrama Tunnels, a bi-tube project of length 28.4 km without any intermediate attack, are first commented

    Jan 1, 2007

  • IOM3
    High-temperature mine climate simulation model for predicting the effect of mine fire

    By P. Mousset-Jones, G. Danko

    Variations of the temperature and steam/moisture content of the air with distance and time are modelled for a single airway. The input for the simulation is an air temperature that varies with time, t

    May 1, 1991

  • NIOSH
    RI 8928 - Large-Scale Dewatering of Phosphatic Clay Waste From Northern Florida

    By Annie G. Smelley

    The Bureau of Mines is testing a dewatering technique for phosphatic clay waste that will recover a portion of the water lost using conventional waste disposal methods and produce solids suitable for

    Jan 1, 1985

  • SME
    Financing The Mineral Prospect Or Small Mine In Canada

    By William L. Young

    I think I should let you in on one of Canada's best-kept secrets, if you will promise not to tell it all over the place. Believe it or not, good, honest, enterprising capitalism is still alive an

    Jan 1, 1981

  • SME
    Case Study: Correcting Mechanical And Control Problems On Essroc?s Multi-Drive Station Horizontally Curved Conveyor ? Introduction

    By A. Jennings

    [ ] In November 2005, Essroc Cement, part of the Italcementi Group, commissioned a long overland conveyor at their Nazareth plant in Pennsylvania. This conveyor, tagged CV-105, was designed to tran

    Jan 1, 2012

  • AUSIMM
    The Recovery of Zinc from Lead Blast-Furnace Slags

    As the question of zino recovery from lead blast furnace slags has lately become such an important subject with lead metallurgists, the following description of some of the work carried out in this oo

    Jan 1, 1920

  • NIOSH
    IC 8618 Overcoring Equipment And Techniques Used In Rock Stress Determination

    By Verne E. Hooker

    Stress-relief techniques and instrumentation have been developed through many years of research in the Federal Bureau of Mines and successfully used to determine the in situ state of stress in rock. T

    Jan 1, 1974

  • NIOSH
    RI 9662 - Evaluation Of Instrumented Cable Bolts In Cement Grout To Determine Physical And Numerical Modeling Properties

    By Rimas Pakalnis, Doug Milne, Marc Ruest, Lewis Martin

    Whereas many researchers and mine engineers have conducted tests on cable bolts using various grouts, water: cement ratios, and physical modifications of the cable to determine the load-carrying chara

    Jan 4, 2004

  • NIOSH
    RI 5856 Hafnium Content Of Domestic And Foreign Zirconium Minerals ? Summary

    By H. D. Hess

    This report presents the results of laboratory mineral evaluations conducted by the federal Bureau of Mines under the joint sponsorship of the U.S. Atomic Energy Commission (AEC) and the Bureau a! Shi

    Jan 1, 1962

  • NIOSH
    IC 9379 Coal Reserves Of The Boltsfork Quadrangle, Kentucky A Coal Recoverability Study

    By Timothy J. Rohrbacher

    This report presents a U.S. Bureau of Mines study that incorporates coal mining factors, coal recovery factors, and economic factors into the definition of an economically recoverable coal resource. T

    Jan 1, 1994

  • AUSIMM
    Tensile strength and shear strength properties of the adhering layer of granules in iron ore sintering

    By H Zhou, T Honeyands, M Zhou

    In iron ore sintering, packing the granules onto the sintering strand to form a porous bed with optimum permeability is a complex dynamic process. The packed bed voidage is the key factor determining

    Jul 24, 2017

  • CIM
    The Application of the Marconaflo Slurry System to Mineral Processing and Extraction

    By N. W. Kirshenbaum

    "The Marconaflo slurry system was originally developed to reduce costs and solve technical problems in the marine transport of mineral cargoes. In the short time since its inception, it has been found

    Jan 1, 1973

  • SME
    Looking for Mr. Good Contract

    By Wayne E. Kilker, Michael J. McBride, William P. Levy, Thomas J. Lamb

    Between 1989 and 2004 the Massachusetts Water Resources Authority (MWRA)constructed several major wastewater and water tunnels associated with three major projects in the Boston area of eastern Massac

    Jan 1, 2005

  • AUSIMM
    The Problem of Surplus Productive Capacity in the Coalmining Industry

    The coalmining industry in most countries has, at various times, suddenly been confronted with a decrease in demand for coal. Readjustments made to reduce productive capacity to match the reduced dema

    Jan 1, 1961

  • SME
    Abstract Page - Fundamental Approaches in Longwall Dust Control

    By R. A. Jankowsi, S. K. Ruggieri

    Airborne respirable dust levels on longwalls can be reduced if operators approach the dust control problem in a logical and fundamental manner. This can be accomplished through the proper application

    Jan 6, 1985

  • SME
    Movement of Diesel Powered Vehicles as a Factor Influencing Environmental Health Standards in Mine Dead-End Headings

    Diesel powered machines are doing some specific operations in the cyclic order required by the technical process. The dynamics of this process in certain conditions has an essential influence on envir

    Jan 6, 1985

  • AIME
    Technical Notes - Substructures in Retained-Beta Phase of Ti-Ni Alloys

    By J. Gordon Parr, D. H. Polonis

    IN a previous study of hypereutectoid Ti-Ni alloys' a substructure was observed in quenched powder specimens when the constitution was 100 pet retained ß body-centered-cubic phase. The alloy powd

    Jan 1, 1957

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • SME
    Slurry Pump Design Features

    By George Wilson

    When pumping abrasive slurry mixtures, special attention must be given to pump design and construction. The second article in this two-part series describes some design features to consider when selec

    Jan 10, 1981