Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Evaluation of Geological Conditions Ahead of TBM Using Seismic Reflector Tracing and TBM Driving DataBy Descour Jozef, Suguru Shirasagi, Takuji Yamamoto, Koji Murakami
For TBM tunneling no visual inspection of excavated ground is possible. This may hinder the high-speed excavation, particularly in complex ground conditions. The TBM Excavation Control System was deve
Jan 1, 2007
-
Use of Mine Tailings as Precast Construction Materials through Alkali Activation Mining, Metallurgy and Exploration (afe55b4e-c2bb-46a0-a2d9-37ae31a22959)By Qingming Feng, Bo Huang, Dongbo An, Jinhong Zhang
A study of the application of mine tailings as precast construction materials through alkali activation has been carried out, focusing on efficiently activating mine tailings, reducing alkali consumpt
-
Use of Mine Tailings as Precast Construction Materials through Alkali Activation Mining, Metallurgy and ExplorationBy Qingming Feng, Bo Huang, Dongbo An, Jinhong Zhang
A study of the application of mine tailings as precast construction materials through alkali activation has been carried out, focusing on efficiently activating mine tailings, reducing alkali consumpt
-
Tailing Dam Monitoring – Safety Enhancement Through Data Fusion - SME Annual Meeting 2022By J. Kretschmann, A. Müterthies, T. Rudolph, C. Yang, P. Goerke-Mallet
Catastrophic failures of dams and tailing storage facilities (TSF) have triggered the development of integrated ground monitoring concepts for hazard assessment, risk management and public safety. The
Mar 2, 2022
-
Pebble Crushing Practice at Cyprus BagdadBy Bruce Clements
The Bagdad mill, located near Bagdad, AZ, was built in 1977 with a designed mill capacity of 36.3 kt/d (40,000 stpd). An autogenous mill-ball mill crusher (ABC) grinding circuit was chosen. The or
Jan 1, 1992
-
South Cobb Tunnel - Cobb County?s Solution To Meeting Future Waste Water CapacityBy Wojciech Klecan
Cobb County, located on the northwest side of Atlanta, GA, is continually growing and, like many other metropolitan areas, it needs to increase the capacity of its waste water system to meet future de
Jan 1, 2009
-
A Better MousetrapBy B. G. Kelley
The MIDREX® Direct Reduction Process was developed during the 1960s by the Midland-Ross Corporation, which had pioneered shaft furnace technology and stoichiometric gas reforming for use in processing
Jan 1, 1998
-
Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle HarbourBy R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves
Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse
Jan 1, 2001
-
Design and Risk Management Strategy for the Sound Transit Beacon Hill Station and TunnelsBy Joseph Gildner, Donald J. Phelps, Jürgen Laubbichler, Christopher Tattersall, David McAllister
The Beacon Hill Station and Tunnels portion of the Sound Transit Central Link Project consists of one mile of twin rapid transit tunnels, an underground station, portals and ancillary works constructe
Jan 1, 2005
-
Evaluation of Baking Process for Rare‑Earth Recovery from Discarded Tube Lights PhosphorBy Neha Shukla, Nikhil Dhawan
The current study examines the extraction of rare-earth elements from trichromatic phosphor of discarded tube lights via baking processes. The Y2O3: Eu3+ (YOX) and BaMgAl10O17: Eu2+ (BAM) phases compl
May 5, 2022
-
Dripping Into Subterranean Cavities From Unsaturated Fractures Under Ventilated ConditionsBy R. Fedors, T. Ghezzehei, D. Or
The phenomena of dripping into cavities (e.g. tunnels and drifts) within an unsaturated fractured porous medium under ventilated conditions is studied to improve estimates of dripping rates, drop size
Jan 1, 2000
-
Raw Materials and Technology Fuel U.S. Economic GrowthBy Thomas D. Kelly
In 1900, the average U.S. citizen’s average life span was 47 years. He traveled about 1,900 km (1,200miles) in a lifetime and resided in a home with an ice-box for food storage and oil or gas for lig
Jan 1, 2002
-
Earthquake Engineering Of Tunnels - RevisitedBy G. Norman Owen, Roger E. Scholl
INTRODUCTION The analysis and design of underground structures to resist vibratory motion due to earthquakes has been of interest to engineers for several decades. The dynamic stability of a powerh
Jan 1, 1985
-
Development Of Experimental Procedures To Analyze Copper Agglomerate StabilityBy K. A. Lewandowski
The efficiency of heap leaching is reduced by poor solution flow characteristics (i.e., channeling and ponding) that result from fines migration. Agglomeration of the ore can immobilize fines, but for
Jan 1, 2008
-
New Boomheading Machines (Roadheaders) Technical & Economic Integration Into Mine Development And ProductionBy Howard J. Handewith
Long used in mine development in England, Europe and Russia, roadheaders are growing in size, features, productivity and application. Beginning with the basics, this paper covers the economic and t
Jan 1, 1983
-
Managing Impacts of Deep-Sea Resource Exploitation - The Midas ProjectBy Philip Weaver
The MIDAS project is funded by the European Commission (DG Research) and began on the 1st November 2013. The project will investigate the environmental impact of deep-sea mineral and energy extraction
Sep 1, 2014
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)By · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and ExplorationBy · J. B. Boisvert, O. Leuangthong, T. Acorn
Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin
-
The Expectations For Coal: Is Our Government And The Coal Industry Prepared?By M. S. Miller
With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding
Jan 1, 2004
-
North 27th Street ISS Extension: Unique Owner/Contractor Agreement Settles Major DisputesBy Donald J. Olson
The North 27th St. ISS Extension tunnel will, under present plans, be the last constructed section of Milwaukee Metropolitan Sewerage District?s (MMSD?s) existing deep tunnel system. The 6.5 m (21 ft)