Deformation Measurement In An Inclined Reinforced Concre'i'e AditBy I. Weir-Jones
I. Introduction The experimental work described in this paper was carried out during 1967 and 1968 in an inclined reinforced concrete adit which had been driven during 1965 and 1966 to provide primar
Jan 1, 1971
-
Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie
The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft
Jun 23, 2024
-
Investigation of Correlation of Excavator Operators’ Hand-Arm Vibration Exposure with Produced Rock Physical-Mechanical Properties in Natural Stone Quarries Mining, Metallurgy and ExplorationBy Ali Ekrem Aritan
Exposure to hand-arm vibration (HAV) among the labor force in the mining industry can result in permanent vibration diseases such as behavioral disorders, visual impairment, osteoporosis, pain (mostly
-
Performance of Reinforced Ribs of Shotcrete (RRS) Under Different Stress RegimesBy Panagiotis Chryssanthakis
"The aim of this study is to give a better understanding for the performance of the composite material RRS and the synergy effect of its components under different stress regimes and while an excavati
Jan 1, 2016
-
Project Optimization and Competitiveness Enhancement Trough an Intergrated Health and Safety Management – Safety for Construction Work UndergroundBy J. Herhold, S. Plaum
"Current and future operational processes in the mining and underground construction sector are under the influence of the prevalent competition and the acute necessity of optimization approaches conc
Jan 1, 2017
-
Gas and the Electric Utilities in the WestBy Barry Hunsaker
I cannot help but be reminded, as I stand here today, of my boyhood years and heritage, both of which are inextricably tied to this very valley and are, in a: bay, apropos of the theme of this Keynote
Jan 1, 1965
-
Major Silver Deposits Of Utah: Geochemical And Geological Reasons For World-Class High- And Low-Grade SystemsBy L. P. James, W. W. Atkinson
Utah has produced about 31.7 kt (1 billion oz) of silver, more than any state in the United States except Idaho. Several high-grade ore systems in Utah, where the mines are now closed, occur within la
Jan 1, 2003
-
Density Separation Of Fine, High-Density Particles In A Water-Only HydrocycloneBy B. H. Kim
The use of a 25.4 mm diameter water-only hydrocyclone for separating fine-size (-150 µm), high-density (>4.5 g/cc) particles from similar-size, lower-density (2.65 glee) particles was investigated. It
Jan 1, 1998
-
Research Directions To Increase Alumina Recovery From BauxitesBy Lester A. D. Chin
The cost of bauxite is a multiple of the Bauxite Consumption Factor and the Unit Cost of Bauxite, and is a major cost item at most alumina plants. Bauxite Consumption Factor can be reduced by increasi
Jan 1, 1984
-
Sacrificial Anode Technology for Corrosion Protection of Mine Roof BoltsBy A. Bhagwat, S. Tadolini
"Steel members of the ground support systems in underground mines are routinely exposed to corrosive environment that may range from acidic to alkaline. Corrosion of steel bolts leads to metal loss an
Jan 1, 2018
-
Abandoned Mine Reclamation-Is It Worth The Investment?By J. J. Gusek
The Riley Pass strip mine is an abandoned uranium-bearing lignite deposit in Harding County, South Dakota, covering about 150 acres of highwalls, pit floor and mine spoils exhibiting elevated levels o
Jan 1, 1995
-
Blasting Practices At The Cannon MineBy C. J. Gilbert
The mining method at the Cannon Mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill prior to pillar removal. The dimensions of the pillars, 24 feet w
Jan 1, 1989
-
Pellet Production By Cold Bonding And Low Temperature Bonding MethodsBy Hou Xilun
Three production methods of rapid cold bonding and low temperature bonding pellets using sponge iron powder as a binder have been successfully developed. These methods differ from ordinary bonding met
Jan 1, 1980
-
The Aerofall Grinding System As Applied To Industrial Minerals And ProductsBy A. K. Clarke
In any treatment process that requires a coarse feed material to be reduced to a fine size by crushing and/or grinding it must be determined whether a wet or dry comminution system should be utilized.
Jan 1, 1971
-
Optimization of water usage is critical for mine productivity and sustainability - ME Feature ArticleBy Brian Hays, Victor Mwaba
Optimization of water use has become a top priority for virtually every mining operation. The mineral extraction process typically requires vast quantities of water, which can be particularly challeng
Apr 1, 2026
-
The Effect Of Ph And Eh On The Chemical And Biological Leaching Of A Pyritic Uranium OreBy A. Bruynesteyn
Results are presented from a series of tests designed to determine the beneficial effects of the microorganism Thiobacillus ferrooxidans upon the leaching of uranium from a pyritic uranium ore. Min
Jan 1, 1981
-
Empirical Approach For Drift Blast Design In Hard Rock MinesBy S. P. Singh
Drifts are the nerve centre of underground mining. They provide essential communications between primary openings and production areas. In view of their strategic importance in the overall safety, eco
Jan 1, 1991
-
The Salient Distinctions Of Mining EngineeringBy L. Adler
When systematically compared to other engineering fields, mining engineering is distinctive in 1) having a total systems concern. 2) dealing with encumbered space and 3) requiring full spectrum practi
Jan 1, 1985
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann
The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside
Dec 1, 2022