Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Robust Showfloor Reflects Optimistic Mood at 2017 Annual Conference and Expo"In addition to outstanding technical sessions and networking opportunities, the SME Annual Conference and Expo offers attendees a chance to see the latest and greatest technology that the industry ha
Jan 5, 2017
-
Water Jet Assisted Boring In South African QuartzitesBy J. L. Page, A. C. Marlowe
The Research and Development Services of South Africa has begun underground trials with a Robbins 52RE blindhole borer using a cutterhead fitted with high pressure water jets to assist mechanical cutt
Jan 1, 1985
-
Construction Works Of Large-Section Vertically Parallel Twin Tunnels In Close ProximityBy Kentaro Kuraji
INTRODUCTION Background Tokyo, the capital of Japan, is one of the largest cities of the world. As many as 33 million people live in Tokyo and three neighboring prefectures although the city occupi
-
Decline Development At The Lakeshore PropertyBy Robert S. Hendricks
LOCATION AND HISTORY The Lakeshore Copper property is located on the Papago Indian Reservation approximately 30 miles South of Casa Grande, Arizona. This major porphyry type deposit was discovered
Jan 1, 1997
-
Mechanized Mining of Narrow Veins – Problems and Equipment OptionsBy Jacek Paraszczak
Numerous problems encountered in the mining of narrow vein deposits challenge the productivity, competitiveness and profitability of many mines. Mechanization of mining operations is one of the most i
Jan 1, 1992
-
Using an intelligent supervisory system to simulate automatic operation in a crushing plantBy E. Fahrenkrog, D. Sbartaro, E. N. Cifuentes
An intelligent supervisor using expert system tools and applied to a crushing plant has been developed with a structure based on a model of a human operator. It consists of a knowledge base containing
Jan 1, 1989
-
The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and ResultsBy Enrique Fernandez
M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to
Jan 1, 2007
-
Reserve calculations, mining, and milling of Homestake Mining’s Open Cut project describedBy Jerry D. Pfarr, Gary Loving, David G. McDowall
Introduction The Open Cut is one of the best known landmarks in South Dakota's Black Hills. It is the site of the original discovery of the Homestake ledge, or lead, in 1876. Between that time a
Jan 10, 1987
-
Mine Wide Protection For Miners, Equipment And InfrastructureBy W. H. Schiffbauer
The protection of miners, equipment, and infrastructure is discussed. While the primary focus of the described technology is to prevent miners from being injured, struck-by, or crushed by heavy equipm
Jan 1, 2011
-
Rock Load Estimation For Tunnels In Squeezing Ground ConditionsBy Bhawani Singh, A. K. Dube, B. Singh
At least three hydroelectric tunnels constructed during the last decade through the lower Himalayan region in India have met with serious problems of supporting in squeezing ground conditions. Steel r
Jan 1, 1981
-
Reputation Engineering: Building Stakeholder Trust in the Age of AI - SME Annual Meeting 2026By Michael MacMillan
AI is already changing how mining companies are seen, judged, and trusted. This paper discusses “reputation engineering,” a structured way to build trust in a world where AI systems summarize and eval
Feb 22, 2026
-
Monitoring Used as an Alarm System in TunnelingBy M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli
This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th
Jan 1, 2007
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007
-
Promising Options for Solving the Dolomite Problem of the Florida Phosphate Resources—a Brief Review Mining, Metallurgy and ExplorationBy Dapeng Zhang, Brij Moudgil, Shibo Zheng, Chunhui Feng, Wenyi Song, Wending Xiao, Patrick Zhang
Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserve in Florida contains too much dolomite to process using t
-
Port Of Miami Tunnel Tender Design And UpdateBy Wern-ping (Nick) Chen
The Florida Department of Transportation District 6 (FDOT D6) began a study in 1987 for a master plan to improve the traffic circulation and congestions between the Port of Miami (POM) and downtown Mi
Jan 1, 2009
-
Feasibility Study on the Modification and Improvement of Flotation Circuits at Enrichment Plant 2 of the Sarcheshmeh Copper Complex Mining, Metallurgy and Exploration (5b85b197-36d7-44cc-879d-d3b823248b9d)By Bijan Taheri, Behrouz Maghsodi, Monireh Heshami, Reza Kohan
A common problem recently encountered with the increase in the rate of input feed at Enrichment Plant 2 of the Sarcheshmeh Copper Complex is the loss of value to the tails, translating to lower recove
-
Current State Of Disc Cutter Design And Development DirectionsBy Joe Roby
Rolling disc cutters are the business end of hard-rock and mixed-face tunnel boring machines (TBMs). Since their first successful employment on a TBM more than 50 years ago, disc cutter technology ha
Jan 1, 2009
-
Surface Mining: Mechanical Extraction MethodsBy M. K. McCarter
Surface mining applies to extraction of mineral resources from water and sediments of rivers, lakes, seas, and oceans; from solutions circulating through broken rock and soil; and from rock and soil e
Jan 1, 2008
-
Correlations of Grinding Mill Structural Design ProceduresBy V. Svalbonas
When the Trelleborg Divisions of Boliden Allis and Mineral Processing Systems (MPSI) merged, a unique opportunity occurred for two independent mill fabricators to compare design pro¬cedures and the re
Jan 1, 1992
-
Case Study – UG Stope Optimization at Agnico Eagle’s Kittilä MineBy K. Huttu, A. van Wageningen
"The Kittila underground mine is extracting one of the largest known gold deposits in Europe and has an estimated mine life through 2034. The Kittila mine is located in the Lapland region of northern
Jan 1, 2015