Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Toward discrete element modelling of material flow in submerged arc furnaces APCOM 2021By G. Akdogan, C. Bergmann, C. J. Coetzee, Q. G. Reynolds, S. J. Baumgartner
Submerged arc furnaces (SAF) are used extensively in the production of ferrochrome, where charge material – consisting of mixtures of carbonaceous reductants, fluxes such as silica, and ore in the for
Sep 1, 2021
-
Potential for the mechanization of stoping in gold minesBy N. C. Joughin
Potential for the mechanization of stoping in gold mines by N. C. JOUGHIN B.Sc. Eng., Ph.D. (Rand) (Member) The basic requirements for stoping machines are identified first by examination of the minin
Jan 1, 1976
-
Book reviewsIntroduction to high temperature oxidation of metals, by N. Birks and G. H. Meier, London, Edward Arnold, 1983. 19S pp. R30,25. Reviewers: M. B. Cortie and G. G. Garrett Seam gas drainage with particu
Jan 1, 1984
-
Flowsheet development for the Sukari gold project in EgyptBy M. Rhodes
The Sukari project, which is owned by Centamin Egypt Ltd, is located in southern Egypt, 770 km south of Cairo but close to the Red Sea. The project is the first new gold development in Egypt and was c
Jan 1, 2009
-
The Mutoshi Project — Part I: Metallurgical Test Work, Process Design, and Project DeliveryBy N. Tatalias, P. Ilunga, M. Lampi, J. Edwards, K. Valkama, M. Nicolle, D. Samal
"Developing a greenfield mining project is a complex exercise: doing so in an increasingly volatile, uncertain, and ambiguous global economy adds significantly to this complexity. In the context of an
Nov 1, 2018
-
Proceedings October General MeetingThe October General Meeting of the Institute was held in Kelvin House, Johannesburg, on 15th October, 1969, at 4.30 p.m. Mr J. K. E. Douglas (President) was in the Chair. There were also present
-
Influence of ground motion model selection on seismic hazard for JohannesburgBy R. J. Durrheim, B. Manzunzu, V. Midzi
Selecting ground motion prediction models (GMPM) is crucial in assessing seismic hazard levels in a specific region. This study investigates the influence of ground motion model (GMM) selection on sei
Jan 12, 2025
-
The Geoscience Education Pipeline in South Africa: Issues of Skills Development, Equity and GenderBy G. Drennan, A. Cameron
"South African mining operations depend on the skilled professionals produced through the tertiary education sector. In geoscience courses at the University of the Witwatersrand, which lead into the m
Jan 1, 2017
-
Proceedings of the May, 1969, General Meeting (4c6dfff7-cd96-4a8f-a0ef-c8c7969a81e2)The May General Meeting of the Institute was held in Kelvin House, Johannesburg, on 21st May, 1969, at 4.30 p.m. Mr J. K. E. Douglas (Vice-President) was in the Chair. There were also present t
-
Proceedings of the May, 1969, General MeetingThe May General Meeting of the Institute was held in Kelvin House, Johannesburg, on 21st May, 1969, at 4.30 p.m. Mr J. K. E. Douglas (Vice-President) was in the Chair. There were also present tw
-
Registration: South African Council for Professional EngineersSACPE has asked the Journal to bring the following points to the notice of members who are about register with SACPE. When to Apply There is no set time to apply for registration. Engineers should app
Jan 1, 1982
-
Competition for student membersEach year the South African Institute of Mining and Metallurgy offers a prize (or prizes should the entries warrant it) of up to RlOO for the best paper or dissertation on a topic appropriate to the i
Jan 10, 1976
-
Linear Programming Models of Copper Leach and Solvent Extraction PlantsBy W. P. C. Duyvesteyn, J. R. Cutland, J. R. L. Russell
In 1970 it was decided to build a large new plant at the Chingola Division of N.C.C.M., Ltd., to treat concentrator tailings and leach residues with a low copper content by a leach-solvent extraction-
Jan 1, 2014
-
A Spatial Mine-to-Plan Compliance Approach to Improve Alignment of Shortand Long-Term Mine Planning at Open Pit MinesBy T. J. Otto, C. Musingwini
"The objective of any mining company is to sustainably maximize the net present value (NPV) throughout the life-of-mine (LOM). The expected NPV over the LOM is calculated based on a mine plan, yet the
Mar 1, 2019
-
3D Geological Modelling and Resource Estimation for a Gold Deposit in MaliBy L. Chanderman, C. E. Dohm
"Mineral Resource estimation (MRE) and classification are highly dependent on the confidence in the model of the orebody geometry, known as the geological model, within which the estimates are constra
Jan 1, 2017
-
On-Line Analysis - What has been Done?By Pieter de Waal
The beneficiation equipment under the control of plant metallurgists exploits the differences in the physical properties between valuable and waste mineral components. In many cases, laboratory result
Jan 1, 2014
-
Written Contribution - Revised Strength Factor For Coal In The Vaal BasinBy J. N. van de Merwe
CONTRIBUTION BYH. WAGNER AND T.T. OZAN The paper by Dr J.N. van der Merwe makes an important contribution to the design of bord-and-pillar workings in the Vaal basin. It has been recognised for so
Jan 1, 1993
-
Human factors in stope productivity -a field experimentBy A. C. Lawrence, K. F. Mauer
Human factors in stope productivity -a field experiment by K. F. MAUER, M.A. (Visitor), and A. C. LAWRENCE, B.Econ., D.Com. (Member) An experiment in which three human variables were manipulated in ei
Jan 10, 1973
-
The use of Information Technology in the Mineral Resource Management environmentBy J. van Zyl Visser
The advancement in Information Technology has resulted in a change in workflow practice in our Mineral Resource Management (MRM) offices on the mines and at our corporate office. This paper discusses
Jan 1, 2003
-
Linear Elastic Numerical Modelling For Failure Prediction, An Assesment - SynopsisBy S. K. Murphy
A partial shaft pillar extraction project was embarked on at a mine in the West Wits mining region in South Africa. Prior to the extraction, a rock engineering assessment was conducted with the main o
Jan 1, 2012