Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Underground Pillar Blasting with Bulk Emulsion explosives

    By H Russell

    An account of an experimental blast at the Sullivan Mine involving a small pillar drilled with 4 1/2" diameter up-holes, and loaded with emulsion explosives from a truck-mounted tank/pump unit.

    Jan 1, 1984

  • ISEE
    Effective Construction Blasting Damage Control

    By Earl C. Hutchison, Gene Smith

    Extensive blasting was required to construct an underground tunnel for a 90 inch sewerage relief line. The tunnel and required excavation extended under an upper middle-class residential area in Atlan

    Jan 1, 1981

  • ISEE
    Comparison of Highwall Control Methods at Bayswater Colliery

    By Tapan Goswami, Michael Croucher

    At Bayswater Colliery various methods of controlling highwall stabii were investigated. The use of presplitting was trialled and its effectiveness measured. The presplit hole spacing and explosive cha

    Jan 1, 1999

  • ISEE
    Journal: Book Review / Micrometer Crack Response to Vibration and Weather

    By ISEE

    Micrometer Crack Response to Vibration and Weather, by Prof. Charles H. Dowding of Northwestern University, adds to Prof. Dowding’s already important contributions to the industry with his “Constructi

    Jan 1, 2010

  • ISEE
    Blast Casting in a Sensitive Environment

    By Greg J. Stach, Norman "Skip" Hale

    The authors describe the development of an overburden blast casting program in the upper seam of coal at a 2-seam surface mining operation on property adjacent to an active operating underground coal

    Jan 1, 1984

  • ISEE
    Journal: Dynamite Daze

    By S. S. Bud Jenkins

    I went to an underground limestone mine recently to demonstrate the use of borehole liners. The liners were for horizontal holes in a normal “V” cut tunnel round. I hadn’t been in this mine for about

    Jan 1, 2010

  • ISEE
    Portsmouth Harbor Project

    By Vincent Thorne

    On January 2, 1992, the R. Zoppo Company of Stoughton, Massachusetts started drilling and blasting operations on U.S. Army Corps of Engineers Project Number: DACW33-91-B-0072 to widen and deepen the P

    Jan 1, 1993

  • ISEE
    Swedish Cautious Blast Excavation at the CSM/ONWI Test Site in Colorado

    By Roger Holmberg, William Hustrulid

    Swedish cautious blasting techniques were used to excavate a room at the CSM Experimental Mine in Idaho Springs, Colorado,as part of a ONWI/DOE sponsored nuclear waste disposal research program.

    Jan 1, 1981

  • ISEE
    A Review of Recent Accidents Involving Explosives Transport

    By James Rowland, Richard Mainiero

    When most people think of explosives transport they think of a hazardous operation. We all know that we aren’t allowed to transport explosives through tunnels and are discouraged from traveling throug

    Jan 1, 2008

  • ISEE
    Development of Drop Raise Blasting at the Homestake Mine

    By Paul V. Sterk

    In the early 1980's, the Homestake Mine converted from labor intensive methods such as open cut-and-fill mining to Vertical Crater Retreat (\/CR) bulk mining and mechanized cut and fill. This transfor

    Jan 1, 1991

  • ISEE
    Development of an Ultra Low Density Reactive Agent

    By Guillermo Silva

    A novel, ultra-low density explosive composition, particularly suited for wall control and other applications requiring customising of the explosive’s energy output, has been developed. Being reactive

    Jan 1, 2000

  • ISEE
    Explosives Casting Technology in Surface Mining

    By D E. Shaw, J B. Case, J Gusek

    Explosive casting of overburden is defined as the use of explosives in blasting to move overburden to a spoil pile without rehandling. Studies of the economic feasibility of the method, and the formul

    Jan 1, 1980

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010

  • ISEE
    The History and Development of Permissible Explosives for Underground Coal Mining (c0bdb26c-921d-4fa8-97b7-a8bd2dbb04d2)

    By Robert B. Hopler

    The hazards which naturally prevail in underground coal mines, always severe and unpredictable due to the loosely-consolidated strata in which coal is frequently found, are increased by the commonly-o

    Jan 1, 1996

  • ISEE
    The Fundamentals of a Good Electronic Initiation System Program

    By Thomas Barkley

    Until the recent past, blasters have provided good to excellent results with tools and processes that have an inherent error. These errors can be found in drilling, explosives delivery quality and con

    Jan 1, 2011

  • ISEE
    Vibration impact reduction to the community through low density bulk emulsion.

    By E. Líder, J. Pavez, J. Rivera

    The application of new technologies, methodologies, and the use of new products in mining operations is a practice that is becoming more common in the industry every day, added to the new challenges a

    Jan 1, 2024

  • ISEE
    Improving Blast Preformance with High Density Toe Loads

    By John Floyd, Larry Wardrip

    A series of tests were conducted to evaluate the performance of a high density, high velocity cartridged explosive. The tests included two production blasts in a limestone quarry and two production bl

    Jan 1, 2002

  • ISEE
    Quantifying Shovel Performance Through Blast Pattern Boundaries

    By K. Taylor

    In surface coal mining, the performance of a shovel through blasted muck is one of the key performance indicators of the blast. Historically, performance has been measured qualitatively based on opera

    Jan 1, 2024

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023