    Oversize Reduction Project at the Iron Ore Company of Canada (Full Article)

    By Rodney Pinksen, Remi Proulx

    The IOC Mining and Operations Departments expressed an interest in reducing the amount of oversize material (>1.0 m x 1.0 m x 1.0 m; 39 inches x 39 inches x 39 inches) being produced and its subsequen

    Jan 1, 2011

  • ISEE
    Firing Reliability of Electronic Detonators

    Electronic detonators are receiving increasing acceptance in the blasting industry. Electronic detonators offer several distinctive features over electric and non-el (shock tube) detonators including

    Jan 1, 2010

  • ISEE
    Effect of Blasting Vibrations from Deck Blasts on Pit Wall Stability (Blasting and Fragmentation Vol. 11, No. 1, 2017)

    By B Mohanty, A Siamaki, K Esmaeili

    Large scale open pit mining and quarrying operations dictate safe and reliable pit wall stability. The current approach of employing the particle velocity-scaled charge distance approach to estimate a

    Jan 1, 2017

  • ISEE
    Death of a Coal Shovel

    By Roger G. Sprague

    With the passing of time, changing marketplaces and years of hard service, coupled with new machines, increased productivity, rapidly improving technology, equipment which used to be the latest in mod

    Jan 1, 1998

  • ISEE
    Traffic Tunnels in Rock - Guide Levels for Blast-Induced Vibrations

    By Sven-Erik Johansson, Gosta Rundqvist, Donald Jonson

    In Stockholm a new road traffic system called Södra Länken (Southern Link) will be in operation in late 2004. The total length of the road system is 6 kilometres of which 4,5 kilometres run through tu

    Jan 1, 2004

  • ISEE
    Effect of Artificial Discontinuities Formed by Presplitting with Different Depths on Structural Damage Risk

    By Enver Alan

    This Research & Development (R&D) study was conducted in the field of applied blasting engineering in Ethiopia, within the AKH Railway Project, which was built in Girena, within the boundaries of the

    Feb 1, 2020

  • ISEE
    The Effect of Selected Blasting Parameters on the Detonation Velocity of Bulk Emulsion Explosives

    By Piotr Mertuszka

    Many years of research on more effective and safer explosives have led to the development of emulsion explosives. They are the second most commonly used group of explosives worldwide, primarily becaus

    Jan 26, 2026

  • ISEE
    Disposal of Old Munition - Part 1. - A Research Method for the Estimation of Heavy Metal Deposit Range of Open Sur-face Mass Detonations

    By Martti Hagfors, Mervi Hokkanen

    The Finnish Defence Forces has destroyed obsolete and spoiled ammunition in open surface mass detonations at Hukkakero fell, in municipality of Kittilä, in Lapland since 1988. The de-struction method

    Jan 1, 2011

  • ISEE
    Examination of Dynamic Parameters of Rocks using Hopkinson Bar Experiments

    By O. Rielo, A. Pascoal, P. Katsabanis

    The dynamic parameters of two different granites have been obtained using Hopkinson bar experiments. One series of experiments were conducted using a Hopkinson pressure bar apparatus with an explosive

    Jan 1, 2011

  • ISEE
    Rock Slope Remediation on the Pennsylvania Turnpike

    By Ron Woolf, Corry Goumans

    With increasing traffic volumes experienced thro u g hout North America, a common goal for Highway officials is to keep traffic flowing as much as possible and to keep disruptions to the flow to a min

    Jan 1, 2003

  • ISEE
    A New Way of Looking at Risk and QD Compliance

    By Lon Santis, Michael Swisdak, John Tatom

    The Institute of Makers of Explosives (IME) and A-P-T Research, Inc. (APT) have developed a quantitative risk assessment tool called IMESAFR (IME Safety Analysis for Risk) for managing risk from vario

    Jan 1, 2013

  • ISEE
    Inco Limited Upper Blind Slot Raise 8M (25') to 12M (40') Longhole Carbide Drilling (L.C.D.) Method

    By Steven Richardson, E A. Cameron, Reza "Ray" Jambakhsh

    This paper outlines the design and implementation of a method to use Long hole Carbide drilling to blast an "Upper Blind Slot Raise" in the range of 12m (40 ft).

    Jan 1, 1992

  • ISEE
    Responsible Blasting: Strategies for Community Impact Mitigation

    By César Ugaz, Jorge Cardenas

    Mitigating the vibrations resulting from a blasting rocks is one of the most common challenges that Peruvian mining has, since if this impact is not mitigated it can generate discomfort and altercatio

    Jan 26, 2026

  • ISEE
    Resolution to a Conflict Regarding Blasting Near a High Pressure Pipeline

    By Randall Wheeler

    In early 2008 we were asked by a quarry to become involved in a conflict with a pipeline company concerning blasting near one of their underground high pressure gas lines. The pipeline company, withou

    Jan 1, 2011

  • ISEE
    Pipe Fragmentation Analysis to Determine Characteristics of Improvised Explosives

    By S. Geerts, J Davidson

    The purpose of the experiment was to determine detonation characteristics of various improvised explosives. The test consisted of detonating a pipe filled with an explosive compound inside of a plywoo

    Jan 1, 2011

  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025

  • ISEE
    Community Response To Airblast And Vibration From Surface Charges

    By L. Wilson, M. Kotzel, T. Pienaar

    An empirical equation is presented for the maximum airblast from unconfined charges. This has been tested at a number of sites and with charges ranging from 0.1kg to 311kg. The equation is developed t

    Jan 1, 2011

  • ISEE
    "Fast Rock Segmentation Using Artificial Intelligence to Approach Human-LevelAccuracy"

    By Ian Bell, Saman Nouranian, Shahram Tafazoli, Bahram Sameti, Mahdi Ramezani

    "Image-based rock fragmentation sensing in mining and quarry applications includes an important rock boundary delineation step, which is commonly referred to as rock segmentation. This paper presents

    Jan 1, 2017

  • ISEE
    O'Shaughnessy Dam Hydroelectric Project

    By Alan Hooper, James E. Mischler

    Construction began in 1984 for a 5 megawatt hydroelectric power retrofit at the O'Shaughnessy Dam for the City of Columbus, Ohio. The construction necessitated excavation of limestone bedrock up to 27

    Jan 1, 1986

  • ISEE
    Journal: 100 Years / The Engineering And Mining Journal New York August 10, 1907 Ground Breaking In The Joplin District Q786 Holes Are Drilled With Air Drills And Squibbed Before Charging. About 1 Pound Of Dynamite Is Required Per Ton Of Rock Broken

    By Doss Brittain

    The term ground breaking is taken to include the process of so loosening the ground as to enable it to be readily loaded into buckets or cars and hoisted from the shaft or drift. In the Joplin distric

    Jan 1, 2008