Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design Of Drilled Shafts Supporting Sound WallsBy Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007
-
A Decade Of Concrete Embedded Walls In UK - SynopsisBy Robert Fernie
Demographics and Infrastructure demands have led to a significant increase in construction of: deep basements for buildings and, trough structures for Highway and Rail/Metro. Concrete embedded walls u
Jan 1, 2000
-
Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 IntroductionBy Timothy L. Roberts
For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary
Jan 1, 1998
-
250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group TechnologyBy Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni
"Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity
Jan 1, 2014
-
Design & Construction Of Pile Foundations For A Building Complex - A Case HistoryBy S. K. V. Avasarala
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading tests and installation of over 3,300 prestressed concrete piles for a building complex c
Jan 1, 1995
-
Recent Advances In Soil Nailed Earth RetentionBy Tom A. Armour
Different variations of soil nailing techniques have been used in the United States since the late 1970's. Such techniques owe their origins to French developments, which began in the early 1970&
Jan 1, 2003
-
Installation, Design, And Quality Control Of Augercast Piles ? IntroductionBy William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
Effect Of Transverse Stresses On The Strength Of Steel Sheet Piling And Recommended Changes In Design ProcedureBy Richard J. Hartman
Current design practice is to select steel sheet piling sections using sufficient section modulus and yield strength to resist the calculated bending moment. Thus, section modulus is the only property
Jan 1, 2006
-
Development of a New, Advanced form of Sodium Silicate for Chemical GroutingBy Julie Shang, Tim Evans, Michael McDonald, Yu Guo, Bingfeng Xue
Effective chemical grouting represents a technical and economic solution to many challenges related to soil stabilization and blocking the flow of water. Chemical grouts are facing increasing demands
Jan 1, 2018
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003
-
Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.By Alexander J. Verstraeten
The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev
Jan 1, 1987
-
Anamolies Ammednments And Revision Of Is Code On Underreamed Piles - SynopsisBy A. V. Shroff
The Indian Standards code of practice for design and construction of underreamed piles contains provision for installing such piles in expasive soils. In recent years, a large amount of research work
Jan 1, 1996
-
Modern Procedures For The Design Of Driven Pile FoundationsBy G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988
-
Design And Instrumentation Results Of A Reinforcement Concrete Piled Raft Supporting 2500 Ton Oil Storage Tank On Very Soft Alluvium DepositsBy Shaw-Shong Liew
This paper presents the design concept using floating piles to support 2500Ton oil storage tanks on a very soft alluvial clayey soil of about 40m thick in Riau Province of Sumatra, Indonesia. The floa
Jan 1, 2002
-
Analysis Of Load Tests Of Drilled Shafts. For Support Of Overhead SignsBy Roy H. Borde
The design of foundations to support overhead signs is primarily based on providing adequate resistance against horizontal wind loads. The typically used subgrade reaction model for the load-deflectio
Jan 1, 1988
-
Foundations For The M25 Motorway Near To Heathrow AirportBy John F. Spence
Ever since opening, the M25 motorway to the west of London has carried a rapidly increasing volume of traffic. The section of M25 between the junctions with the M3 and M4 motorways, which is in the ne
Jan 1, 2007
-
Overview Of Design Methods Of Axially Loaded Piles In EuropeBy Flor De Cock
The paper reflects part of the work from the European Regional Technical Committee on Piles (ERTC3) during its mandate between 1994 and 1999, and, in particular, describes the findings from an Intern
Jan 1, 2002
-
Deep Excavations And Foundations For Locks ? SynopsisBy B. H. Moore
Foundation and excavation problems associated with lock construction projects vary widely. Each lock requires a different foundation to respond to a unique geologic setting. The range of heights and f
Jan 1, 2010
-
Practical Experience With Nondestructive Testing Of Augered Cast-In-Place PilesBy Bernard H. Hertlein
All methods of deep foundation construction present challenges to the contractor and engineer that vary according to the method employed, and the geotechnical conditions in which it is being used. Aug
Jan 1, 1997
-
Newfoundland Transshipment Project: Design-Build Construction Of Oil Tanker Wharf Using Permanent Steel Jackets. - Summary:By Alun J. Davies
This paper describes a design-build project for the construction of a tanker wharf for 150,000 dwt vessels. The tankers deliver oil from offshore oil fields to a Transshipment terminal on the south co
Jan 1, 2000