Pile Load Test Results Using The New Statnamic Method
By Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts
By Mary Ellen Bruce Large
"In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun
Jan 1, 2016
-
Workshop on Quality Assurance for Post-Grouted Drilled Shafts
By Mary Ellen Bruce Large
"INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC
Jan 1, 2016
-
The Soilex Pile System
By Erik M. Westerberg
The Soilex Pile combines a slender shaft, for quick and easy installation, with an enlarged pile toe, for high capacity. The key component is the Expander Body, which is inflated by injecting cement g
Jan 1, 2000
-
Design Considerations For Underground Subway Station - Introduction
By Mohammed Z. Islam
As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o
Jan 1, 1993
-
Quality Assessment Procedure And Classifications Of Cast-In-Place Shaft Using Low Strain Dynamic Test
By Liqun Liang
Various nondestructive testing (NDT) inspection methods are available to evaluate the structural integrity of cast-in-place shafts. The widely used methods include Cross Hole Sonic Logging Testing and
Jan 1, 2011
-
Collaborative Alliances – A Sustainable Way Forward For Construction?
By Stefano Trevisani
Abstract The FIEC Sustainability Vision states that “risks should be identified and allocated in a fair manner across the project team from the early stages of the design phase. A partnering approach,
Jan 1, 2014
-
Time-Dependent Bond Regain In Driven Piles In Permafrost ? Synopsis
By B. Ladanyi
The design philosophies for piles in unfrozen and frozen soils are compared, and their similarities and differences are underlined. It is shown that in frozen soils, the long term behavior of a pile i
Jan 1, 2010
-
Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil Conditions
By Lori A. Simpson
Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese
Jan 1, 2006
-
Instrumentation And Interpretation ? Introduction
By H. Mori
The session chairman, Dr. H. Mori, welcomed the delegates to Discussion Session 8. AUTHORS PRESENTATIONS 1 . G. Price, Building Research Establishment. UK Mr. Price expanded on the content
Jan 1, 1991
-
Installation And Performance Of Interlocking Drilled Shaft And Tieback Shoring System - Summary
By Alec C. Bloem
A 55' deep excavation encompassing almost a city block in London, Ontario required a lateral earth retention system to provide both temporary excavation support and a permanent groundwater cut-of
Jan 1, 1991
-
CPT - Guided Installation Of Pressure-Grouted Displacement Piles
By Mark M. Petersen
As part of the addition of eight new combined cycle generating units at the Florida Power & Light Sanford Plant, 2,129 piles were to be installed. The existing plant elements were supported on driven
Jan 1, 2002
-
Load Testing Of Deep Foundations Using The Osterberg Load Cell
By David E. Thompson
This paper describes the full-scale field load testing of three deep foundation units using the Osterberg Load Cell. The load tests were completed on three separate projects, two in Massachusetts and
Jan 1, 1989
-
Value Engineering – Design Risk and Reward at Major Sport Arena Projects
By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli
Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw
Jan 1, 2018
-
Pore Water Pressure Response and Effect on Installation Torque of Large Diameter Helical Piles in Soft Soils
By Howard A. Perko, M. Mae Benvenga, Heather H. Trantham
Displacement of soil and groundwater during helical pile installation can produce excess pore water pressures (PWP) in fine-grained soils. Pore water pressure reduces effective stress in the soil imme
Jan 1, 2018
-
Development and Experiences on Versatile Applications of RD-pile Wall
By Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
-
Some Problems Encountered During Pile Installation - Synopsis
By [D. N. ] Naresh
During different activities pile installation like pile boring, concreting etc., it is likely that various problems, depending up on site condition may be encountered. There are possibilities that som
Jan 1, 1996
-
Guidelines for Selecting Cutoff Wall Systems
By Mary Ellen Large
This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system
Jan 1, 2021
-
History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982
By Hal W. Hunt
Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng
Jan 1, 1984
-
Drilled Piers In The Piedmont - Introduction
By Stanley A. Schwartz
In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The
Jan 1, 1988