Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Using The Six Sigma Approach Towards A Metallurgical Project: Nickel Loss Reduction And General Improvements To The Raglan Rougher Flotation Circuit

    By C. Ciriello

    Six Sigma methodology, as applied within Xstrata (formerly Falconbridge and Noranda), involves a disciplined approach to managing projects, solving problems, improving performance, and leveraging info

    Jan 1, 2007

  • CIM
    Operating Experience and Developments of G-Rex and Aurix100 Resin Exchange Technology

    By Peter Richards, Alexander Lewis-Gray, Mark Davies, Nicholas Katsikaros

    "Gekko Systems developed the Gekko Resin Exchange Column (G-REX) in order to optimise the recovery of gold in complex leach-to-electrowinning processes, as an intermediate step using a highly gold-sel

    Jan 1, 2016

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    High Chromium White Irons for Slurry Pump Service in Mineral Processing

    By Rees J. Llewellyn

    High chromium white irons can be formulated to provide required combinations of abrasion and erosion wear resistance, toughness and capability to withstand corrosion attack. As a consequence, they are

    May 1, 2004

  • CIM
    Computer assisted economic analysis to select a stoping method

    By R. R. Tatiya

    "The ultimate aim of a mine design is to determine the development work involved and resources required by adopting one or more specific alternatives. A part of the process is the production of mining

    Jan 1, 1998

  • CIM
    Radium-226 removal from a uranium mill effluent-physical/chemical treatment process development studies

    By R. Webber, D. Averill, L. Whittle, D. Moffeti, G. Kassakhian

    "This paper describes the recent pilot-plant work carried out on two alternative processes capable of producing an effluent containing less than 10 pCi/L total radium-226 activity and very close to 3

    Jan 1, 1980

  • CIM
    Simulating the Mine-Mill Interface

    By J. A. Meech, G. R. Baiden

    "A dynamic simulation of a mine-mill complex has been conducted using networked microcomputers (IBM PC/AT and IBM PC/XT). These models allow simultaneous operation of an open pit using shovels and tru

    Jan 1, 1987

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • CIM
    Case histories in tile use of Pulse EM from surface and boreholes as an aid in the detection and definition of deep ore deposits

    By J. Duncan Crone

    "A test surface Pulse EM(PEM) survey over a plunging massive sulphide lens, located in the Snow Lake area of Manitoba, has shown that it is possible to detect the body to a depth of 300 metres. Anothe

    Jan 1, 1985

  • CIM
    Remote Real-Time Tire Monitoring in Open Pit Mines

    By Joel T. Werner

    Tire costs represent one of the highest controllable costs in open-pit mining, accounting for approximately 10% of mining costs. Tire monitoring technology has evolved rapidly in recent years and is e

    May 1, 2002

  • CIM
    Mining Laws of British Columbia and Some Notes on Blue Sky Legislation

    By Arthur M. Whiteside

    Discussion of the laws bearing upon the economics of mining in this province at once resolves itself under three headings: (a) The rights and obligations of holders of mineral bearing lands; (b) Ta

    Jan 1, 1924

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Evolution of a Mine Development System: Tunnel Boring Machine I&C Cameco Cigar Lake

    By Neil H. Brown

    Outline ? Cameco - Cigar Lake ? Cigar Lake Mine Development ? MDS #1 ? MDS #1 Improvements ? MDS #2 ? MDS #2 Improvements Pending ? Acknowledgements Mine Development System ? Mining methods t

    Oct 1, 2010

  • CIM
    Kinetics and Mechanism of the Low-Temperature Water-Gas-Shift Reaction on Au/CeO2 Catalysts

    By M. Kinne

    Catalyst preparation/ characterization Slightly modified DP (~Schumacher et al. Catal. Lett. 89, 109, 2003) CeO2 HAS 15 from Rhodia calcined in air for~ 2h BET: ~188m2/g, particles size: 5.7nm (TEM

    Oct 1, 2003

  • CIM
    Pencil bit tooling for continuous miners in potash

    By Eric Best

    "In the past two to three years, all continuous mining machines at the Potash Corporation of Saskatchewan Mining Limited, Lanigan Division, have been changed over to a new cutting pattern using 1 -inc

    Jan 1, 1981

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Matching Motor to Mill Torque with Variable Speed Drives

    By Craig M. Sams

    "Variable speed mill popularity has grown during the last 10 years with almost every SAG mill fitted with a variable speed drive. In addition, many of today’s larger ball mills are running a variable

    Jan 1, 2007

  • CIM
    Dust Control at Steep Rock Iron Mines Pelletizing Plant

    By P. S. Capper

    "Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr

    Jan 1, 1976

  • CIM
    On-Stream Analysis (OSA) of Industrial Slurries for Process Control and Optimization Using Laser-Induced Breakdown Spectroscopy (LIBS)

    By Guy Chevalier, Jean-Guy Chartrand, Louis Barrette, Daniel Michaud, Michel Fortin

    "COREM has developed, specifically for the mineral industry, a mobile laboratory using the Laser-Induced Breakdown Spectroscopy (LIBS) technique. It has been used to perform onstream analysis (OSA) of

    Jan 1, 2004

  • CIM
    Data Reassessment of Airborne Geophysical Survey of the Matheson Area - Discover Abitibi Initiative

    By Ken Witherly

    Modern airborne EM surveys typically acquire more data than is processed or analyzed at the time of acquisition Suitable additional processing can provide more diagnostic information, thereby allowin

    Apr 1, 2005