Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Pipeline syphons for economical and simple water transfer (0f637445-7793-433d-94a6-80e764b3d98e)

    By W. J. Dick, K. G. Kress

    A pipeline syphon can be a simple and reliable alternative for water conveyance as compared to otherwise more complex pumping systems or low-level outlet conduits through earthfill dams. In a simple f

    Jan 1, 2005

  • CIM
    Flash Flotation at Hudson Bay Mining and Smelting

    By L. Betteridge, A. Marks

    "An OK 300 cu. ft. Skim - Air cell was installed at the HBM&S concentrator in Flin Flon in 1987. Since that time, 3 additional OK Skim - Air cells have been installed in HBM&S concentrators. The cell

    Jan 1, 1991

  • CIM
    The Application of Large Scale Stirred Milling to the Retreatment of Merensky Platinum Tailings

    By Stephan Buys, Dan Curry, Chris Rule

    "The use of fine grinding (FG) in mineral processing is well established. The application of FG in the South African platinum industry is more recent and it’s use in the recovery of PGM’s from dormant

    Jan 1, 2005

  • CIM
    Rubber Lining Design for Grinding Mills: Influence on Economy and Capacity

    By Gustav Nillson

    There is a difference in design parameters between steel linings and rubber linings for grinding mills. The basic design parameters for rubber are described and a comparison is made between steel and

    Jan 1, 1979

  • CIM
    Self-Tuning Flotation Control at Brunswick

    By M. W. Franklin, D. W. Hendriks

    "Changing ore types, feed grades and c1rculat1ng loads are some of the many factors that can make flotation feed-back control difficult. To control a flotation circuit using conventional fixed-paramet

    Jan 1, 1986

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Environmental and ventilation benefits for underground mining operations using fuel cell powered production equipment (0d6b8fbf-8199-4422-8088-a542f4b15d8b)

    By D. Eastick, S. Hardcastle

    "Over the last few years, a multi-faceted feasibility study has been evaluating the introduction of hydrogen fuel cell-powered equipment into underground mines to replaced diesel engine-powered equipm

    Jan 1, 2007

  • CIM
    Mill Operations - Lean and Keen

    By P. R. Richardson

    "Milling is the weak link in the process chain of many mineral operations. While this activity accounts for only a relatively small proportion of the direct costs of most mineral processing complexes,

    Jan 1, 1988

  • CIM
    An Approach to Energy Management at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    "A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc. over progressively shorter time peri

    Jan 1, 1979

  • CIM
    Multivariate Geostatistical Simulation at Red Dog Mine, Alaska, USA

    By Oy Leuangthong

    Red Dog mine is the world's largest Zn producer. The deposit consists of sulphide ore zones in sedimentary exhalative (sedex) deposits, and is characterized by the presence of multiple metals and

    May 1, 2004

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010

  • CIM
    The Evolution of Falcon Continuous Concentrators at Tantalum Mining Corporation of Canada

    By Claude Deveau

    "With ever decreasing feed grades, finer mineralogy and increased demand for product, it became obvious that a major step in equipment performance was required to reduce operating costs and increase p

    Jan 1, 2000

  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • CIM
    Hardness Model and Reconciliation of Throughput Models to Plant Results at MINERA Escondida LTDA., Chile.

    By Leonardo Flores

    "Minera Escondida operates two open pits on a porphyry copper district, southeast of Antofagasta, Chile. During 2005, ore will be delivered exclusively from one pit to two concentrators, while from 20

    Jan 1, 2005

  • CIM
    Company Liaison to Company Advocate

    By Walter Smith

    Environmental Quality Committee ?EQC was created in 1995 to facilitate dialogue between industry and northern communities and help build the understanding of the industry in those communities. ?EQ

    Nov 1, 2011

  • CIM
    Development of a Mathematical Programming Model to Support the Planning of Short-Term Mining

    By Camilo I. Morales

    At present, many open pit mines are designed to operate and feed a processing plant with ore characteristics that were defined in the design of the mining business, which are not necessarily the same

    Oct 1, 2009

  • CIM
    Advanced Control for Mineral Processing: Better Than Expert Systems

    By Robert K. Jonas

    "Minerals processors can improve production by using the best available control technology to control their operations. Many mines use expert systems that can provide improved results over manual or b

    Jan 1, 2008

  • CIM
    Where Did that Earbud Come From? Current Rare Earth Production Facilities

    By J. R. Goode

    Rare earth elements (REE) and their compounds are critical ingredients in numerous necessities of modern life including: the permanent magnets used in electric motors, generators, speaker and hard dri

    Jan 1, 2016

  • CIM
    Establishing a vegetative cover on base metal tailings-experience at Buchans, Newfoundland

    By Paul J. O'brien, George N. Neary

    "The base metal mine at Buchans, Newfoundland, has been producing since 1928. For many years, mill tailings were disposed of by dumping into a nearby natural watercourse via which they were transporte

    Jan 1, 1981

  • CIM
    South African Progress on closing the Design Gap between high- and Low-Aspect SAG mills

    By Malcolm Powell

    "The argument has long raged across the oceans as to what the best AG/SAG mill aspect ratio is. The North American practice of a high aspect ratio of two, diameter twice length, through to the South A

    Jan 1, 2002