Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Mining 1n Canada's Sub-Arctic . . . The Iron Ore Company of Canada

    By P. W. A. Mayer

    "As the push toward the northern regions of Canada steadily increases to exploit the rich mineral reserves, interest is steadily rising in respect to accessibility and climatic conditions and the prob

    Jan 1, 1966

  • CIM
    The Bulk Terminal in Today's Traffic Pattern

    By T. G. Phillips

    "This paper gives an inside look at a bulk terminal and describes the preparations that must be made by a company in developing such a terminal and its position in today's traffic pattern. The followi

    Jan 1, 1968

  • CIM
    Kemess South Mine Closure and Reclamation

    By Georgia J. Lysay

    Kemess South Mine ended operations in March 2011. Final reclamation works began during operations in 2008 in anticipation of closure. The focus of reclamation during mine operations was on the inactiv

    May 1, 2011

  • CIM
    Energy savings using synthetic lubricants

    By K. A. Hildebrant, J. R. Norgate

    "Synthetic lubricants have for many years documented extended service life and provided superior performance in temperature extremes. Increasing interest in synthetics' ability to reduce energy c

    Jan 1, 1994

  • CIM
    Testing of Flocculant-Assisted Hydrocyclone on Quebec Cartier Mining Company's Iron Ore Tailings

    By T. Yalcin, S. Brunet

    The flocculant-assisted hydrocyclone involves the addition of a flocculant to the cyclone feed for the purpose of obtaining a clear cyclone overflow, and thereby eliminating or reducing thickener requ

    Jan 1, 2004

  • CIM
    Fundamental Studies of Sulfides Pressure Oxidation

    By Jian Li, Robbie McDonald, David Robinson

    "The pressure oxidation of sulfide minerals at temperatures above 200°C enables the extraction of base metals, improves the extractability of gold from refractory ores, enables solubilisation of PGEs

    Jan 1, 2017

  • CIM
    Integrity Monitoring Of Xstrata Copper's Kidd Metallurgical Division Mitsubishi 3-Line Furnaces Using Multivariate Methods

    By P. Nelson

    Extending the campaign life of the Mitsubishi furnaces at Xstrata Copper's Kidd Metallurgical Division Copper Smelter has been a major focus of attention for many years. One aspect of this effort

    Jan 1, 2007

  • CIM
    Reduction of Silver Loss in Copper Cathode

    By Nitin Bhavsar, Kaushik Vakil, Lakshmikanth Reddy, Sanjay Sarkar, Tathavadkar. Vilas, Bhavin Desai, Raghavendra Adiga

    Gold and platinum group metals (PGM) do not dissolve in sulfate electrolyte from anode during electro-refining of primary copper. The PGM form solid ‘slimes’ which accumulates at bottom of the electro

    Jan 1, 2019

  • CIM
    Relative Kriging Errors - A Basis for Mineral Resource Classification

    By Garston Blackwell

    Abstract - During geostatistical estimation of block grades, the kriging process produces a measure of error, the kriging variance or the kriging standard deviation. Estimation of the block error depe

    Jan 1, 1998

  • CIM
    Upgrading The JK SAG Mill Model

    The original JKMRC AG/SAG mill model was developed over 30 years ago and has been upgraded a number of times since then, with the current published version being the Variable Rates model that is now o

    Jan 1, 2012

  • CIM
    Battery Energy Storage As A Way To Reduce Remote Mine Electricity Costs

    By Jakob Janzen

    This paper demonstrates that the introduction of a Battery Energy Storage System (BESS) into an isolated diesel generator based grid has the potential to reduce the electricity cost and deliver a good

    Aug 1, 2013

  • CIM
    Design of an Overburden Storage Structure in Northern Alberta

    By Nabeel Khan

    Annual oil production from the Canadian Oil Sands in Northern Alberta has been rising for several decades, and more ore and overburden are excavated each year from an increasing number of open pit min

    Jun 1, 2012

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    Preliminary Implementation of a Predictive Control for Ventilation Systems in Metro Stations

    By M. Vaccarini

    In this paper a possible methodology to supplement a predictive control approach is reported. The benefits deriving from the application of a predictive control on complex buildings lay on its capabil

    Aug 1, 2013

  • CIM
    Algoma Uranium District

    By Franc R. Joubin, Donald H. James

    "The Algoma (or Blind River) uranium district is centred in an area of some 600 square miles on the north shore of Lake Huron, about half way between Sudbury and Sault Ste. Marie, Ontario (Figure 1).

    Jan 1, 1949

  • CIM
    Chemical hydrogen storage for automotive applications

    By Davis. B. R.

    There are a number of hydrogen storage systems proposed for automotive applications. However, all of the current suggestions fall short of the DOE targets for storage density and volumetric density. T

    Jan 1, 2005

  • CIM
    Mineralogical Characterization and Metallurgical Processing of Seafloor Massive Sulphides from the German License Area in the Indian Ocean

    By M. Sommerfeld, U. Schwarz-Schampera, B. Friedrich, D. Friedmann

    The steadily growing demand for metals and their price increase at metal exchanges make the mining and utilization of marine mineral resources like polymetallic nodules, manganese crusts or sulfide de

    Jan 1, 2019

  • CIM
    Electromagnetic refinement of the 319 aluminum casting structure

    By F. C. Robles Hernandez

    This paper presents the results of the electromagnetic semi-solid treatment of the 319 aluminum foundry alloy, Various levels of structure modification were achieved controlling the AC current used to

    Jan 1, 2004

  • CIM
    Optimization Initiatives at Altonorte on the Path to Becoming a World Class Smelter

    By Beatrice Pierre, Juan Carrasco

    Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001

    Jan 1, 2019

  • CIM
    Assessment of Gravity Recoverable Gold

    By G. E. Agar

    "The distribution of gold in the grinding-classification circuit of an operating gold plant was determined by assaying the size fractions of samples from each of the streams. This analysis identified

    Jan 1, 1993