Commissioning of the BIOX and ASTER™ Processes at the Runruno Gold ProjectBy M. Savella
The Runruno Gold Project is located on the island of Luzon, approximately 200 km north of Manilla in the Philippines. The mine is a surface mine operation and use the proven BIOX® and carbon in leach
Jan 1, 2017
-
Flexibility of the Outokumpu Flash Smelting for Low and High Grade Concentrates - Evaluation By CFD-ModelingBy K. Eklund, T. Ahokainen
The Flash Smelting process is the most used production method for primary copper in the world. The basic idea of the Flash Smelting is to utilize the thermal value of sulfidic concentrates and melt th
Jan 1, 2007
-
Study of the Fatigue Resistance of very thin Brazed Aluminum Materials used in Car Heat ExchangersBy J. Paturaud, A. G. Villemiane, J. Y. Buffiere, D. Fabregue, M. Perrier
In this work, a detailed characterization of the cyclic damage mechanisms on duty in car heat exchangers has been carried out in order to improve their reliability. The material which consists in very
Jan 1, 2015
-
Evaluation of cable bolt applications for Canadian underground minesBy J. Kalynchuk, R. Poulin, R. Pakalnis, D. Peterson
"A market survey of all underground mines in Canada (Fig. 1) was completed to determine the ex1ent to which cable bolts are being used as ground support. One hundred and nine questionnaires were distr
Jan 1, 1995
-
Electrodeposition of Cobalt Metal: Effect of Sodium Octyl SulphateBy B. C. Tripathy, S. K. Padhy, R. K. Paramguru, Pinak Patnaik
"Cobalt is regarded as technology enabling metal among the less abundant metals found in the earth crust. Electrodeposition of the metal from aqueous sulphate solutions is the preferred technology for
Jan 1, 2016
-
The Carbon Footprint of Grinding MediaBy Paul W. Shelley, Daniel J. Hodges
The mining industry is undergoing a period of rapid transformative change. This is the result of the social and financial accountabilities that the industry is faced with because of the world&rs
May 4, 2025
-
Characterization and Upgrading of Ore Based Steelmaking SludgesBy C. Samuelsson, H. Ahmed, B Björkman, A. Andersson
The cost of raw material and energy is a continuing driving force towards working with increasing the recycling of ore based steelmaking residues. In Sweden no on-site sinter plants are operated at th
Jan 1, 2015
-
Influence of Geological and Meteorological Factors on the Failure Mechanisms and Frequency of RockfallsBy J-P. Rossetti, A. Guerin, M. Jaboyedoff, L. Baillet, A. Mariscal, J. D'Amato, D. Hantz
"The processes leading to the fall of rock compartments from rock walls are poorly known as well as their velocity. It ensues that quantitative prediction of the failure time for a rock compartment wh
Jan 1, 2015
-
The H. B. ConcentratorBy H. J. Chalmers
THE H.B. MINE and concentrator are located in the Nelson Mining Division of British Columbia, on the north side of the Sheep Creek valley about seven miles southeast of the town of Salmo. It is an ope
Jan 1, 1957
-
Design, Construction, and Commissioning of Air Separation Units in Remote LocationsBy K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko
In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located
Jan 1, 2014
-
McKenzie Red Lake Gold Mines, LimitedBy The Staff
THE property of McKenzie Red Lake Gold Mines, Limited, consists of eleven claims located on McKenzie island in Red lake. The mine is about 4,Y:l miles by water from the Howey townsite on the same lake
Jan 1, 1938
-
Mill Tailing Disposal at HollingerBy The Mill Staff
Introduction The Hollinger cyanidation mill commenced operating in June, 1912, and 49,779,978 tons of solids had been discarded by the end of 1950. The present tailing disposal plant has been in oper
Jan 1, 1951
-
Qualification of Al-Cu Casting Alloys for Application in Permanent Mold Casting ProcessesBy B. Tonn, F. Kröger
"The continued development in engine technology is leading to an augmentation in power density which steadily elevates the requirements for thermally and thermo-mechanically highly loaded components s
Jan 1, 2017
-
Sintering at ConistonBy A. G. Roach
Introduction The plant described in this paper is located at Coniston, Ontario, the smelting centre of the former Mond Nickel Company. Coniston is situated some eight miles east of Sudbury on the mai
Jan 1, 1932
-
Slim-Hole Drilling and 2 1/2.-lnch Casing, Tubingless CompletionsBy John H. Nicholls
In this paper, Imperial Oil Limited reports briefly on the drilling by contract rigs of twenty-nine slim holes in the Virden, Smiley, and Souris Valley areas. The investigations showed that slim-hole
Jan 1, 1958
-
Applications of Fracture Mechanics in Failure PreventionBy W. J. Langford
"Conventional design criteria assume that the fracture strength of a structural material exceeds its yield strength. Fracture below the design load is not expected, y et many structures have failed in
Jan 1, 1976
-
The Pembina Miscible Displacement Pilot and Analysis of its PerformanceBy H. Groeneveld, C. A. Connally, P. J. Hoenmans, W. L. Mason, John J. Justen
"A miscible displacement pilot, using a slug of LPG driven by separator gas, was conducted in the Cardium Reservoir of the Pembina Field. The injection pattern was a 10-acre, inverted, isolated five-s
Jan 1, 1960
-
The Calculation and Use of Sulfide Metal Contents in the Study of Magmatic Ore Deposits: A Methodological AnalysisBy Andrew Kerr
Abstract - The base-metal and PGE contents of samples from magmatic sulfide mineralization are commonly correlated with their sulfide contents, indicating that the metal contents of bulk sulfides rema
Jan 1, 2001
-
Prospection Alluvionnaire (Minéraux Lourds)en Gaspésie- Traitement des Donnés et Comparaison Avecles Résultats Géochimiques en Sédiments de RuisseauBy Robert L. Tremblay
Dans le but de voir si une région comme la Gaspésie, qui a subi la derniere glaciation , se prête avantageusement à la méthode de prospection alluvionnaire, environ 800 concentrés de minéraux lourds f
Jan 1, 1978
-
Experiences with Real Time Equipment Monitoring ? Using Advanced Analytics to Equipment Life and Reduce CostsMining Equipment Challenges Equipment Availability Unplanned downtime Maintenance Costs Secondary damage and catastrophic failures (T282 $750k) Emergency work is 4x the cost of planned work Ins
May 1, 2013