Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Microstructural Study of the Fatigue and Dwell-Fatigue Behaviour of ATI 718plus® Alloy

    By S. Oppenheimer, P. Au, R. M. Kearsey, J. Tsang, E. McDevitt

    A new superalloy, ATI 718Plus® Alloy (718Plus), has been developed to have a 55oC higher temperature capability over the traditionally used Alloy 718, while maintaining favourable processing character

    Jan 1, 2010

  • CIM
    Mineralogy, Geochemistry, and Origin of the Magnet Cove Barite-Sulphide Deposit, Walton, N.S.

    By J. L. Jambor, R. W. Boyle

    "The Magnet Cove barite-sulphide deposit is a raking pipe-like body that replaced and partly filled a large brecciated zone at the junction of two faults at the contact between sedimentary rocks of th

    Jan 1, 1966

  • CIM
    Investigation into Oxidative Dissolution of Enargite with Chlorine Dioxide

    By G. W. Norval, V. G. Papangelakis, G. A. Moldoveanu

    Smelting has been the primary method of treatment for refractory copper sulfide concentrates such as enargite (Cu3AsS4), but the pyrometallurgical processing generates elevated levels of volatile arse

    Jan 1, 2014

  • CIM
    The Tramline

    By Peter C. Jones

    Owing to the inadequacy of the ore transport system at Cassiar in the late 1960's, a new facility was required. This paper traces the various alternatives considered and gives a description of th

    Jan 1, 1978

  • CIM
    The first cyanide leaching plants in Canada

    By J. E. Dutrizac, J. B. Sunstrum

    Until relatively recent times, virtually all gold was recovered by gravity and/ or amalgamation methods. Although such techniques are very effective on coarse gold, they become increasingly less usefu

    Jan 1, 1999

  • CIM
    The Wilberforce Radium Occurrence

    By Hugh S. Spence

    This paper deals with an occurrence of radium ore near Wilberforce, Haliburton county, Ontario, upon which development work has recently been undertaken and which seems more likely to prove of commerc

    Jan 1, 1930

  • CIM
    Recovery of Iron from Waste Slag of Pyrite Processing Using Reduction-Roasting Magnetic Separation Method

    By A. McLean, Q. R. Yang, Y. D. Yang, G. F. Zhang, P. Wu

    A considerable amount of waste slag from the pyrite roasting process is discharged every year. Recovery of iron from the waste slag is of great interest for comprehensive use of mineral resource, redu

    Jan 1, 2011

  • CIM
    Points of View on the Rock-Burst Problem

    By R. G. K. Morrison

    As mines grow deeper, the problem of ground control becomes one of increasing importance. The literature on the subject has grown extensively in the past few years, but is still far from conclusive. D

    Jan 1, 1939

  • CIM
    The Geological Survery of Canada

    By F. W. Gray

    Foreword: It is not my purpose, in this address, to write the history of the Geological Survey of Canada, which has from time to time been reviewed by the officers of the Survey itself, and by men m

    Jan 1, 1932

  • CIM
    Milling a Gold-Bearing Pyrrhotite Ore at Delnite Mines

    By C S. Stevens

    This paper describes the problems encountered and the steps taken to solve them in milling an ore containing relatively large amounts of pyrrhotite. A complex and greatly lengthened flotation circuit

    Jan 1, 1965

  • CIM
    Coarse and Fine Particle Flotation

    By M. Fan, H. E. Wyslouzil, J. Kohmeunch

    Eriez HydroFloat(TM) separators and Canadian Process Technologies (CPT) flotation columns have been developed to overcome the limitations of traditional flotation cells in recovering coarse and fine p

    Jan 1, 2009

  • CIM
    Evaluation of Spent Alkaline and Zinc-Carbon Battery Recycling Using Ascorbic Acid, Activated Carbon and Guar Meal Reductants

    By S. Kursunoglu

    The aim of this study was to investigate the effectiveness of Ascorbic (C6H8O6) Acid (AA), Activated Carbon (AC) and Guar Meal (C6H12O6) (GM) as a reductant for the simultaneous complete dissolution o

    Aug 1, 2013

  • CIM
    Application of Modified Voce-Kocks Constitutive Material Model to Elevated Temperature Forming of 7XXX Series Aluminum Sheet

    By M. K. Jain, Z. T. Xu, M. Bruhis, V. Hegedekatte

    "Strain rate and temperature dependent deformation conditions are present during elevated temperature forming of aluminum and other metallic materials. While many constitutive laws have been proposed

    Jan 1, 2018

  • CIM
    Enhancing Gold Recovery from Nevada Double Refractory Gold Ores using a Novel Dual Bubble Generator

    By Haipeng Li, Jacob Masliyah, Barun Gorain, Jian Huang, Qingxia Liu, Zhenghe Xu, AuTec Innovative Extractive Solutions Ltd.

    "Froth flotation is widely used to selectively separate one or more minerals from an ore over a wide range of particle sizes with high efficiency. Bubble–particle attachment is one of the most critica

    Jan 1, 2016

  • CIM
    Non-fibrous insulating castable which utilize micro porous aggregat

    By K. Fujita, T. Kikuchi, Y. Sakamoto

    Ceramic fibers were classified as a category 2 carcinogen by The European U legislation. Therefore we developed non-fibrous insulating castable which utilizes n porous aggregate, which is composed of

    Jan 1, 2004

  • CIM
    A Web-based Approach to Control Loop Assessment in a Mineral Processing Facility

    By Dave Shook

    A Mineral Processing facility in Montreal has recently implemented a leading-edge intranet solution for monitoring the performance of plant operations, and providing condition-based maintenance. This

    May 1, 2002

  • CIM
    An Empirical Demonstration of Geophysical Methods Across The Caribou Deposit, Bathurst, N. B.

    By J. D. Corbett

    The spatial coincidence of the seven anomalies is obvious, even though the self-potential is offset northward. Because the ratio, as an indicator of conductivity, is a relative estimate at best, conci

    Jan 1, 1961

  • CIM
    Mining strategy for the Retreat Zone at Noranda's Bell-Allard mine

    By V. Falmagne

    The mining sequence at Noranda?s Bell-Allard mine calls for two mining fronts retreating toward a central pillar known as the Retreat Zone between pyramids A and C. It is clear from numerical modellin

    Apr 1, 2004

  • CIM
    Optimum Planning for Multi-Project Earthmoving Operations

    By S. Abu-Samra

    By virtue of its complex nature, the construction industry comprises a wide spectrum of interrelated variables and factors. This multifaceted character of the construction industry puts the use of eng

    Aug 1, 2013

  • CIM
    Chapter 1. Formation of an Agreement

    By Karl J. C. Harries

    "1.1. WHAT ARE AGREEMENTS AND HOW ARE THEY FORMED?In order to have an agreement, at common law, there must be an offer, acceptance of that offer, and consideration passing between the parties. In addi

    Jan 1, 2003