    Ancient Thermotectonic Analysis as a Factor to Judge the Tectonic Setting of Early Precambrian Mobile Belt

    By Fengyan D

    Removing the interference of latter events, the data of geophysical (such as gravity and aeromagnetic) anomalies may indicate whether the mobile belt exist and whether the adjacent terrains of the mob

    Jan 1, 1990

  • AUSIMM
    Planning, Design and Construction of a Small Multi-use Tunnel in an Urban Environment

    The planning, design and construction of a service tunnel, under a major arterial road between two hospitals are described. The multiple uses of the tunnel combine to provide a favourable cost-benef

    Jan 1, 1981

  • AUSIMM
    The Effect of Nickel on Fire Assaying Processes for the Determination of Silver

    A study of the effect of nickel on the cupellation process has shown that a very low "nickel limit" must be imposed for cupellation (0·08 grams nickel or 0·05 grams when copper is

    Jan 1, 1960

  • AUSIMM
    Quantification of Mine-Related Effects on Streamflows

    By W Boughton, L Gilbert

    The Australian Water Balance Model (AWBM) has found widespread use in Australia in estimating the streamflow behaviour of catchments. It has been used at the Ridgeway Gold Mine, in central west New So

    Jan 1, 2006

  • AUSIMM
    Platinum-Bearing Magmatic Rocks of the Southern Brook Street Terrane, South Island, New Zealand

    By J Mavrogenes, C J. Spandler, S M. Eggins, K Worden

    Major occurrences of platinum group minerals (PGM) are in crustally-contaminated, huge, layered igneous complexes (Bushveld and Stillwater) and gabbroic intrusions (Norilsk); relatively minor occurren

    Jan 1, 2005

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Iron-Making Melter

    By Gregory O, Winters BI, Garlick C, Rogers H, Ye ZC

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multi- hearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-

    Jan 1, 1995

  • AUSIMM
    Optimisong Mine Development - The Real Key to Profitability

    Optimisation of capital in the development process is critical to the profitability of any new mining venture. The process of optimisation should apply to all aspects, that is the financing, managem

    Jan 1, 1991

  • AUSIMM
    Geology in Exploration: Mount Lyell Example

    This is the second of a series of papers dealing with Geology in Exploration. The first, published by the Australasian Institute of Mining and Metallurgy, Proceedings Nos. 143-144, 1946, was written a

    Jan 1, 1947

  • AUSIMM
    Geotechnical Studies for Open Pit Mines - West Australian Operating Experience

    Recent operating experience from West Australian open pit gold mines has shown that geotechnical input into initial design is rare. As a result, ground stability is poor - almost half the pits designe

    Jan 1, 1990

  • AUSIMM
    Development of Explosive Monitoring Techniques for Use in Quality Control and Production Blast Analysis

    By Moxon NT, Torrace AC

    The detonation pressure of an explosive is a function of its density and its velocity of detonation (VOD) and relates directly to the degree and manner in which the explosive loads the surrounding r

    Jan 1, 1988

  • AUSIMM
    Outsource or Owner Operate

    The decision to contract or owner mine should be independent of, and should be made before, definitive estimated cost comparisons could be available. There is substantial potential risk of estimated c

    Jan 1, 2003

  • AUSIMM
    Application of Mining Process Simulation to Reduce Risk, Costs and Improve Operational Performance

    By P Hawkes

    Within the mining industry computers have made their most significant impact with 3D design, visualisation and resource modelling/ optimisation. Recently, the application of computers to data gatherin

    Jan 1, 2003

  • AUSIMM
    Geomechanics: An Art to a Science?

    This paper discusses why Argyle Diamonds adopted thickened tailings disposal in 1985 and how the system was developed over the next seven years. A wide ranging review of the thickened tailings disp

    Jan 1, 1996

  • AUSIMM
    Bucket Wheel Excavators for Latrobe Valley

    The paper describes the development leading to the bucket wheel excavator systems now used in the Latrobe Valley and refers in particular to the new S.E.C.V. dredgers Nos. 14 and 15 which will be

    Jan 1, 1982

  • AUSIMM
    The Mismatch of Exploration Activity and Geology Graduates

    By Watkins JR

    Movements in the mineral trade cycle are almost invariably out of phase with the gradua- tion rate of mining engineers, metallurgists and geologists. This commonly leads to situations where graduat

    Jan 1, 1982

  • AUSIMM
    An Approach to the Evaluation and Control of Blast Induced Damage

    By Scott A

    The object of most blasting operations is to destroy the insitu structure of the rock mass so that mechanical equipment can efficiently excavate the rock fragments. In achieving this objective the b

    Jan 1, 1990

  • AUSIMM
    Resource Classification ù A Case Study From the Joffre Hosted Iron Ore of BHP Billiton Æs Mt Whaleback Operations

    It is recognised by the current JORC (1999) code that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological continuity and

    Jan 1, 2002

  • AUSIMM
    Modern Volcanic Concepts - Basalt Volcanic System

    Here, in what is partly a review and partly a personal viewpoint, I take stock of changes in emphasis and comprehension on the subject of basaltic volcanism in the decade that has passed since the com

    Jan 1, 1990

  • AUSIMM
    Tarong Power Station Ash Thickening Plant

    By C Hertle

    GHD-Black & Veatch (GHD-BV) have completed design and specification of the ash thickening plant at Tarong Power Station, including operation of a pilot plant. Construction of the plant is in progress

    Jan 1, 2003

  • AUSIMM
    Optimisation of the Milling Design of the Chessy Project Near Lyon, France

    By Gallet M, Watsford R. M S

    The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and

    Jan 1, 1991